Results 701 - 750 of 6,916
Sorted by Date | Sort by Relevance
Klamath River Renewal Corporation and PacifiCorp; Notice of Availability of the Draft Environmental Impact Statement for the Surrender, Decommissioning, and Removal of the Lower Klamath Hydroelectric Project
Document Number: 2022-04537
Type: Notice
Date: 2022-03-04
Agency: Department of Energy, Federal Energy Regulatory Commission
for the Surrender, Decommissioning, and Removal of the Lower Klamath Hydroelectric Project In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory [[Page 12446]] Commission's (Commission) regulations, 18 CFR part
Dairyland Power Cooperative; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
Document Number: 2022-04534
Type: Notice
Date: 2022-03-04
Agency: Department of Energy, Federal Energy Regulatory Commission
that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Non-Project Use of Project Lands and Waters. b. Project No.: 1960-080. c. Date Filed: November 1, 2021
Idaho Power Company; Notice of Intent To Prepare an Environmental Assessment
Document Number: 2022-04250
Type: Notice
Date: 2022-03-01
Agency: Department of Energy, Federal Energy Regulatory Commission
to amend the license for the Hells Canyon Hydroelectric Project No. 1971 (FERC No. 1971). The Hells Canyon Project is located on the Snake River in Adams and Washington counties, Idaho and in Wallowa, Malheur, and Baker counties, Oregon. The project
Endangered and Threatened Wildlife and Plants; Endangered Species Status for Peppered Chub and Designation of Critical Habitat
Document Number: 2022-03703
Type: Rule
Date: 2022-02-28
Agency: Fish and Wildlife Service, Department of the Interior
We, the U.S. Fish and Wildlife Service (Service), determine endangered species status under the Endangered Species Act of 1973 (Act), as amended, for the peppered chub (Macrhybopsis tetranema), a freshwater fish species historically found in Colorado, Kansas, New Mexico, Oklahoma, and Texas, which is now extirpated from all but six percent of its historical range. We also designate critical habitat. In total, approximately 872 river miles (1,404 river kilometers) in New Mexico, Oklahoma, and Texas fall within the boundaries of the critical habitat designation. We are excluding approximately 197 river miles (317 river kilometers) of critical habitat in Kansas that was included in the proposed critical habitat designation. This rule adds the species to the List of Endangered and Threatened Wildlife and extends the Act's protections to the peppered chub designated critical habitat.
Technical Conference on Financial Assurance Measures for Hydroelectric Projects; Supplemental Notice of Technical Conference
Document Number: 2022-03694
Type: Notice
Date: 2022-02-22
Agency: Department of Energy, Federal Energy Regulatory Commission
No: 2022-03694] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RM21-9-000] Technical Conference on Financial Assurance Measures for Hydroelectric Projects; Supplemental Notice of Technical Conference As announced
Southern California Edison Company; Notice of Intent To File License Application, Filing of Pre-Application Document (Pad), Commencement of Pre-Filing Process, and Scoping; Request for Comments on the Pad and Scoping Document, and Identification of Issues and Associated Study Requests
Document Number: 2022-03573
Type: Notice
Date: 2022-02-18
Agency: Department of Energy, Federal Energy Regulatory Commission
Pre-filing Process. b. Project No.: 1389-059. c. Dated Filed: December 16, 2021. d. Submitted By: Southern California Edison Company (SCE). e. Name of Project: Rush Creek Hydroelectric Project (Rush Creek Project). f. Location
PacifiCorp; Klamath River Renewal Corporation; Notice of Teleconference for Tribal Consultation Meeting
Document Number: 2022-03421
Type: Notice
Date: 2022-02-17
Agency: Department of Energy, Federal Energy Regulatory Commission
Name and Numbers: Lower Klamath and Klamath Hydroelectric Project Nos. 14803 and 2082. b. Project Licensee: PacifiCorp. c. Date and Time of Teleconference: Tuesday, March 1, 2022, from 12:00 p.m. to 1:00 p.m. Eastern Standard Time. d. FERC
Safety of Water Power Projects and Project Works
Document Number: 2022-03072
Type: Rule
Date: 2022-02-15
Agency: Department of Energy, Federal Energy Regulatory Commission
governing the safety of hydroelectric projects licensed by the Commission under the Federal Power Act. DATES: The rule is effective April 11, 2022. FOR FURTHER INFORMATION CONTACT: Tara DiJohn (Legal Information), Office of the General Counsel, Federal
Northbrook Carolina Hydro II, LLC; HydroLand Carolinas I, LLC; Notice of Effectiveness of Withdrawal of Applications To Transfer Licenses
Document Number: 2022-03218
Type: Notice
Date: 2022-02-15
Agency: Department of Energy, Federal Energy Regulatory Commission
To Transfer Licenses On May 13, 2021, Northbrook Carolina Hydro II, LLC (Northbrook) and HydroLand Carolinas I, LLC (Hydroland) jointly filed applications to transfer the licenses for the Bryson [[Page 8580]] Hydroelectric Project No. 2601
Alice Falls Hydro, LLC; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests
Document Number: 2022-03215
Type: Notice
Date: 2022-02-15
Agency: Department of Energy, Federal Energy Regulatory Commission
that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: New Major License. b. Project No.: 5867-054. c. Date filed: September 29, 2021. d. Applicant: Alice Falls
Green Mountain Power; Notice of Meeting
Document Number: 2022-02954
Type: Notice
Date: 2022-02-11
Agency: Department of Energy, Federal Energy Regulatory Commission
No: 2022-02954] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2879-012] Green Mountain Power; Notice of Meeting a. Project Name and Number: Bolton Falls Hydroelectric Project No. 2879-012. b. Applicant: Green
Green Mountain Power Corporation; Notice of Authorization for Continued Project Operation
Document Number: 2022-02704
Type: Notice
Date: 2022-02-09
Agency: Department of Energy, Federal Energy Regulatory Commission
Corporation, licensee for the Bolton Falls Hydroelectric Project No. 2879, filed an Application for a New Major License for Bolton Falls Hydroelectric Project pursuant to the Federal Power Act (FPA) and the Commission's regulations thereunder. The Bolton
Boyne USA, Inc.; Notice of Authorization for Continued Project Operation
Document Number: 2022-02703
Type: Notice
Date: 2022-02-09
Agency: Department of Energy, Federal Energy Regulatory Commission
Hydroelectric Project No. 3409, filed an Application for a Subsequent Minor License for Boyne River Hydroelectric Project pursuant to the Federal Power Act (FPA) and the Commission's regulations thereunder. The Boyne River Hydroelectric Project is located
Pike Island Hydropower Corporation; Notice of Intent To File License Application, Filing of Pre-Application Document, Approving Use of the Traditional Licensing Process
Document Number: 2022-02702
Type: Notice
Date: 2022-02-09
Agency: Department of Energy, Federal Energy Regulatory Commission
Hydropower Corporation. e. Name of Project: Pike Island Locks and Dam Hydroelectric Project. f. Location: At the U.S. Army Corps of Engineers' (Corps) Pike Island Locks and Dam on the Ohio River near the Village of Yorkville in Belmont
California Department of Water Resources and Los Angeles Department of Water and Power; Notice of Authorization for Continued Project Operation
Document Number: 2022-02699
Type: Notice
Date: 2022-02-09
Agency: Department of Energy, Federal Energy Regulatory Commission
On January 30, 2020, the California Department of Water Resources and Los Angeles Department of Water and Power, licensees for the South SWP Hydroelectric Project No. 2426, filed an Application for a New Major License for the South SWP Hydroelectric
List of Programs Eligible for Inclusion in Funding Agreements Negotiated With Self-Governance Tribes by Interior Bureaus Other Than the Bureau of Indian Affairs and Fiscal Year 2022 Programmatic Targets
Document Number: 2022-02584
Type: Notice
Date: 2022-02-08
Agency: Department of the Interior, Office of the Secretary
resources projects provide water for agricultural, municipal and industrial water supplies; hydroelectric power generation; flood control, enhancement of fish and wildlife habitats; and outdoor recreation. Components of the following water resource
Boott Hydropower, LLC; Notice Soliciting Scoping Comments
Document Number: 2022-02503
Type: Notice
Date: 2022-02-07
Agency: Department of Energy, Federal Energy Regulatory Commission
Doc No: 2022-02503] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2790-074] Boott Hydropower, LLC; Notice Soliciting Scoping Comments Take notice that the following hydroelectric application has been filed
Watson Associates; Notice Soliciting Scoping Comments
Document Number: 2022-02372
Type: Notice
Date: 2022-02-04
Agency: Department of Energy, Federal Energy Regulatory Commission
Doc No: 2022-02372] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 6240-064] Watson Associates; Notice Soliciting Scoping Comments Take notice that the following hydroelectric application has been filed
Domtar Paper Company, LLC; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
Document Number: 2022-02153
Type: Notice
Date: 2022-02-03
Agency: Department of Energy, Federal Energy Regulatory Commission
Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Non-Capacity Amendment of License. b. Project No.: 2212-055. c. Date Filed: November
Great River Hydro, LLC; Notice of Availability of Environmental Assessment
Document Number: 2022-02217
Type: Notice
Date: 2022-02-03
Agency: Department of Energy, Federal Energy Regulatory Commission
Hydroelectric Project No. 2077 and have prepared an Environmental Assessment (EA) for the proposed amendment. The licensee proposes to construct and operate an additional 4.7-megawatt unit (Moore Unit 5) at the project's Moore Development. The Fifteen Mile
KEI (Maine) Power Management (II) LLC; Notice Soliciting Scoping Comments
Document Number: 2022-02152
Type: Notice
Date: 2022-02-02
Agency: Department of Energy, Federal Energy Regulatory Commission
.gpo.gov] [FR Doc No: 2022-02152] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 4202-025] KEI (Maine) Power Management (II) LLC; Notice Soliciting Scoping Comments Take notice that the following hydroelectric application
Municipality of Anchorage Water & Wastewater Utility; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene
Document Number: 2022-02151
Type: Notice
Date: 2022-02-02
Agency: Department of Energy, Federal Energy Regulatory Commission
, or maintained for the generation of electric power and uses for such generation only the hydroelectric potential
Oglethorpe Power Corporation, Georgia Power Company, Rocky Mountain Leasing Corporation, and U.S. Bank National Association; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process
Document Number: 2022-01994
Type: Notice
Date: 2022-02-01
Agency: Department of Energy, Federal Energy Regulatory Commission
. b. Project No.: 2725-075. c. Dated Filed: December 10, 2021. d. Submitted By: Oglethorpe Power Corporation. e. Name of Project: Rocky Mountain Pumped Storage Hydroelectric Project. f. Location: On Heath Creek, Floyd County, Georgia
Technical Conference on Financial Assurance Measures for Hydroelectric Projects; Notice of Technical Conference
Document Number: 2022-01892
Type: Notice
Date: 2022-01-31
Agency: Department of Energy, Federal Energy Regulatory Commission
No: 2022-01892] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RM21-9-000] Technical Conference on Financial Assurance Measures for Hydroelectric Projects; Notice of Technical Conference Take notice that the Federal
Northwestern Corporation; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
Document Number: 2022-01683
Type: Notice
Date: 2022-01-28
Agency: Department of Energy, Federal Energy Regulatory Commission
notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Temporary Variance of Article 420. b. Project No: 2188-263. c. Date Filed: January 7, 2022
KEI (USA) Power Management (I), LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process
Document Number: 2022-01682
Type: Notice
Date: 2022-01-28
Agency: Department of Energy, Federal Energy Regulatory Commission
Management (I), LLC (KEI). e. Name of Project: Eustis Hydroelectric Project (project). f. Location: On the North Branch of the Dead River in Franklin County, Maine. No federal lands are occupied by the project works or located within the project
Alabama Power Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
Document Number: 2022-01756
Type: Notice
Date: 2022-01-28
Agency: Department of Energy, Federal Energy Regulatory Commission
that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Non-Project Use of Project Lands and Waters. b. Project No.: 349-166. c. Date Filed: December 8, 2021. d
PE Hydro Generation, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments
Document Number: 2022-01323
Type: Notice
Date: 2022-01-25
Agency: Department of Energy, Federal Energy Regulatory Commission
and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type
PE Hydro Generation, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments
Document Number: 2022-01321
Type: Notice
Date: 2022-01-25
Agency: Department of Energy, Federal Energy Regulatory Commission
and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments Take notice that the following hydroelectric application has been filed [[Page 3799]] with the Commission and is available for public inspection
PE Hydro Generation, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments
Document Number: 2022-01318
Type: Notice
Date: 2022-01-25
Agency: Department of Energy, Federal Energy Regulatory Commission
Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application
Taking and Importing Marine Mammals; Taking Marine Mammals Incidental to Russian River Estuary Management Activities
Document Number: 2022-00996
Type: Proposed Rule
Date: 2022-01-21
Agency: Department of Commerce, National Oceanic and Atmospheric Administration
and conduct activities in addition to the estuary management, including flood control, water diversion and storage, instream flow releases, hydroelectric power generation, channel maintenance, and fish hatchery production. The Corps, SCWA, and the District
Georgia Power Company; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments
Document Number: 2022-01174
Type: Notice
Date: 2022-01-21
Agency: Department of Energy, Federal Energy Regulatory Commission
and Deadline for Submission of Final Amendments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. [[Page 3294]] a. Type of Application: New Major License. b
Beaver City Corporation Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests
Document Number: 2022-01041
Type: Notice
Date: 2022-01-20
Agency: Department of Energy, Federal Energy Regulatory Commission
that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Subsequent Minor License. b. Project No.: P-1858-023. c. Date filed: July 30, 2021. d. Applicant: Beaver
Notice of Funding Opportunity for the Rural Energy Pilot Grants Program (REPP) for Fiscal Year 2022
Document Number: 2022-00943
Type: Notice
Date: 2022-01-19
Agency: Department of Agriculture, Rural Business-Cooperative Service
no larger than 2 megawatts in generation capacity, as defined in Section I. C. of this Notice. Eligible technologies are commercially available renewable energy systems e.g., wind, solar, geothermal, hydroelectric, biomass or bioenergy, and distributed
Erie Boulevard Hydropower, L.P.; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions
Document Number: 2022-00922
Type: Notice
Date: 2022-01-19
Agency: Department of Energy, Federal Energy Regulatory Commission
for Environmental Analysis, and Soliciting Comments, Recommendations, Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions Take notice that the following hydroelectric application has been filed with the Commission and is available
Power Authority of New York; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions
Document Number: 2022-00925
Type: Notice
Date: 2022-01-19
Agency: Department of Energy, Federal Energy Regulatory Commission
for Environmental Analysis, and Soliciting Comments, Recommendations, Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions Take notice that the following hydroelectric application has been filed with the Commission and is available
Jordan Hydroelectric Limited Partnership; Notice of Availability of Supplemental Environmental Assessment
Document Number: 2022-00815
Type: Notice
Date: 2022-01-18
Agency: Department of Energy, Federal Energy Regulatory Commission
Doc No: 2022-00815] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12740-008] Jordan Hydroelectric Limited Partnership; Notice of Availability of Supplemental Environmental Assessment In accordance
Aspinook Hydro, LLC; Notice of Intent To Prepare an Environmental Assessment
Document Number: 2022-00812
Type: Notice
Date: 2022-01-18
Agency: Department of Energy, Federal Energy Regulatory Commission
for a new major license for the 2.78-megawatt Wyre Wynd Hydroelectric Project (Wyre Wynd Project) (FERC No. 3472). The Wyre Wynd Project is located on the Quinebaug River in New London and Windham Counties, Connecticut. The project does not occupy federal
Pepperell Hydro Company, LLC; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
Document Number: 2022-00691
Type: Notice
Date: 2022-01-14
Agency: Department of Energy, Federal Energy Regulatory Commission
notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Non-capacity amendment of license. b. Project No.: 12721-022. c. Date Filed: November 9
Hydro Technology Systems, Inc.; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments
Document Number: 2022-00690
Type: Notice
Date: 2022-01-14
Agency: Department of Energy, Federal Energy Regulatory Commission
and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type
Alabama Power Company; Notice of Technical Teleconference
Document Number: 2022-00356
Type: Notice
Date: 2022-01-12
Agency: Department of Energy, Federal Energy Regulatory Commission
a technical teleconference to discuss details of the models used to evaluate alternative operating curves and downstream releases for relicensing Alabama Power Company's (Alabama Power) R.L. Harris Hydroelectric Project No. 2628 (Harris Project
Commission Information Collection Activities (FERC-500 and FERC-505); Comment Request; Extension
Document Number: 2022-00354
Type: Notice
Date: 2022-01-12
Agency: Department of Energy, Federal Energy Regulatory Commission
Application for Exemption of Small Conduit 4.90 and 4.92........................ No Yes Hydroelectric Facilities. Application for Case-Specific Exemption of 4.101 and 4.107...................... No Yes Small
Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments; Green Mountain Power Corporation
Document Number: 2022-00413
Type: Notice
Date: 2022-01-12
Agency: Department of Energy, Federal Energy Regulatory Commission
Schedule for Relicensing and a Deadline for Submission of Final Amendments; Green Mountain Power Corporation Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection
GR Catalyst Two, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process
Document Number: 2022-00410
Type: Notice
Date: 2022-01-12
Agency: Department of Energy, Federal Energy Regulatory Commission
Catalyst). e. Name of Project: Dahowa Hydroelectric Project. f. Location: Located on the Batten Kill, a tributary of the Hudson River in Washington County, New York. The project does not occupy any federal land. g. Filed Pursuant to: 18 CFR 5
Safety of Water Power Projects and Project Works
Document Number: 2021-27736
Type: Rule
Date: 2022-01-11
Agency: Department of Energy, Federal Energy Regulatory Commission
Power Projects and Project Works AGENCY: Federal Energy Regulatory Commission. ACTION: Final rule. SUMMARY: In this final rule, the Federal Energy Regulatory Commission (Commission) is amending its regulations governing the safety of hydroelectric
City of Idaho Falls; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
Document Number: 2022-00185
Type: Notice
Date: 2022-01-10
Agency: Department of Energy, Federal Energy Regulatory Commission
that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Application for Non-Project Use of Project Lands and Waters. b. Project No: 2842-044. c. Date Filed: September
Exelon Generation Company, LLC; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
Document Number: 2022-00187
Type: Notice
Date: 2022-01-10
Agency: Department of Energy, Federal Energy Regulatory Commission
that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Recreation Management Plan. b. Project No: 405-133. c. Date Filed: September 17, 2021. d. Applicant: Exelon
FirstLight CT Hydro LLC; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
Document Number: 2022-00186
Type: Notice
Date: 2022-01-10
Agency: Department of Energy, Federal Energy Regulatory Commission
that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Non-capacity amendment of license for project boundary. b. Project No: 2662-037. c. Date Filed: March 4, 2021
Allete, Inc.; Notice of Application Tendered for Filing With The Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments
Document Number: 2021-28297
Type: Notice
Date: 2021-12-29
Agency: Department of Energy, Federal Energy Regulatory Commission
and Deadline for Submission of Final Amendments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection.a. Type of Application: Subsequent License.b. Project No.: 2361-056.c
Allete, Inc.; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments
Document Number: 2021-28296
Type: Notice
Date: 2021-12-29
Agency: Department of Energy, Federal Energy Regulatory Commission
and Deadline for Submission of Final Amendments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: New Major License. b. Project No.: 2362
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.