Allete, Inc.; Notice of Application Tendered for Filing With The Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments, 74079 [2021-28297]
Download as PDF
Federal Register / Vol. 86, No. 247 / Wednesday, December 29, 2021 / Notices
provided so that the relevant agencies
are kept informed of the Project’s
progress.
Project Description
The Project would consist of Rover
constructing and operating a new
interconnect and meter station on its
existing Market Area Mainline at about
milepost 30.5 in Lenawee County,
Michigan. The proposed meter station
would include hot taps, valves, 65 feet
of interconnecting pipe, two meter
skids, a gas quality building, a
measurement building, and satellite
communications. Construction of the
proposed facilities would impact about
2.0 acres.
khammond on DSKJM1Z7X2PROD with NOTICES
Background
On October 26, 2021, the Commission
issued a Notice of Scoping Period
Requesting Comments on
Environmental Issues for the Proposed
Rover-Brightmark Receipt and Delivery
Meter Station Project and Notice of
Public Scoping Session (Notice of
Scoping). The Notice of Scoping was
sent to affected landowners; federal,
state, and local government agencies;
elected officials; environmental and
public interest groups; Native American
tribes; other interested parties; and local
libraries and newspapers. In response to
the Notice of Scoping, the Commission
received comments from the U.S.
Environmental Protection Agency. The
U.S. Environmental Protection Agency
commented on identifying the Project
purpose and need; and assessing
impacts on socioeconomics and
environmental justice communities,
greenhouse gas emissions, climate
change, vegetation and wildlife, surface
and groundwater quality, and karst
terrain. All substantive comments will
be addressed in the EA.
Additional Information
In order to receive notification of the
issuance of the EA and to keep track of
formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
service provides automatic notification
of filings made to subscribed dockets,
document summaries, and direct links
to the documents. Go to https://
www.ferc.gov/ferc-online/overview to
register for eSubscription.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC
website (www.ferc.gov). Using the
‘‘eLibrary’’ link, select ‘‘General Search’’
from the eLibrary menu, enter the
selected date range and ‘‘Docket
Number’’ excluding the last three digits
VerDate Sep<11>2014
20:20 Dec 28, 2021
Jkt 256001
(i.e., CP21–492), and follow the
instructions. For assistance with access
to eLibrary, the helpline can be reached
at (866) 208–3676, TTY (202) 502–8659,
or at FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC website also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
Dated: December 22, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–28294 Filed 12–28–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2361–056]
Allete, Inc.; Notice of Application
Tendered for Filing With The
Commission and Establishing
Procedural Schedule for Licensing and
Deadline for Submission of Final
Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.a. Type of
Application: Subsequent License.b.
Project No.: 2361–056.c. Date filed:
December 20, 2021.d. Applicant: Allete,
Inc. (Allete).e. Name of Project: Prairie
River Hydroelectric Project (Prairie
River Project).f. Location: On the Prairie
River, near the Township of Arbo in
Itasca County, Minnesota. The project
does not include any federal lands.g.
Filed Pursuant to: Federal Power Act 16
U.S.C. 791(a)–825(r).h. Applicant
Contact: Mr. David R. Moeller, Senior
Attorney & Director of Regulatory
Compliance, ALLETE, Inc., d.b.a.
Minnesota Power, 30 West Superior
Street, Duluth, MN 55802, 218–723–
3963, dmoeller@allete.com.i. FERC
Contact: Laura Washington (202) 502–
6072, Laura.Washington@ferc.gov.j.
This application is not ready for
environmental analysis at this time.k.
The Prairie River Project consists of the
following existing facilities: (1) A 1,305acre reservoir; (2) a concrete dam; (3) a
reinforced-concrete penstock extending
from the forebay via a surge tank to the
powerhouse; (4) 2,500-foot-long bypass
reach; (5) a powerhouse containing two
generating units with a total installed
capacity of 1.1 megawatts; and (6) a 2.3/
23-kilovolt transmission bank.
The Prairie River Project is currently
operated in a run-of-river mode and
generates an annual average of
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
74079
approximately 3,087,000 kilowatt hours.
Allete proposes to continue operating
the project as a run-of-river facility and
does not propose any new construction
to the project.l. A copy of the
application can be viewed on the
Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19) issued
on March 13, 2020. For assistance,
contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or (202) 502–
8659 (TTY).m. You may also register
online at https://www.ferc.gov/docsfiling/esubscription.asp to be notified
via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.n. Procedural schedule: The
application will be processed according
to the following preliminary schedule.
Revisions to the schedule will be made
as appropriate.
Milestone
Target
date
Issue Deficiency Letter (if necessary).
Request Additional Information ..
January
2022.
February
2022.
June 2022.
Notice of Acceptance/Notice of
Ready for Environmental Analysis.
Dated: December 22, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–28297 Filed 12–28–21; 8:45 am]
BILLING CODE 6717–01–P795
E:\FR\FM\29DEN1.SGM
29DEN1
Agencies
[Federal Register Volume 86, Number 247 (Wednesday, December 29, 2021)]
[Notices]
[Page 74079]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-28297]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2361-056]
Allete, Inc.; Notice of Application Tendered for Filing With The
Commission and Establishing Procedural Schedule for Licensing and
Deadline for Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.a.
Type of Application: Subsequent License.b. Project No.: 2361-056.c.
Date filed: December 20, 2021.d. Applicant: Allete, Inc. (Allete).e.
Name of Project: Prairie River Hydroelectric Project (Prairie River
Project).f. Location: On the Prairie River, near the Township of Arbo
in Itasca County, Minnesota. The project does not include any federal
lands.g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-
825(r).h. Applicant Contact: Mr. David R. Moeller, Senior Attorney &
Director of Regulatory Compliance, ALLETE, Inc., d.b.a. Minnesota
Power, 30 West Superior Street, Duluth, MN 55802, 218-723-3963,
[email protected].i. FERC Contact: Laura Washington (202) 502-6072,
[email protected].j. This application is not ready for
environmental analysis at this time.k. The Prairie River Project
consists of the following existing facilities: (1) A 1,305-acre
reservoir; (2) a concrete dam; (3) a reinforced-concrete penstock
extending from the forebay via a surge tank to the powerhouse; (4)
2,500-foot-long bypass reach; (5) a powerhouse containing two
generating units with a total installed capacity of 1.1 megawatts; and
(6) a 2.3/23-kilovolt transmission bank.
The Prairie River Project is currently operated in a run-of-river
mode and generates an annual average of approximately 3,087,000
kilowatt hours. Allete proposes to continue operating the project as a
run-of-river facility and does not propose any new construction to the
project.l. A copy of the application can be viewed on the Commission's
website at https://www.ferc.gov using the ``eLibrary'' link. Enter the
docket number excluding the last three digits in the docket number
field to access the document. At this time, the Commission has
suspended access to the Commission's Public Reference Room due to the
proclamation declaring a National Emergency concerning the Novel
Coronavirus Disease (COVID-19) issued on March 13, 2020. For
assistance, contact FERC at [email protected] or call toll-
free, (866) 208-3676 or (202) 502-8659 (TTY).m. You may also register
online at https://www.ferc.gov/docs-filing/esubscription.asp to be
notified via email of new filings and issuances related to this or
other pending projects. For assistance, contact FERC Online Support.n.
Procedural schedule: The application will be processed according to the
following preliminary schedule. Revisions to the schedule will be made
as appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Issue Deficiency Letter (if necessary).... January 2022.
Request Additional Information............ February 2022.
Notice of Acceptance/Notice of Ready for June 2022.
Environmental Analysis.
------------------------------------------------------------------------
o. Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: December 22, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-28297 Filed 12-28-21; 8:45 am]