GR Catalyst Two, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process, 1750 [2022-00410]
Download as PDF
1750
Federal Register / Vol. 87, No. 8 / Wednesday, January 12, 2022 / Notices
lotter on DSK11XQN23PROD with NOTICES1
Environmental Mailing List
The environmental mailing list
includes federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American Tribes; other
interested parties; and local libraries
and newspapers. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project and includes a
mailing address with their comments.
Commission staff will update the
environmental mailing list as the
analysis proceeds to ensure that
Commission notices related to this
environmental review are sent to all
individuals, organizations, and
government entities interested in and/or
potentially affected by the proposed
project.
If you need to make changes to your
name/address, or if you would like to
remove your name from the mailing list,
please complete one of the following
steps:
(1) Send an email to
GasProjectAddressChange@ferc.gov
stating your request. You must include
the docket number CP22–24–000 in
your request. If you are requesting a
change to your address, please be sure
to include your name and the correct
address. If you are requesting to delete
your address from the mailing list,
please include your name and address
as it appeared on this notice. This email
address is unable to accept comments.
Or
(2) Return the attached ‘‘Mailing List
Update Form’’ (appendix 2).
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC
website at www.ferc.gov using the
eLibrary link. Click on the eLibrary link,
click on ‘‘General Search’’ and enter the
docket number in the ‘‘Docket Number’’
field. Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or (866)
208–3676, or for TTY, contact (202)
502–8659. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
Public sessions or site visits will be
posted on the Commission’s calendar
VerDate Sep<11>2014
17:04 Jan 11, 2022
Jkt 256001
regulations at 50 CFR 600.920. We are
also initiating consultation with the
New York State Historic Preservation
Officer, as required by section 106,
Dated: January 5, 2022.
National Historic Preservation Act, and
Kimberly D. Bose,
the implementing regulations of the
Secretary.
Advisory Council on Historic
[FR Doc. 2022–00359 Filed 1–11–22; 8:45 am]
Preservation at 36 CFR 800.2.
BILLING CODE 6717–01–P
l. With this notice, we are designating
GR Catalyst as the Commission’s nonfederal representative for carrying out
DEPARTMENT OF ENERGY
informal consultation pursuant to
section 7 of the Endangered Species Act
Federal Energy Regulatory
and section 305(b) of the MagnusonCommission
Stevens Fishery Conservation and
[Project No. 4644–016]
Management Act; and consultation
pursuant to section 106 of the National
GR Catalyst Two, LLC; Notice of Intent Historic Preservation Act.
To File License Application, Filing of
m. GR Catalyst filed a Pre-Application
Pre-Application Document, and
Document (PAD; including a proposed
Approving Use of the Traditional
process plan and schedule) with the
Licensing Process
Commission, pursuant to 18 CFR 5.6 of
the Commission’s regulations.
a. Type of Application: Notice of
n. A copy of the PAD may be viewed
Intent to File License Application and
Request to Use the Traditional Licensing on the Commission’s website (https://
www.ferc.gov), using the ‘‘eLibrary’’
Process.
link. Enter the docket number,
b. Project No.: 4644–016.
excluding the last three digits in the
c. Date filed: November 30, 2021.
docket number field, to access the
d. Submitted by: GR Catalyst Two,
document. For assistance, contact FERC
LLC (GR Catalyst).
Online Support at
e. Name of Project: Dahowa
FERCOnlineSupport@ferc.gov, (866)
Hydroelectric Project.
f. Location: Located on the Batten Kill, 208–3676 (toll free), or (202) 502–8659
(TTY).
a tributary of the Hudson River in
o. The applicant states its unequivocal
Washington County, New York. The
intent to submit an application for a
project does not occupy any federal
new license for Project No. 4644.
land.
g. Filed Pursuant to: 18 CFR 5.3 of the Pursuant to 18 CFR 16.8, 16.9, and 16.10
each application for a new license and
Commission’s regulations.
any competing license applications
h. Potential Applicant Contact: Ms.
must be filed with the Commission at
Celeste Fay, Director of Regulatory
least 24 months prior to the expiration
Affairs, GR Catalyst Two, LLC, c/o
Gravity Renewables, Inc, P.O. Box 7580, of the existing license. All applications
for license for this project must be filed
Boulder, CO 80306, Phone: (303) 440–
by November 30, 2024.
3378, Email: Celeste@
p. Register online at https://
gravityrenewables.com.
www.ferc.gov/docs-filing/esubscription.
i. FERC Contact: Claire Rozdilski,
asp to be notified via email of new filing
Phone: (202) 502–8259, Email:
and issuances related to this or other
claire.rozdilski@ferc.gov.
pending projects. For assistance, contact
j. GR Catalyst filed its request to use
FERC Online Support.
the Traditional Licensing Process on
November 30, 2021 and provided public
Dated: January 6, 2022.
notice of its request on the same date.
Kimberly D. Bose,
In a letter dated January 6, 2022, the
Secretary.
Director of the Division of Hydropower
[FR Doc. 2022–00410 Filed 1–11–22; 8:45 am]
Licensing approved GR Catalyst’s
BILLING CODE 6717–01–P
request to use the Traditional Licensing
Process.
k. With this notice, we are initiating
informal consultation with the U.S. Fish FEDERAL RESERVE SYSTEM
and Wildlife Service and/or NOAA
Change in Bank Control Notices;
Fisheries under section 7 of the
Acquisitions of Shares of a Bank or
Endangered Species Act and the joint
Bank Holding Company
agency regulations thereunder at 50
CFR, part 402; and NOAA Fisheries
The notificants listed below have
under section 305(b) of the Magnusonapplied under the Change in Bank
Stevens Fishery Conservation and
Control Act (Act) (12 U.S.C. 1817(j)) and
Management Act and implementing
§ 225.41 of the Board’s Regulation Y (12
located at https://www.ferc.gov/newsevents/events along with other related
information.
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
E:\FR\FM\12JAN1.SGM
12JAN1
Agencies
[Federal Register Volume 87, Number 8 (Wednesday, January 12, 2022)]
[Notices]
[Page 1750]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-00410]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 4644-016]
GR Catalyst Two, LLC; Notice of Intent To File License
Application, Filing of Pre-Application Document, and Approving Use of
the Traditional Licensing Process
a. Type of Application: Notice of Intent to File License
Application and Request to Use the Traditional Licensing Process.
b. Project No.: 4644-016.
c. Date filed: November 30, 2021.
d. Submitted by: GR Catalyst Two, LLC (GR Catalyst).
e. Name of Project: Dahowa Hydroelectric Project.
f. Location: Located on the Batten Kill, a tributary of the Hudson
River in Washington County, New York. The project does not occupy any
federal land.
g. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations.
h. Potential Applicant Contact: Ms. Celeste Fay, Director of
Regulatory Affairs, GR Catalyst Two, LLC, c/o Gravity Renewables, Inc,
P.O. Box 7580, Boulder, CO 80306, Phone: (303) 440-3378, Email:
[email protected].
i. FERC Contact: Claire Rozdilski, Phone: (202) 502-8259, Email:
[email protected].
j. GR Catalyst filed its request to use the Traditional Licensing
Process on November 30, 2021 and provided public notice of its request
on the same date. In a letter dated January 6, 2022, the Director of
the Division of Hydropower Licensing approved GR Catalyst's request to
use the Traditional Licensing Process.
k. With this notice, we are initiating informal consultation with
the U.S. Fish and Wildlife Service and/or NOAA Fisheries under section
7 of the Endangered Species Act and the joint agency regulations
thereunder at 50 CFR, part 402; and NOAA Fisheries under section 305(b)
of the Magnuson-Stevens Fishery Conservation and Management Act and
implementing regulations at 50 CFR 600.920. We are also initiating
consultation with the New York State Historic Preservation Officer, as
required by section 106, National Historic Preservation Act, and the
implementing regulations of the Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating GR Catalyst as the
Commission's non-federal representative for carrying out informal
consultation pursuant to section 7 of the Endangered Species Act and
section 305(b) of the Magnuson-Stevens Fishery Conservation and
Management Act; and consultation pursuant to section 106 of the
National Historic Preservation Act.
m. GR Catalyst filed a Pre-Application Document (PAD; including a
proposed process plan and schedule) with the Commission, pursuant to 18
CFR 5.6 of the Commission's regulations.
n. A copy of the PAD may be viewed on the Commission's website
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket
number, excluding the last three digits in the docket number field, to
access the document. For assistance, contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY).
o. The applicant states its unequivocal intent to submit an
application for a new license for Project No. 4644. Pursuant to 18 CFR
16.8, 16.9, and 16.10 each application for a new license and any
competing license applications must be filed with the Commission at
least 24 months prior to the expiration of the existing license. All
applications for license for this project must be filed by November 30,
2024.
p. Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
Dated: January 6, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-00410 Filed 1-11-22; 8:45 am]
BILLING CODE 6717-01-P