Green Mountain Power; Notice of Meeting, 8008 [2022-02954]
Download as PDF
8008
Federal Register / Vol. 87, No. 29 / Friday, February 11, 2022 / Notices
become a party to this proceeding
should file a motion to intervene at the
above address in accordance with FERC
Rule 214 (18 CFR 385.214).
Comments and other filings
concerning TPS’s application to export
electric energy to Canada should be
clearly marked with OE Docket No. EA–
431–A. Additional copies are to be
provided directly to Norma Rosner
Iacovo, 300 East John Carpenter
Freeway, Suite 100, Irving, TX 75062,
niacovo@tnsk.com; and Neil L. Levy,
500 North Capitol Street NW,
Washington, DC 20001, nlevy@
mwe.com.
A final decision will be made on the
requested authorization after the
environmental impacts have been
evaluated pursuant to DOE’s National
Environmental Policy Act Implementing
Procedures (10 CFR part 1021) and after
DOE evaluates whether the proposed
action will have an adverse impact on
the sufficiency of supply or reliability of
the U.S. electric power supply system.
Copies of the Application will be
made available, upon request, by
accessing the program website at
https://energy.gov/node/11845, or by
emailing Matt Aronoff at
matthew.aronoff@hq.doe.gov.
Signed in Washington, DC, on February 8,
2022.
Christopher Lawrence,
Management and Program Analyst, Electricity
Delivery Division, Office of Electricity.
[FR Doc. 2022–02970 Filed 2–10–22; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2879–012]
lotter on DSK11XQN23PROD with NOTICES1
Green Mountain Power; Notice of
Meeting
a. Project Name and Number: Bolton
Falls Hydroelectric Project No. 2879–
012.
b. Applicant: Green Mountain Power
(GMP).
c. Date and Time of Meeting: February
23, 2022 at 10:00 a.m. EST.
d. FERC Contact: Michael Tust, (202)
502–6522, michael.tust@ferc.gov.
e. Purpose of Meeting: Commission
staff will hold a teleconference with
staff from GMP and the Vermont State
Historic Preservation Office to discuss
the status of pending revisions to GMP’s
Historic Properties Management Plan
and a projected schedule for finalizing
and signing a Programmatic Agreement.
f. All local, state, and federal agencies,
Indian tribes, and other interested
VerDate Sep<11>2014
17:29 Feb 10, 2022
Jkt 256001
parties are invited to attend the meeting.
Please call or email Michael Tust at
(202) 502–6522 or michael.tust@ferc.gov
by February 18, 2022 at 4:30 p.m. EST,
to RSVP and to receive specific
instructions on how to participate.
[FR Doc. 2022–02954 Filed 2–10–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP22–539–000.
Applicants: Texas Eastern
Transmission, LP.
Description: Compliance filing:
TETLP Ministerial Compliance Filing
RP21–1001–000 to be effective 9/1/
2021.
Filed Date: 2/4/22.
Accession Number: 20220204–5199.
Comment Date: 5 p.m. ET 2/16/22.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: February 7, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022–02958 Filed 2–10–22; 8:45 am]
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
Federal Energy Regulatory
Commission
[Docket No. CP22–43–000]
Texas Eastern Transmission, LP;
Notice of Request Under Blanket
Authorization and Establishing
Intervention and Protest Deadline
Dated: February 7, 2022.
Kimberly D. Bose,
Secretary.
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Take notice that on January 27, 2022,
Texas Eastern Transmission, LP (Texas
Eastern), 5400 Westheimer Court,
Houston, Texas 77056, filed in the
above referenced docket a prior notice
pursuant to Section 157.205 and
157.208 of the Federal Energy
Regulatory Commission’s regulations
under the Natural Gas Act and the
blanket certificate issued by the
Commission in Docket No. CP82–535–
000, 1 seeking authorization to construct
and operate interconnection facilities
between Texas Eastern and Venture
Global Gator Express, LLC (Gator
Express) in Plaquemines Parish,
Louisiana. Specifically, Texas Eastern
proposes to construct a new metering
and regulating facilities (M&R Facilities)
which will be installed on a platform
owned by Gator Express with
approximately 0.2 mile of 30-inchdiameter interconnecting piping and a
riser to connect Texas Eastern’s Line to
M&R Facilities on the Gator Express
platform. The proposed construction
will have a delivery capacity of 240,000
dekatherms per day and is estimated to
cost approximately $30,600,000, all as
more fully set forth in the request which
is on file with the Commission and open
to public inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
1 Texas Eastern Transmission Corp., 21 FERC
¶ 62,199 (1982).
E:\FR\FM\11FEN1.SGM
11FEN1
Agencies
[Federal Register Volume 87, Number 29 (Friday, February 11, 2022)]
[Notices]
[Page 8008]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-02954]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2879-012]
Green Mountain Power; Notice of Meeting
a. Project Name and Number: Bolton Falls Hydroelectric Project No.
2879-012.
b. Applicant: Green Mountain Power (GMP).
c. Date and Time of Meeting: February 23, 2022 at 10:00 a.m. EST.
d. FERC Contact: Michael Tust, (202) 502-6522,
[email protected].
e. Purpose of Meeting: Commission staff will hold a teleconference
with staff from GMP and the Vermont State Historic Preservation Office
to discuss the status of pending revisions to GMP's Historic Properties
Management Plan and a projected schedule for finalizing and signing a
Programmatic Agreement.
f. All local, state, and federal agencies, Indian tribes, and other
interested parties are invited to attend the meeting. Please call or
email Michael Tust at (202) 502-6522 or [email protected] by
February 18, 2022 at 4:30 p.m. EST, to RSVP and to receive specific
instructions on how to participate.
Dated: February 7, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-02954 Filed 2-10-22; 8:45 am]
BILLING CODE 6717-01-P