Allete, Inc.; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments, 74076-74077 [2021-28296]

Download as PDF 74076 Federal Register / Vol. 86, No. 247 / Wednesday, December 29, 2021 / Notices request. All comments will become a matter of public record. Anthony May, Paperwork Reduction Act Officer, Bureau of Consumer Financial Protection. [FR Doc. 2021–28319 Filed 12–28–21; 8:45 am] BILLING CODE 4810–AM–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: khammond on DSKJM1Z7X2PROD with NOTICES Filings Instituting Proceedings Docket Numbers: PR22–14–000. Applicants: DTE Gas Company. Description: Submits tariff filing per 284.123(b),(e)/: Revisions to Operating Conditions for Interstate Transportation Service to be effective 1/1/2022. Filed Date: 12/21/2021. Accession Number: 20211221–5093. Comments/Protests Due: 5 p.m. ET 1/ 11/22. Docket Numbers: RP22–432–000. Applicants: Great Basin Gas Transmission Company. Description: § 4(d) Rate Filing: Gas Quality Specifications to be effective 2/ 1/2022. Filed Date: 12/21/21. Accession Number: 20211221–5094. Comment Date: 5 p.m. ET 1/3/22. Docket Numbers: RP22–433–000. Applicants: Range Resources— Appalachia, LLC, and Columbia Gulf Transmission, LLC v. Texas Eastern Transmission, LP. Description: Joint Complaint of Range Resources—Appalachia, LLC, and Columbia Gulf Transmission, LLC. Filed Date: 12/21/21. Accession Number: 20211221–5128. Comment Date: 5 p.m. ET 1/3/22. Docket Numbers: RP22–434–000. Applicants: Transcontinental Gas Pipe Line Company, LLC. Description: § 4(d) Rate Filing: Negotiated Rates—Leidy South—Interim Svc Termin—Seneca Resources to be effective 12/19/2021. Filed Date: 12/21/21. Accession Number: 20211221–5136. Comment Date: 5 p.m. ET 1/3/22. Docket Numbers: RP22–435–000. Applicants: Range Resources— Appalachia, LLC v. Texas Eastern Transmission, LP. Description: Complaint of Range Resources—Appalachia, LLC v. Texas Eastern Transmission, LP requesting VerDate Sep<11>2014 20:20 Dec 28, 2021 Jkt 256001 action to require Texas Eastern to modify or upgrade its system operations et. al. Filed Date: 12/21/21. Accession Number: 20211221–5269. Comment Date: 5 p.m. ET 1/3/22. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: December 22, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–28291 Filed 12–28–21; 8:45 am] BILLING CODE 6717–01–P793 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2362–044] Allete, Inc.; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: New Major License. b. Project No.: 2362–044. c. Date filed: December 20, 2021. d. Applicant: Allete, Inc. (Allete). e. Name of Project: Grand Rapids Hydroelectric Project (Grand Rapids Project). f. Location: On the Mississippi River near the City of Grand Rapids in Itasca County, Minnesota. The project does not include any federal lands. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Mr. David R. Moeller, Senior Attorney & Director of PO 00000 Frm 00014 Fmt 4703 Sfmt 4703 Regulatory Compliance, ALLETE, Inc., d.b.a. Minnesota Power, 30 West Superior Street, Duluth, MN 55802, 218–723–3963, dmoeller@allete.com. i. FERC Contact: Laura Washington (202) 502–6072, Laura.Washington@ferc.gov. j. This application is not ready for environmental analysis at this time. k. The Grand Rapids Project consists of the following existing facilities: (1) 465-acre reservoir; (2) a concrete dam; (3) and a 425-foot-long, 2.4-kilovolt transmission line extending from the powerhouse to the non-project Blandin Paper Mill; and (4) a powerhouse containing two generating units with a total installed capacity of 2.1 megawatts. The Grand Rapids Project is currently operated in a run-of-river mode and generates an annual average of approximately 6,424,000 kilowatt hours. Allete proposes to continue operating the project as a run-of-river facility and does not propose any new construction to the project. l. A copy of the application can be viewed on the Commission’s website at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19) issued on March 13, 2020. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208–3676 or (202) 502– 8659 (TTY). m. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Procedural schedule: The application will be processed according to the following preliminary schedule. Revisions to the schedule will be made as appropriate. Milestone Issue Deficiency Letter (if necessary). Request Additional Information. Notice of Acceptance/ Notice of Ready for Environmental Analysis. E:\FR\FM\29DEN1.SGM 29DEN1 Target date January 2022. February 2022. June 2022. Federal Register / Vol. 86, No. 247 / Wednesday, December 29, 2021 / Notices o. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis. Dated: December 22, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–28296 Filed 12–28–21; 8:45 am] BILLING CODE 6717–01–P1065 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission khammond on DSKJM1Z7X2PROD with NOTICES Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC21–125–000; EC21–128–000. Applicants: PSEG Fossil LLC, PSEG Fossil Sewaren Urban Renewal LLC, PSEG Keys Energy Center LLC, PSEG Energy Resources & Trade LLC, Parkway Generation, LLC, Parkway Generation Essex, LLC, PSEG New Haven LLC, PSEG Power Connecticut LLC, PSEG Power New York LLC, Generation Bridge II, LLC. Description: Response to December 6, 2021 Deficiency Letter of PSEG New Haven LLC, et al. Filed Date: 12/17/21. Accession Number: 20211217–5420. Comment Date: 5 p.m. ET 1/7/22. Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG22–32–000. Applicants: Flower Valley II LLC. Description: Self-Certification of Exempt Wholesale Generator Status of Flower Valley II LLC. Filed Date: 12/21/21. Accession Number: 20211221–5203. Comment Date: 5 p.m. ET 1/11/22. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–3079–019. Applicants: Tyr Energy LLC. Description: Updated Market Power Analysis for Southwest Power Pool Inc. Region of Tyr Energy LLC. Filed Date: 12/22/21. Accession Number: 20211222–5161. Comment Date: 5 p.m. ET 2/21/22. Docket Numbers: ER15–1873–013. Applicants: Buckeye Wind Energy LLC. Description: Triennial Market Power Analysis for Southwest Power Pool Inc. Region of Buckeye Wind Energy LLC. Filed Date: 12/21/21. VerDate Sep<11>2014 20:20 Dec 28, 2021 Jkt 256001 Accession Number: 20211221–5218. Comment Date: 5 p.m. ET 2/21/22. Docket Numbers: ER16–1720–019. Applicants: Invenergy Energy Management LLC. Description: Triennial Market Power Analysis for Southwest Power Pool Inc. Region of Invenergy Energy Management LLC. Filed Date: 12/21/21. Accession Number: 20211221–5216. Comment Date: 5 p.m. ET 2/21/22. Docket Numbers: ER18–1639–014. Applicants: Constellation Mystic Power, LLC. Description: Compliance filing: Sixth Compliance Filing to be effective 6/1/ 2022. Filed Date: 12/20/21. Accession Number: 20211220–5218. Comment Date: 5 p.m. ET 1/10/22. Docket Numbers: ER18–471–007; ER18–472–007. Applicants: States Edge Wind I Holdings LLC, States Edge Wind I LLC. Description: Triennial Market Power Analysis for Southwest Power Pool Inc. Region of States Edge Wind I LLC. Filed Date: 12/21/21. Accession Number: 20211221–5219. Comment Date: 5 p.m. ET 2/21/22. Docket Numbers: ER18–784–005. Applicants: Upstream Wind Energy LLC. Description: Triennial Market Power Analysis for Southwest Power Pool Inc. Region of Upstream Wind Energy LLC. Filed Date: 12/22/21. Accession Number: 20211222–5159. Comment Date: 5 p.m. ET 2/21/22. Docket Numbers: ER20–387–003. Applicants: Traverse Wind Energy LLC. Description: Triennial Market Power Analysis for Southwest Power Pool Inc. Region of Traverse Wind Energy LLC. Filed Date: 12/21/21. Accession Number: 20211221–5267. Comment Date: 5 p.m. ET 2/21/22. Docket Numbers: ER20–388–003. Applicants: Traverse Wind Energy Holdings LLC. Description: Triennial Market Power Analysis for Southwest Power Pool Inc. Region of Traverse Wind Energy Holdings LLC. Filed Date: 12/21/21. Accession Number: 20211221–5268. Comment Date: 5 p.m. ET 2/21/22. Docket Numbers: ER20–956–002. Applicants: Thunderhead Wind Energy LLC. Description: Triennial Market Power Analysis for Southwest Power Pool Inc. Region of Thunderhead Wind Energy LLC. Filed Date: 12/21/21. PO 00000 Frm 00015 Fmt 4703 Sfmt 4703 74077 Accession Number: 20211221–5266. Comment Date: 5 p.m. ET 2/21/22. Docket Numbers: ER21–2137–002. Applicants: IR Energy Management LLC. Description: Triennial Market Power Analysis for Southwest Power Pool Inc. Region of IR Energy Management LLC. Filed Date: 12/21/21. Accession Number: 20211221–5217. Comment Date: 5 p.m. ET 2/21/22. Docket Numbers: ER21–2600–002. Applicants: Southwest Power Pool, Inc. Description: Compliance filing: Compliance Filing in Response to Order issued in ER21–2600 (L and O) to be effective 12/1/2021. Filed Date: 12/22/21. Accession Number: 20211222–5043. Comment Date: 5 p.m. ET 1/12/22. Docket Numbers: ER22–69–000. Applicants: Indeck Niles, LLC. Description: Supplement to October 7, 2021 Indeck Niles, LLC tariff filing. Filed Date: 11/15/21. Accession Number: 20211115–5226. Comment Date: 5 p.m. ET 1/3/22. Docket Numbers: ER22–703–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Revisions to PJM’s FTR Credit Requirement and Request for 28-Day Comment Period to be effective 2/27/ 2022. Filed Date: 12/21/21. Accession Number: 20211221–5202. Comment Date: 5 p.m. ET 1/11/22. Docket Numbers: ER22–705–000. Applicants: New York Independent System Operator, Inc. Description: § 205(d) Rate Filing: 205: Market Power Mitigation Measures that apply to uneconomic production to be effective 2/21/2022. Filed Date: 12/22/21. Accession Number: 20211222–5059. Comment Date: 5 p.m. ET 1/12/22. Docket Numbers: ER22–706–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: Revisions to the Formula Rate for Southwestern Public Service Co. (‘‘SPS’’) to be effective 10/1/2021. Filed Date: 12/22/21. Accession Number: 20211222–5100. Comment Date: 5 p.m. ET 1/12/22. Docket Numbers: ER22–707–000. Applicants: ISO New England Inc., New England Power Company. Description: § 205(d) Rate Filing: ISO New England Inc. submits tariff filing per 35.13(a)(2)(iii: New England Power; Second Revised Service Agreement No. TSA–NEP–86 to be effective 1/1/2022. E:\FR\FM\29DEN1.SGM 29DEN1

Agencies

[Federal Register Volume 86, Number 247 (Wednesday, December 29, 2021)]
[Notices]
[Pages 74076-74077]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-28296]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2362-044]


Allete, Inc.; Notice of Application Tendered for Filing With the 
Commission and Establishing Procedural Schedule for Licensing and 
Deadline for Submission of Final Amendments

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: New Major License.
    b. Project No.: 2362-044.
    c. Date filed: December 20, 2021.
    d. Applicant: Allete, Inc. (Allete).
    e. Name of Project: Grand Rapids Hydroelectric Project (Grand 
Rapids Project).
    f. Location: On the Mississippi River near the City of Grand Rapids 
in Itasca County, Minnesota. The project does not include any federal 
lands.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Mr. David R. Moeller, Senior Attorney & 
Director of Regulatory Compliance, ALLETE, Inc., d.b.a. Minnesota 
Power, 30 West Superior Street, Duluth, MN 55802, 218-723-3963, 
[email protected].
    i. FERC Contact: Laura Washington (202) 502-6072, 
[email protected].
    j. This application is not ready for environmental analysis at this 
time.
    k. The Grand Rapids Project consists of the following existing 
facilities: (1) 465-acre reservoir; (2) a concrete dam; (3) and a 425-
foot-long, 2.4-kilovolt transmission line extending from the powerhouse 
to the non-project Blandin Paper Mill; and (4) a powerhouse containing 
two generating units with a total installed capacity of 2.1 megawatts.
    The Grand Rapids Project is currently operated in a run-of-river 
mode and generates an annual average of approximately 6,424,000 
kilowatt hours. Allete proposes to continue operating the project as a 
run-of-river facility and does not propose any new construction to the 
project.
    l. A copy of the application can be viewed on the Commission's 
website at https://www.ferc.gov using the ``eLibrary'' link. Enter the 
docket number excluding the last three digits in the docket number 
field to access the document. At this time, the Commission has 
suspended access to the Commission's Public Reference Room due to the 
proclamation declaring a National Emergency concerning the Novel 
Coronavirus Disease (COVID-19) issued on March 13, 2020. For 
assistance, contact FERC at [email protected] or call toll-
free, (866) 208-3676 or (202) 502-8659 (TTY).
    m. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    n. Procedural schedule: The application will be processed according 
to the following preliminary schedule. Revisions to the schedule will 
be made as appropriate.

 
------------------------------------------------------------------------
               Milestone                          Target date
------------------------------------------------------------------------
Issue Deficiency Letter (if            January 2022.
 necessary).
Request Additional Information.......  February 2022.
Notice of Acceptance/Notice of Ready   June 2022.
 for Environmental Analysis.
------------------------------------------------------------------------


[[Page 74077]]

    o. Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of the notice 
of ready for environmental analysis.

    Dated: December 22, 2021.
Kimberly D. Bose,
Secretary.
 [FR Doc. 2021-28296 Filed 12-28-21; 8:45 am]
 BILLING CODE 6717-01-P1065


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.