Allete, Inc.; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments, 74076-74077 [2021-28296]
Download as PDF
74076
Federal Register / Vol. 86, No. 247 / Wednesday, December 29, 2021 / Notices
request. All comments will become a
matter of public record.
Anthony May,
Paperwork Reduction Act Officer, Bureau of
Consumer Financial Protection.
[FR Doc. 2021–28319 Filed 12–28–21; 8:45 am]
BILLING CODE 4810–AM–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
khammond on DSKJM1Z7X2PROD with NOTICES
Filings Instituting Proceedings
Docket Numbers: PR22–14–000.
Applicants: DTE Gas Company.
Description: Submits tariff filing per
284.123(b),(e)/: Revisions to Operating
Conditions for Interstate Transportation
Service to be effective 1/1/2022.
Filed Date: 12/21/2021.
Accession Number: 20211221–5093.
Comments/Protests Due: 5 p.m. ET 1/
11/22.
Docket Numbers: RP22–432–000.
Applicants: Great Basin Gas
Transmission Company.
Description: § 4(d) Rate Filing: Gas
Quality Specifications to be effective 2/
1/2022.
Filed Date: 12/21/21.
Accession Number: 20211221–5094.
Comment Date: 5 p.m. ET 1/3/22.
Docket Numbers: RP22–433–000.
Applicants: Range Resources—
Appalachia, LLC, and Columbia Gulf
Transmission, LLC v. Texas Eastern
Transmission, LP.
Description: Joint Complaint of Range
Resources—Appalachia, LLC, and
Columbia Gulf Transmission, LLC.
Filed Date: 12/21/21.
Accession Number: 20211221–5128.
Comment Date: 5 p.m. ET 1/3/22.
Docket Numbers: RP22–434–000.
Applicants: Transcontinental Gas
Pipe Line Company, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rates—Leidy South—Interim
Svc Termin—Seneca Resources to be
effective 12/19/2021.
Filed Date: 12/21/21.
Accession Number: 20211221–5136.
Comment Date: 5 p.m. ET 1/3/22.
Docket Numbers: RP22–435–000.
Applicants: Range Resources—
Appalachia, LLC v. Texas Eastern
Transmission, LP.
Description: Complaint of Range
Resources—Appalachia, LLC v. Texas
Eastern Transmission, LP requesting
VerDate Sep<11>2014
20:20 Dec 28, 2021
Jkt 256001
action to require Texas Eastern to
modify or upgrade its system operations
et. al.
Filed Date: 12/21/21.
Accession Number: 20211221–5269.
Comment Date: 5 p.m. ET 1/3/22.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: December 22, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–28291 Filed 12–28–21; 8:45 am]
BILLING CODE 6717–01–P793
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2362–044]
Allete, Inc.; Notice of Application
Tendered for Filing With the
Commission and Establishing
Procedural Schedule for Licensing and
Deadline for Submission of Final
Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 2362–044.
c. Date filed: December 20, 2021.
d. Applicant: Allete, Inc. (Allete).
e. Name of Project: Grand Rapids
Hydroelectric Project (Grand Rapids
Project).
f. Location: On the Mississippi River
near the City of Grand Rapids in Itasca
County, Minnesota. The project does not
include any federal lands.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. David R.
Moeller, Senior Attorney & Director of
PO 00000
Frm 00014
Fmt 4703
Sfmt 4703
Regulatory Compliance, ALLETE, Inc.,
d.b.a. Minnesota Power, 30 West
Superior Street, Duluth, MN 55802,
218–723–3963, dmoeller@allete.com.
i. FERC Contact: Laura Washington
(202) 502–6072,
Laura.Washington@ferc.gov.
j. This application is not ready for
environmental analysis at this time.
k. The Grand Rapids Project consists
of the following existing facilities: (1)
465-acre reservoir; (2) a concrete dam;
(3) and a 425-foot-long, 2.4-kilovolt
transmission line extending from the
powerhouse to the non-project Blandin
Paper Mill; and (4) a powerhouse
containing two generating units with a
total installed capacity of 2.1 megawatts.
The Grand Rapids Project is currently
operated in a run-of-river mode and
generates an annual average of
approximately 6,424,000 kilowatt hours.
Allete proposes to continue operating
the project as a run-of-river facility and
does not propose any new construction
to the project.
l. A copy of the application can be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. At this time, the Commission
has suspended access to the
Commission’s Public Reference Room
due to the proclamation declaring a
National Emergency concerning the
Novel Coronavirus Disease (COVID–19)
issued on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or (202) 502–
8659 (TTY).
m. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Procedural schedule: The
application will be processed according
to the following preliminary schedule.
Revisions to the schedule will be made
as appropriate.
Milestone
Issue Deficiency Letter
(if necessary).
Request Additional Information.
Notice of Acceptance/
Notice of Ready for
Environmental Analysis.
E:\FR\FM\29DEN1.SGM
29DEN1
Target date
January 2022.
February 2022.
June 2022.
Federal Register / Vol. 86, No. 247 / Wednesday, December 29, 2021 / Notices
o. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Dated: December 22, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–28296 Filed 12–28–21; 8:45 am]
BILLING CODE 6717–01–P1065
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
khammond on DSKJM1Z7X2PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC21–125–000;
EC21–128–000.
Applicants: PSEG Fossil LLC, PSEG
Fossil Sewaren Urban Renewal LLC,
PSEG Keys Energy Center LLC, PSEG
Energy Resources & Trade LLC, Parkway
Generation, LLC, Parkway Generation
Essex, LLC, PSEG New Haven LLC,
PSEG Power Connecticut LLC, PSEG
Power New York LLC, Generation
Bridge II, LLC.
Description: Response to December 6,
2021 Deficiency Letter of PSEG New
Haven LLC, et al.
Filed Date: 12/17/21.
Accession Number: 20211217–5420.
Comment Date: 5 p.m. ET 1/7/22.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG22–32–000.
Applicants: Flower Valley II LLC.
Description: Self-Certification of
Exempt Wholesale Generator Status of
Flower Valley II LLC.
Filed Date: 12/21/21.
Accession Number: 20211221–5203.
Comment Date: 5 p.m. ET 1/11/22.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–3079–019.
Applicants: Tyr Energy LLC.
Description: Updated Market Power
Analysis for Southwest Power Pool Inc.
Region of Tyr Energy LLC.
Filed Date: 12/22/21.
Accession Number: 20211222–5161.
Comment Date: 5 p.m. ET 2/21/22.
Docket Numbers: ER15–1873–013.
Applicants: Buckeye Wind Energy
LLC.
Description: Triennial Market Power
Analysis for Southwest Power Pool Inc.
Region of Buckeye Wind Energy LLC.
Filed Date: 12/21/21.
VerDate Sep<11>2014
20:20 Dec 28, 2021
Jkt 256001
Accession Number: 20211221–5218.
Comment Date: 5 p.m. ET 2/21/22.
Docket Numbers: ER16–1720–019.
Applicants: Invenergy Energy
Management LLC.
Description: Triennial Market Power
Analysis for Southwest Power Pool Inc.
Region of Invenergy Energy
Management LLC.
Filed Date: 12/21/21.
Accession Number: 20211221–5216.
Comment Date: 5 p.m. ET 2/21/22.
Docket Numbers: ER18–1639–014.
Applicants: Constellation Mystic
Power, LLC.
Description: Compliance filing: Sixth
Compliance Filing to be effective 6/1/
2022.
Filed Date: 12/20/21.
Accession Number: 20211220–5218.
Comment Date: 5 p.m. ET 1/10/22.
Docket Numbers: ER18–471–007;
ER18–472–007.
Applicants: States Edge Wind I
Holdings LLC, States Edge Wind I LLC.
Description: Triennial Market Power
Analysis for Southwest Power Pool Inc.
Region of States Edge Wind I LLC.
Filed Date: 12/21/21.
Accession Number: 20211221–5219.
Comment Date: 5 p.m. ET 2/21/22.
Docket Numbers: ER18–784–005.
Applicants: Upstream Wind Energy
LLC.
Description: Triennial Market Power
Analysis for Southwest Power Pool Inc.
Region of Upstream Wind Energy LLC.
Filed Date: 12/22/21.
Accession Number: 20211222–5159.
Comment Date: 5 p.m. ET 2/21/22.
Docket Numbers: ER20–387–003.
Applicants: Traverse Wind Energy
LLC.
Description: Triennial Market Power
Analysis for Southwest Power Pool Inc.
Region of Traverse Wind Energy LLC.
Filed Date: 12/21/21.
Accession Number: 20211221–5267.
Comment Date: 5 p.m. ET 2/21/22.
Docket Numbers: ER20–388–003.
Applicants: Traverse Wind Energy
Holdings LLC.
Description: Triennial Market Power
Analysis for Southwest Power Pool Inc.
Region of Traverse Wind Energy
Holdings LLC.
Filed Date: 12/21/21.
Accession Number: 20211221–5268.
Comment Date: 5 p.m. ET 2/21/22.
Docket Numbers: ER20–956–002.
Applicants: Thunderhead Wind
Energy LLC.
Description: Triennial Market Power
Analysis for Southwest Power Pool Inc.
Region of Thunderhead Wind Energy
LLC.
Filed Date: 12/21/21.
PO 00000
Frm 00015
Fmt 4703
Sfmt 4703
74077
Accession Number: 20211221–5266.
Comment Date: 5 p.m. ET 2/21/22.
Docket Numbers: ER21–2137–002.
Applicants: IR Energy Management
LLC.
Description: Triennial Market Power
Analysis for Southwest Power Pool Inc.
Region of IR Energy Management LLC.
Filed Date: 12/21/21.
Accession Number: 20211221–5217.
Comment Date: 5 p.m. ET 2/21/22.
Docket Numbers: ER21–2600–002.
Applicants: Southwest Power Pool,
Inc.
Description: Compliance filing:
Compliance Filing in Response to Order
issued in ER21–2600 (L and O) to be
effective 12/1/2021.
Filed Date: 12/22/21.
Accession Number: 20211222–5043.
Comment Date: 5 p.m. ET 1/12/22.
Docket Numbers: ER22–69–000.
Applicants: Indeck Niles, LLC.
Description: Supplement to October 7,
2021 Indeck Niles, LLC tariff filing.
Filed Date: 11/15/21.
Accession Number: 20211115–5226.
Comment Date: 5 p.m. ET 1/3/22.
Docket Numbers: ER22–703–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Revisions to PJM’s FTR Credit
Requirement and Request for 28-Day
Comment Period to be effective 2/27/
2022.
Filed Date: 12/21/21.
Accession Number: 20211221–5202.
Comment Date: 5 p.m. ET 1/11/22.
Docket Numbers: ER22–705–000.
Applicants: New York Independent
System Operator, Inc.
Description: § 205(d) Rate Filing: 205:
Market Power Mitigation Measures that
apply to uneconomic production to be
effective 2/21/2022.
Filed Date: 12/22/21.
Accession Number: 20211222–5059.
Comment Date: 5 p.m. ET 1/12/22.
Docket Numbers: ER22–706–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
Revisions to the Formula Rate for
Southwestern Public Service Co.
(‘‘SPS’’) to be effective 10/1/2021.
Filed Date: 12/22/21.
Accession Number: 20211222–5100.
Comment Date: 5 p.m. ET 1/12/22.
Docket Numbers: ER22–707–000.
Applicants: ISO New England Inc.,
New England Power Company.
Description: § 205(d) Rate Filing: ISO
New England Inc. submits tariff filing
per 35.13(a)(2)(iii: New England Power;
Second Revised Service Agreement No.
TSA–NEP–86 to be effective 1/1/2022.
E:\FR\FM\29DEN1.SGM
29DEN1
Agencies
[Federal Register Volume 86, Number 247 (Wednesday, December 29, 2021)]
[Notices]
[Pages 74076-74077]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-28296]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2362-044]
Allete, Inc.; Notice of Application Tendered for Filing With the
Commission and Establishing Procedural Schedule for Licensing and
Deadline for Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 2362-044.
c. Date filed: December 20, 2021.
d. Applicant: Allete, Inc. (Allete).
e. Name of Project: Grand Rapids Hydroelectric Project (Grand
Rapids Project).
f. Location: On the Mississippi River near the City of Grand Rapids
in Itasca County, Minnesota. The project does not include any federal
lands.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Mr. David R. Moeller, Senior Attorney &
Director of Regulatory Compliance, ALLETE, Inc., d.b.a. Minnesota
Power, 30 West Superior Street, Duluth, MN 55802, 218-723-3963,
[email protected].
i. FERC Contact: Laura Washington (202) 502-6072,
[email protected].
j. This application is not ready for environmental analysis at this
time.
k. The Grand Rapids Project consists of the following existing
facilities: (1) 465-acre reservoir; (2) a concrete dam; (3) and a 425-
foot-long, 2.4-kilovolt transmission line extending from the powerhouse
to the non-project Blandin Paper Mill; and (4) a powerhouse containing
two generating units with a total installed capacity of 2.1 megawatts.
The Grand Rapids Project is currently operated in a run-of-river
mode and generates an annual average of approximately 6,424,000
kilowatt hours. Allete proposes to continue operating the project as a
run-of-river facility and does not propose any new construction to the
project.
l. A copy of the application can be viewed on the Commission's
website at https://www.ferc.gov using the ``eLibrary'' link. Enter the
docket number excluding the last three digits in the docket number
field to access the document. At this time, the Commission has
suspended access to the Commission's Public Reference Room due to the
proclamation declaring a National Emergency concerning the Novel
Coronavirus Disease (COVID-19) issued on March 13, 2020. For
assistance, contact FERC at [email protected] or call toll-
free, (866) 208-3676 or (202) 502-8659 (TTY).
m. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. Procedural schedule: The application will be processed according
to the following preliminary schedule. Revisions to the schedule will
be made as appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Issue Deficiency Letter (if January 2022.
necessary).
Request Additional Information....... February 2022.
Notice of Acceptance/Notice of Ready June 2022.
for Environmental Analysis.
------------------------------------------------------------------------
[[Page 74077]]
o. Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: December 22, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-28296 Filed 12-28-21; 8:45 am]
BILLING CODE 6717-01-P1065