Alabama Power Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests, 4577-4578 [2022-01756]

Download as PDF Federal Register / Vol. 87, No. 19 / Friday, January 28, 2022 / Notices Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Dated: January 24, 2022. Kimberly D. Bose, Secretary. [FR Doc. 2022–01752 Filed 1–27–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. IN17–4–000] Rover Pipeline, LLC; Energy Transfer Partners, L.P.; Updated Notice of Designation of Commission Staff as Non-Decisional With respect to an order issued by the Commission on December 16, 2021, in the above-captioned docket, with the exceptions noted below, the staff of the Office of Enforcement are designated as non-decisional in deliberations by the Commission in this docket.1 Accordingly, pursuant to 18 CFR 385.2202 (2021), they will not serve as advisors to the Commission or take part in the Commission’s review of any offer of settlement. Likewise, as nondecisional staff, pursuant to 18 CFR 385.2201 (2021), they are prohibited from communicating with advisory staff concerning any deliberations in this docket. Exceptions to this designation as nondecisional are: jspears on DSK121TN23PROD with NOTICES1 Serrita Hill Seema K. Jain Grace Kwon Gabriel Sterling Dated: January 21, 2022. Kimberly D. Bose, Secretary. [FR Doc. 2022–01679 Filed 1–27–22; 8:45 am] BILLING CODE 6717–01–P 1 Rover Pipeline, LLC and Energy Transfer Partners, L.P., 177 FERC ¶ 61,182 (2021). VerDate Sep<11>2014 18:03 Jan 27, 2022 Jkt 256001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 349–166] Alabama Power Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Non-Project Use of Project Lands and Waters. b. Project No.: 349–166. c. Date Filed: December 8, 2021. d. Applicant: Alabama Power Company. e. Name of Project: Martin Dam Hydroelectric Project. f. Location: The Martin Dam Hydroelectric Project is located on the Tallapoosa River (Lake Martin), in Tallapoosa, Elmore, and Coosa counties, Alabama, and occupies federal land administered by the U.S. Bureau of Land Management; the non-project use is located in Tallapoosa County. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Unzell Kelley, Alabama Power Company at (205) 517– 0885 or ukelley@southernco.com. i. FERC Contact: Shana High at (202) 502–8674 or shana.high@ferc.gov. j. Deadline for filing motions to intervene and protests: February 23, 2022. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 4577 page of any filing should include docket number P–349–166. Comments emailed to Commission staff are not considered part of the Commission record. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Description of Request: Alabama Power Company is requesting Commission approval to permit Harbor Pointe Marina to dredge approximately 1,492 cubic yards at its existing commercial marina. l. Locations of the Application: This filing may be viewed on the Commission’s website at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. Agencies may obtain copies of the application directly from the applicant. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214, respectively. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing E:\FR\FM\28JAN1.SGM 28JAN1 4578 Federal Register / Vol. 87, No. 19 / Friday, January 28, 2022 / Notices responds; (3) furnish the name, address, and telephone number of the person commenting, protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. Any filing made by an intervenor must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010. Dated: January 24, 2022. Kimberly D. Bose, Secretary. [FR Doc. 2022–01756 Filed 1–27–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 11132–029] jspears on DSK121TN23PROD with NOTICES1 KEI (USA) Power Management (I), LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process a. Type of Filing: Notice of Intent to File License Application and Request to Use the Traditional Licensing Process. b. Project No.: 11132–029. c. Date Filed: November 22, 2021. d. Submitted By: KEI (USA) Power Management (I), LLC (KEI). e. Name of Project: Eustis Hydroelectric Project (project). f. Location: On the North Branch of the Dead River in Franklin County, Maine. No federal lands are occupied by the project works or located within the project boundary. g. Filed Pursuant to: 18 CFR 5.3 and 5.5 of the Commission’s regulations. h. Potential Applicant Contact: Mr. Lewis C. Loon, KEI (USA) Power Management (III) LLC.; 423 Brunswick Avenue, Gardiner, ME 04345; (207) 203–3027; or email at LewisC.Loon@ kruger.com. i. FERC Contact: Erin Kimsey at (202) 502–8621; or email at erin.kimsey@ ferc.gov. j. KEI filed its request to use the Traditional Licensing Process on November 22, 2021, and provided public notice of its request on November 16, 2021. In a letter dated January 21, 2022, the Director of the Division of Hydropower Licensing approved KEI’s request to use the Traditional Licensing Process. k. With this notice, we are initiating informal consultation with the U.S. Fish VerDate Sep<11>2014 18:03 Jan 27, 2022 Jkt 256001 and Wildlife Service and NOAA Fisheries under section 7 of the Endangered Species Act and the joint agency regulations thereunder at 50 CFR, part 402; and NOAA Fisheries under section 305(b) of the MagnusonStevens Fishery Conservation and Management Act and implementing regulations at 50 CFR 600.920. We are also initiating consultation with the Maine State Historic Preservation Officer, as required by section 106 of the National Historic Preservation Act, and the implementing regulations of the Advisory Council on Historic Preservation at 36 CFR 800.2. l. With this notice, we are designating KEI as the Commission’s non-federal representative for carrying out informal consultation pursuant to section 7 of the Endangered Species Act and section 305(b) of the Magnuson-Stevens Fishery Conservation and Management Act; and consultation pursuant to section 106 of the National Historic Preservation Act. m. On November 22, 2021, KEI filed a Pre-Application Document (PAD; including a proposed process plan and schedule) with the Commission, pursuant to 18 CFR 5.6 of the Commission’s regulations. n. A copy of the PAD may be viewed and/or printed on the Commission’s website (https://www.ferc.gov), using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). o. The licensee states its unequivocal intent to submit an application for a subsequent license for Project No. 11132. Pursuant to 18 CFR 16.20, each application for a subsequent license and any competing license applications must be filed with the Commission at least 24 months prior to the expiration of the existing license. All applications for license for this project must be filed by November 30, 2024. p. Register online at https:// ferconline.ferc.gov/FERCOnline.aspx to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Dated: January 21, 2022. Kimberly D. Bose, Secretary. [FR Doc. 2022–01682 Filed 1–27–22; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP22–2–000] Gas Transmission Northwest LLC; Notice of Intent To Prepare an Environmental Impact Statement for The Proposed GTN Xpress Project Request for Comments on Environmental Issues, and Schedule for Environmental Review The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental impact statement (EIS) that will discuss the environmental impacts of the GTN XPress Project (Project) involving the modification and operation of existing compression facilities by Gas Transmission Northwest LLC (GTN) in Idaho, Washington, and Oregon. The Commission will use this EIS in its decision-making process to determine whether the Project is in the public convenience and necessity. The schedule for preparation of the EIS is discussed in the Schedule for Environmental Review section of this notice. This notice announces the opening of the scoping process the Commission will use to gather input from the public and interested agencies regarding the project. As part of the National Environmental Policy Act (NEPA) review process, the Commission takes into account concerns the public may have about proposals and the environmental impacts that could result from its action whenever it considers the issuance of a Certificate of Public Convenience and Necessity. This gathering of public input is referred to as ‘‘scoping.’’ The main goal of the scoping process is to focus the analysis in the environmental document on the important environmental issues. Additional information about the Commission’s NEPA process is described below in the NEPA Process and the EIS section of this notice. By this notice, the Commission requests public comments on the scope of issues to address in the environmental document, including comments on potential alternatives and impacts, and any relevant information, studies, or analyses of any kind concerning impacts affecting the quality of the human environment. To ensure that your comments are timely and properly recorded, please submit your comments so that the Commission receives them in Washington, DC on or before 5:00 p.m. E:\FR\FM\28JAN1.SGM 28JAN1

Agencies

[Federal Register Volume 87, Number 19 (Friday, January 28, 2022)]
[Notices]
[Pages 4577-4578]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-01756]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 349-166]


Alabama Power Company; Notice of Application Accepted for Filing 
and Soliciting Comments, Motions To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Non-Project Use of Project Lands and 
Waters.
    b. Project No.: 349-166.
    c. Date Filed: December 8, 2021.
    d. Applicant: Alabama Power Company.
    e. Name of Project: Martin Dam Hydroelectric Project.
    f. Location: The Martin Dam Hydroelectric Project is located on the 
Tallapoosa River (Lake Martin), in Tallapoosa, Elmore, and Coosa 
counties, Alabama, and occupies federal land administered by the U.S. 
Bureau of Land Management; the non-project use is located in Tallapoosa 
County.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: Unzell Kelley, Alabama Power Company at (205) 
517-0885 or [email protected].
    i. FERC Contact: Shana High at (202) 502-8674 or 
[email protected].
    j. Deadline for filing motions to intervene and protests: February 
23, 2022.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, and protests using the Commission's 
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. 
Commenters can submit brief comments up to 6,000 characters, without 
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact 
information at the end of your comments. For assistance, please contact 
FERC Online Support at [email protected], (866) 208-3676 (toll 
free), or (202) 502-8659 (TTY). In lieu of electronic filing, you may 
submit a paper copy. Submissions sent via the U.S. Postal Service must 
be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory 
Commission, 888 First Street NE, Room 1A, Washington, DC 20426. 
Submissions sent via any other carrier must be addressed to: Kimberly 
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins 
Avenue, Rockville, Maryland 20852. The first page of any filing should 
include docket number P-349-166. Comments emailed to Commission staff 
are not considered part of the Commission record.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person whose name appears on the official service 
list for the project. Further, if an intervenor files comments or 
documents with the Commission relating to the merits of an issue that 
may affect the responsibilities of a particular resource agency, they 
must also serve a copy of the document on that resource agency.
    k. Description of Request: Alabama Power Company is requesting 
Commission approval to permit Harbor Pointe Marina to dredge 
approximately 1,492 cubic yards at its existing commercial marina.
    l. Locations of the Application: This filing may be viewed on the 
Commission's website at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. You may also register 
online at https://www.ferc.gov/docs-filing/esubscription.asp to be 
notified via email of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208-3676 or email 
[email protected], for TTY, call (202) 502-8659. Agencies may 
obtain copies of the application directly from the applicant.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214, respectively. In determining the appropriate action to take, the 
Commission will consider all protests or other comments filed, but only 
those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any comments, 
protests, or motions to intervene must be received on or before the 
specified comment date for the particular application.
    o. Filing and Service of Documents: Any filing must (1) bear in all 
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO 
INTERVENE'' as applicable; (2) set forth in the heading the name of the 
applicant and the project number of the application to which the filing

[[Page 4578]]

responds; (3) furnish the name, address, and telephone number of the 
person commenting, protesting or intervening; and (4) otherwise comply 
with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis. Any filing made by an intervenor must be accompanied 
by proof of service on all persons listed in the service list prepared 
by the Commission in this proceeding, in accordance with 18 CFR 
385.2010.

    Dated: January 24, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-01756 Filed 1-27-22; 8:45 am]
BILLING CODE 6717-01-P