Klamath River Renewal Corporation and PacifiCorp; Notice of Availability of the Draft Environmental Impact Statement for the Surrender, Decommissioning, and Removal of the Lower Klamath Hydroelectric Project, 12445-12446 [2022-04537]

Download as PDF lotter on DSK11XQN23PROD with NOTICES1 Federal Register / Vol. 87, No. 43 / Friday, March 4, 2022 / Notices Comment Date: 5 p.m. ET 3/21/22. Docket Numbers: ER21–2900–004. Applicants: Duke Energy Florida, LLC, Duke Energy Carolinas, LLC, Duke Energy Progress, LLC. Description: Compliance filing: Duke Energy Florida, LLC submits tariff filing per 35: Network Contract Demand Compliance Filing to be effective 11/17/ 2021. Filed Date: 2/28/22. Accession Number: 20220228–5194. Comment Date: 5 p.m. ET 3/21/22. Docket Numbers: ER22–272–001. Applicants: Gulf Power Company. Description: Tariff Amendment: Response to Deficiency Letter to be effective 1/1/2022. Filed Date: 2/28/22. Accession Number: 20220228–5061. Comment Date: 5 p.m. ET 3/21/22. Docket Numbers: ER22–273–001. Applicants: Florida Power & Light Company. Description: Tariff Amendment: FPL– LCEC RS 317 Response to Deficiency Letter to be effective 1/1/2022. Filed Date: 2/28/22. Accession Number: 20220228–5066. Comment Date: 5 p.m. ET 3/21/22. Docket Numbers: ER22–276–001. Applicants: Florida Power & Light Company. Description: Tariff Amendment: FPL– FKEC RS 322 Response to Deficiency Letter to be effective 1/1/2022. Filed Date: 2/28/22. Accession Number: 20220228–5070. Comment Date: 5 p.m. ET 3/21/22. Docket Numbers: ER22–355–000; ER22–355–001. Applicants: ISO New England Inc. Description: Informational Filing which contains non-public versions of its Resource Termination Filing and its Motion for Leave to File Answer and Answer of ISO-New England, Inc. Filed Date: 2/24/22. Accession Number: 20220224–5231. Comment Date: 5 p.m. ET 3/17/22. Docket Numbers: ER22–486–001. Applicants: PJM Interconnection, L.L.C. Description: Tariff Amendment: Response to 1/27/2022 Deficiency Notice re: Docket No. ER22–486–000 to be effective 1/29/2022. Filed Date: 2/28/22. Accession Number: 20220228–5088. Comment Date: 5 p.m. ET 3/21/22. Docket Numbers: ER22–643–001. Applicants: Southwest Power Pool, Inc. Description: Tariff Amendment: 3881 Southwestern Power Admin & AEP OK—Deficiency Response to be effective 12/1/2021. VerDate Sep<11>2014 17:05 Mar 03, 2022 Jkt 256001 Filed Date: 2/28/22. Accession Number: 20220228–5011. Comment Date: 5 p.m. ET 3/21/22. Docket Numbers: ER22–644–001. Applicants: Southwest Power Pool, Inc. Description: Tariff Amendment: 3882 Southwestern Power Admin&Publ Ser— Deficiency Response to be effective 12/ 1/2021. Filed Date: 2/28/22. Accession Number: 20220228–5018. Comment Date: 5 p.m. ET 3/21/22. Docket Numbers: ER22–1123–000. Applicants: Elk Hill Solar 1, LLC. Description: Baseline eTariff Filing: Reactive Power Compensation Filing to be effective 3/1/2022. Filed Date: 2/28/22. Accession Number: 20220228–5002. Comment Date: 5 p.m. ET 3/21/22. Docket Numbers: ER22–1124–000. Applicants: NSTAR Electric Company. Description: § 205(d) Rate Filing: New England Power Company—Facilities Support Agreement to be effective 2/22/ 2022. Filed Date: 2/28/22. Accession Number: 20220228–5034. Comment Date: 5 p.m. ET 3/21/22. Docket Numbers: ER22–1125–000. Applicants: Basin Electric Power Cooperative. Description: § 205(d) Rate Filing: Basin Electric Notice of Cancellation of Load Incentive Rate to be effective 3/1/ 2022. Filed Date: 2/28/22. Accession Number: 20220228–5052. Comment Date: 5 p.m. ET 3/21/22. Docket Numbers: ER22–1126–000. Applicants: Cheyenne Light, Fuel and Power Company. Description: Informational Filing of 2022 Formula Rate Annual Update of Cheyenne Light, Fuel and Power Company. Filed Date: 2/25/22. Accession Number: 20220225–5263. Comment Date: 5 p.m. ET 3/18/22. Docket Numbers: ER22–1127–000. Applicants: Tri-State Generation and Transmission Association, Inc. Description: § 205(d) Rate Filing: Service Agreement No. 904 to be effective 2/25/2022. Filed Date: 2/28/22. Accession Number: 20220228–5121. Comment Date: 5 p.m. ET 3/21/22. Docket Numbers: ER22–1128–000. Applicants: Alabama Power Company, Georgia Power Company, Mississippi Power Company. Description: § 205(d) Rate Filing: Alabama Power Company submits tariff filing per 35.13(a)(2)(iii: PEHA bn PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 12445 (Pepper Hammock Solar & Storage) LGIA Filing to be effective 2/11/2022. Filed Date: 2/28/22. Accession Number: 20220228–5136. Comment Date: 5 p.m. ET 3/21/22. Docket Numbers: ER22–1129–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 1628R20 Western Farmers Electric Cooperative NITSA NOAs to be effective 2/1/2022. Filed Date: 2/28/22. Accession Number: 20220228–5139. Comment Date: 5 p.m. ET 3/21/22. Docket Numbers: ER22–1130–000. Applicants: Midwest Generation, LLC. Description: § 205(d) Rate Filing: Proposed Revisions to Reactive Service Rate Schedule to be effective 6/1/2022. Filed Date: 2/28/22. Accession Number: 20220228–5198. Comment Date: 5 p.m. ET 3/21/22. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: February 28, 2022. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2022–04601 Filed 3–3–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14803–001 and P–2082–063] Klamath River Renewal Corporation and PacifiCorp; Notice of Availability of the Draft Environmental Impact Statement for the Surrender, Decommissioning, and Removal of the Lower Klamath Hydroelectric Project In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory E:\FR\FM\04MRN1.SGM 04MRN1 lotter on DSK11XQN23PROD with NOTICES1 12446 Federal Register / Vol. 87, No. 43 / Friday, March 4, 2022 / Notices Commission’s (Commission) regulations, 18 CFR part 380, the Office of Energy Projects has reviewed the application for surrender of license and removal of project works for the Lower Klamath Hydroelectric Project No. 14803 and has prepared a draft environmental impact statement (EIS).1 The project is located on the Klamath River in Klamath County, Oregon, and in Siskiyou County, California. The project occupies approximately 400 acres of federal lands. These federal lands are administered by the U.S. Department of the Interior, Bureau of Land Management (BLM). The draft EIS contains staff evaluations of the applicant’s proposal and the alternatives for surrender of the Lower Klamath Project. The draft EIS documents the views of governmental agencies, non-governmental organizations, affected Indian Tribes, the public, the applicants, and Commission staff. In this notice, we acknowledge the number of pages in this draft EIS exceeds the final EIS page limits set forth in CEQ’s Final Rule for proposals of unusual scope or complexity. Noting the scope and complexity of this proposal, the Director, Office of Energy Projects, as our senior agency official, has authorized this page limit exceedance for both the draft and final EIS. The Commission provides all interested persons with an opportunity to view and/or print the draft EIS via the internet through the Commission’s Home Page (https://www.ferc.gov/), using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field, to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), in a Presidential proclamation issued on March 13, 2020. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov, or tollfree at (866) 208–3676, or for TTY, (202) 502–8659. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. 1 On July 16, 2020, the Council on Environmental Quality (CEQ) issued a final rule, Update to the Regulations Implementing the Procedural Provisions of the National Environmental Policy Act (Final Rule, 85 FR 43,304), which was effective as of September 14, 2020. Accordingly, this EIS was prepared pursuant to the Final Rule. VerDate Sep<11>2014 17:05 Mar 03, 2022 Jkt 256001 For assistance, contact FERC Online Support. All comments must be filed by April 18, 2022. Due to concerns with large gatherings related to COVID–19, we do not intend to conduct public meetings for the purpose of receiving comments on the draft EIS. Instead, we are soliciting only written comments. The Commission strongly encourages electronic filing. Please file comments using the Commission’s eFiling system at https://ferconline.ferc.gov/ eFiling.aspx. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://ferconline. ferc.gov/QuickComment.aspx. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support. In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include the docket numbers P– 14803–001 and P–2082–063. Anyone may intervene in this proceeding based on this draft EIS (18 CFR 380.10). You must file your request to intervene as specified above.2 You do not need intervenor status to have your comments considered. For further information, please contact Diana Shannon at (202) 502– 6136 or at diana.shannon@ferc.gov. Dated: February 25, 2022. Kimberly D. Bose, Secretary. [FR Doc. 2022–04537 Filed 3–3–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: RP22–584–000. 2 Interventions may also be filed electronically via the internet in lieu of paper. See the previous discussion on filing comments electronically. PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 Applicants: Florida Gas Transmission Company, LLC. Description: § 4(d) Rate Filing: New Service Agreement—Seminole to be effective 4/1/2022. Filed Date: 2/24/22. Accession Number: 20220224–5080. Comment Date: 5 p.m. ET 3/8/22. Docket Numbers: RP22–585–000. Applicants: Florida Gas Transmission Company, LLC. Description: § 4(d) Rate Filing: Update Non-Conforming List—Seminole to be effective 4/1/2022. Filed Date: 2/24/22. Accession Number: 20220224–5082. Comment Date: 5 p.m. ET 3/8/22. Docket Numbers: RP22–586–000. Applicants: Empire Pipeline, Inc. Description: Compliance filing: Refund Report Jan–Dec 2021 (Per Settlement in RP18–940) to be effective N/A. Filed Date: 2/24/22. Accession Number: 20220224–5123. Comment Date: 5 p.m. ET 3/8/22. Docket Numbers: RP22–587–000. Applicants: Tres Palacios Gas Storage LLC. Description: Compliance filing: Tres Palacios Gas Storage Docket No. CP12– 36 Updated Market Power Analysis to be effective N/A. Filed Date: 2/24/22. Accession Number: 20220224–5156. Comment Date: 5 p.m. ET 3/8/22. Docket Numbers: RP22–588–000. Applicants: ANR Pipeline Company. Description: § 4(d) Rate Filing: ANR Fuel Filing 2022 to be effective 4/1/ 2022. Filed Date: 2/24/22. Accession Number: 20220224–5160. Comment Date: 5 p.m. ET 3/8/22. Docket Numbers: RP22–589–000. Applicants: Viking Gas Transmission Company. Description: § 4(d) Rate Filing: Annual LMCRA—Spring 2022 to be effective 4/ 1/2022. Filed Date: 2/25/22. Accession Number: 20220225–5019. Comment Date: 5 p.m. ET 3/9/22. Docket Numbers: RP22–590–000. Applicants: KPC Pipeline, LLC. Description: § 4(d) Rate Filing: Fuel Reimbursement Adjustment to be effective 4/1/2022. Filed Date: 2/25/22. Accession Number: 20220225–5021. Comment Date: 5 p.m. ET 3/9/22. Docket Numbers: RP22–591–000. Applicants: Gulf South Pipeline Company, LLC. Description: § 4(d) Rate Filing: Cap Rel Neg Rate Agmts (Atlanta Gas 8438 releases eff 3–1–2022) to be effective 3/ 1/2022. E:\FR\FM\04MRN1.SGM 04MRN1

Agencies

[Federal Register Volume 87, Number 43 (Friday, March 4, 2022)]
[Notices]
[Pages 12445-12446]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-04537]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project Nos. 14803-001 and P-2082-063]


Klamath River Renewal Corporation and PacifiCorp; Notice of 
Availability of the Draft Environmental Impact Statement for the 
Surrender, Decommissioning, and Removal of the Lower Klamath 
Hydroelectric Project

    In accordance with the National Environmental Policy Act of 1969 
and the Federal Energy Regulatory

[[Page 12446]]

Commission's (Commission) regulations, 18 CFR part 380, the Office of 
Energy Projects has reviewed the application for surrender of license 
and removal of project works for the Lower Klamath Hydroelectric 
Project No. 14803 and has prepared a draft environmental impact 
statement (EIS).\1\ The project is located on the Klamath River in 
Klamath County, Oregon, and in Siskiyou County, California. The project 
occupies approximately 400 acres of federal lands. These federal lands 
are administered by the U.S. Department of the Interior, Bureau of Land 
Management (BLM).
---------------------------------------------------------------------------

    \1\ On July 16, 2020, the Council on Environmental Quality (CEQ) 
issued a final rule, Update to the Regulations Implementing the 
Procedural Provisions of the National Environmental Policy Act 
(Final Rule, 85 FR 43,304), which was effective as of September 14, 
2020. Accordingly, this EIS was prepared pursuant to the Final Rule.
---------------------------------------------------------------------------

    The draft EIS contains staff evaluations of the applicant's 
proposal and the alternatives for surrender of the Lower Klamath 
Project. The draft EIS documents the views of governmental agencies, 
non-governmental organizations, affected Indian Tribes, the public, the 
applicants, and Commission staff.
    In this notice, we acknowledge the number of pages in this draft 
EIS exceeds the final EIS page limits set forth in CEQ's Final Rule for 
proposals of unusual scope or complexity. Noting the scope and 
complexity of this proposal, the Director, Office of Energy Projects, 
as our senior agency official, has authorized this page limit 
exceedance for both the draft and final EIS.
    The Commission provides all interested persons with an opportunity 
to view and/or print the draft EIS via the internet through the 
Commission's Home Page (https://www.ferc.gov/), using the ``eLibrary'' 
link. Enter the docket number, excluding the last three digits in the 
docket number field, to access the document. At this time, the 
Commission has suspended access to the Commission's Public Reference 
Room, due to the proclamation declaring a National Emergency concerning 
the Novel Coronavirus Disease (COVID-19), in a Presidential 
proclamation issued on March 13, 2020. For assistance, contact FERC 
Online Support at [email protected], or toll-free at (866) 
208-3676, or for TTY, (202) 502-8659.
    You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    All comments must be filed by April 18, 2022.
    Due to concerns with large gatherings related to COVID-19, we do 
not intend to conduct public meetings for the purpose of receiving 
comments on the draft EIS. Instead, we are soliciting only written 
comments.
    The Commission strongly encourages electronic filing. Please file 
comments using the Commission's eFiling system at https://ferconline.ferc.gov/eFiling.aspx. Commenters can submit brief comments 
up to 6,000 characters, without prior registration, using the eComment 
system at https://ferconline.ferc.gov/QuickComment.aspx. You must 
include your name and contact information at the end of your comments. 
For assistance, please contact FERC Online Support. In lieu of 
electronic filing, you may submit a paper copy. Submissions sent via 
the U.S. Postal Service must be addressed to: Kimberly D. Bose, 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, 
Room 1A, Washington, DC 20426. Submissions sent via any other carrier 
must be addressed to: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. 
The first page of any filing should include the docket numbers P-14803-
001 and P-2082-063.
    Anyone may intervene in this proceeding based on this draft EIS (18 
CFR 380.10). You must file your request to intervene as specified 
above.\2\ You do not need intervenor status to have your comments 
considered.
---------------------------------------------------------------------------

    \2\ Interventions may also be filed electronically via the 
internet in lieu of paper. See the previous discussion on filing 
comments electronically.
---------------------------------------------------------------------------

    For further information, please contact Diana Shannon at (202) 502-
6136 or at [email protected].

    Dated: February 25, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-04537 Filed 3-3-22; 8:45 am]