of Alternative 2 and consist of the
following: (1) An upper reservoir with
either: (a) A surface area of 73.1 acres
and a storage volume of approximately
3,615 acre-feet created by a 6,100-footlong, 200-foot-high embankment dam or
(b) with a surface area of 256 acres and
a storage volume of approximately 3,700
acre-feet created by a 2,400-foot-long,
240-foot-high embankment dam; (2) a
lower reservoir with a surface area of
73.1 acres and a storage volume of
approximately 3,800 acre-feet created by
a 4,900-foot-long, 130-foot-high
embankment dam; (3) either a 1.7- or
4.2-mile-long, 20-foot steel penstock
with a diameter of 20-feet connecting
the upper reservoir with the
powerhouse/pump station; (4) a 150foot-long, 50-foot-wide concrete
powerhouse/pump station located on
the lower reservoir shoreline containing
three 167-MW generating/pumping
units for a total capacity of 500 MW; (5)
a 10.1-mile-long, 230-kV transmission
line interconnecting to PacifiCorp’s
Amasa substation; (6) a 17.8-mile-long,
24-inch-diameter underground pipeline
to divert water from the North Platte
River near Glenrock to the project for
initial and maintenance fill; and, (7)
appurtenant facilities.
The estimated annual generation of
the Rocky Ridge Project would be 1,460
gigawatt-hours.
Applicant Contact: Tim Hemstreet,
Managing Director, Renewable Energy
Development, PacifiCorp, 825 NE
Multnomah, Suite 1800, Portland, OR
97232; email: Tim.Hemstreet@
pacificorp.com; phone: (503) 813–6170.
FERC Contact: John Matkowski;
email: john.matkowski@ferc.gov; phone:
(202) 502–8576.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. In lieu of electronic
filing, you may submit a paper copy.
Submissions sent via the U.S. Postal
Service must be addressed to: Kimberly
D. Bose, Secretary, Federal Energy
VerDate Sep<11>2014
17:00 Jan 14, 2022
Jkt 256001
Regulatory Commission, 888 First Street
NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include docket
number P–15244–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s website at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–15244) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Milestone
Commission issues EA ......
Comments on EA ..............
Target date
June 2022.1
July 2022.
Any questions regarding this notice
may be directed to Kristine Sillett at
(202) 502–6575 or kristine.sillett@
ferc.gov.
Dated: January 11, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–00812 Filed 1–14–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Dated: January 11, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–00814 Filed 1–14–22; 8:45 am]
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Filings Instituting Proceedings
Federal Energy Regulatory
Commission
Docket Numbers: PR22–5–001.
Applicants: Eagle Ford Midstream,
LP.
Description: Submits tariff filing per
284.123(b),(e)+(g): Amended Section
311 Rate Approval to be effective
11/12/2021.
Filed Date: 1/7/2022.
Accession Number: 20220107™5076.
Comments Due: 5 p.m. ET 1/28/22.
284.123(g) Protests Due: 5 p.m. ET
1/28/22.
Docket Numbers: RP22–479–000.
Applicants: Adelphia Gateway, LLC.
Description: § 4(d) Rate Filing:
Adelphia Negotiated Rate filing 1–10–22
to be effective 1/10/2022.
Filed Date: 1/10/22.
Accession Number: 20220110–5100.
Comment Date: 5 p.m. ET 1/24/22.
Docket Numbers: RP22–480–000.
Applicants: Gas Transmission
Northwest LLC.
Description: Compliance filing:
Report of Refunds—Coyote Springs
Lateral IT Revenue (Nov. 2020–Oct.
2021) to be effective N/A.
Filed Date: 1/10/22.
Accession Number: 20220110–5113.
Comment Date: 5 p.m. ET 1/24/22.
Any person desiring to intervene or
protest in any of the above proceedings
[Project No. 3472–024]
Aspinook Hydro, LLC; Notice of Intent
To Prepare an Environmental
Assessment
On April 30, 2020, Aspinook Hydro,
LLC filed an application for a new major
license for the 2.78-megawatt Wyre
Wynd Hydroelectric Project (Wyre
Wynd Project) (FERC No. 3472). The
Wyre Wynd Project is located on the
Quinebaug River in New London and
Windham Counties, Connecticut. The
project does not occupy federal land.
In accordance with the Commission’s
regulations, on October 6, 2021,
Commission staff issued a notice that
the project was ready for environmental
analysis (REA notice). Based on the
information in the record, including
comments filed on the REA notice, staff
does not anticipate that licensing the
project would constitute a major federal
action significantly affecting the quality
of the human environment. Therefore,
staff intends to prepare an
Environmental Assessment (EA) on the
application to license the Wyre Wynd
Project.
The EA will be issued and circulated
for review by all interested parties. All
comments filed on the EA will be
analyzed by staff and considered in the
Commission’s final licensing decision.
The application will be processed
according to the following schedule.
Revisions to the schedule may be made
as appropriate.
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
1 The Council on Environmental Quality’s (CEQ)
regulations under 40 CFR 1501.10(b)(1) require that
EAs be completed within 1 year of the federal
action agency’s decision to prepare an EA. This
notice establishes the Commission’s intent to
prepare an EA for the Wyre Wynd Project.
Therefore, in accordance with CEQ’s regulations,
the EA must be issued within 1 year of the issuance
date of this notice.
E:\FR\FM\18JAN1.SGM
18JAN1
Agencies
[Federal Register Volume 87, Number 11 (Tuesday, January 18, 2022)]
[Notices]
[Page 2605]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-00812]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 3472-024]
Aspinook Hydro, LLC; Notice of Intent To Prepare an Environmental
Assessment
On April 30, 2020, Aspinook Hydro, LLC filed an application for a
new major license for the 2.78-megawatt Wyre Wynd Hydroelectric Project
(Wyre Wynd Project) (FERC No. 3472). The Wyre Wynd Project is located
on the Quinebaug River in New London and Windham Counties, Connecticut.
The project does not occupy federal land.
In accordance with the Commission's regulations, on October 6,
2021, Commission staff issued a notice that the project was ready for
environmental analysis (REA notice). Based on the information in the
record, including comments filed on the REA notice, staff does not
anticipate that licensing the project would constitute a major federal
action significantly affecting the quality of the human environment.
Therefore, staff intends to prepare an Environmental Assessment (EA) on
the application to license the Wyre Wynd Project.
The EA will be issued and circulated for review by all interested
parties. All comments filed on the EA will be analyzed by staff and
considered in the Commission's final licensing decision.
The application will be processed according to the following
schedule. Revisions to the schedule may be made as appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Commission issues EA................... June 2022.\1\
Comments on EA......................... July 2022.
------------------------------------------------------------------------
Any questions regarding this notice may be directed to Kristine
Sillett at (202) 502-6575 or [email protected].
---------------------------------------------------------------------------
\1\ The Council on Environmental Quality's (CEQ) regulations
under 40 CFR 1501.10(b)(1) require that EAs be completed within 1
year of the federal action agency's decision to prepare an EA. This
notice establishes the Commission's intent to prepare an EA for the
Wyre Wynd Project. Therefore, in accordance with CEQ's regulations,
the EA must be issued within 1 year of the issuance date of this
notice.
Dated: January 11, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-00812 Filed 1-14-22; 8:45 am]