PE Hydro Generation, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments, 3798 [2022-01318]
Download as PDF
3798
Federal Register / Vol. 87, No. 16 / Tuesday, January 25, 2022 / Notices
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: January 4, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022–01316 Filed 1–24–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2391–053]
khammond on DSKJM1Z7X2PROD with NOTICES
PE Hydro Generation, LLC; Notice of
Application Tendered for Filing With
the Commission and Soliciting
Additional Study Requests and
Establishing Procedural Schedule for
Relicensing and a Deadline for
Submission of Final Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Subsequent
Minor License.
b. Project No.: 2391–053.
c. Date filed: January 3, 2022.
d. Applicant: PE Hydro Generation,
LLC.
e. Name of Project: Warren
Hydroelectric Project (P–2391–053).
f. Location: The Warren Project is
located on the Shenandoah River near
the Town of Front Royal in Warren
County, Virginia. The project does not
occupy any federal land.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Ms. Jody Smet,
Vice President, Regulatory Affairs, PE
Hydro Generation, LLC, 7315 Wisconsin
Ave., Suite 1100W, Bethesda, MD
20814; Phone at (240) 482–2700 or
email at jody.smet@eaglecreekre.com.
i. FERC Contact: Jody Callihan at
(202) 502–8278, or jody.callihan@
ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
VerDate Sep<11>2014
17:19 Jan 24, 2022
Jkt 256001
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: March 4, 2022.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. All filings
must clearly identify the project name
and docket number on the first page:
Warren Project (P–2391–053).
m. The application is not ready for
environmental analysis at this time.
n. The Warren Project consists of the
following existing facilities: (1) A 15foot-high, 483-foot-long reinforced
concrete dam impounding a small
reservoir with a gross storage capacity of
900 acre-feet; (2) an 82-foot-long, 30foot-wide powerhouse adjacent to the
north end of the dam containing three
generating units with a total installed
capacity of 750 kilowatts; (3)
transmission facilities consisting of the
2.4-kilovolt (kV) project generator leads;
a 3-phase, 2.4/34.5-kV transformer; and
a 34.5-kV, 14,784-foot-long transmission
line; and (4) other appurtenances.
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
The project operates in a run-of-river
mode with a minimum flow of 56 cubic
feet per second. The project had an
average annual generation of 3,456
megawatt-hours between 2013 and
2017.
o. Copies of the application may be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document (P–2391). For assistance,
contact FERC Online Support at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or (202) 502–
8659 (TTY).
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. Procedural schedule and final
amendments: The application will be
processed according to the following
preliminary schedule. Revisions to the
schedule will be made as appropriate.
Issue Deficiency Letter (if
necessary).
Request Additional Information (if necessary).
Issue Acceptance Letter
Issue Scoping Document
1 for comments.
Issue Scoping Document
2 (if necessary).
Issue Notice of Ready for
Environmental Analysis.
March 2022.
March 2022.
May 2022.
June 2022.
August 2022.
August 2022.
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of the notice of ready for
environmental analysis.
Dated: January 18, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–01318 Filed 1–24–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2509–051]
PE Hydro Generation, LLC; Notice of
Application Tendered for Filing With
the Commission and Soliciting
Additional Study Requests and
Establishing Procedural Schedule for
Relicensing and a Deadline for
Submission of Final Amendments
Take notice that the following
hydroelectric application has been filed
E:\FR\FM\25JAN1.SGM
25JAN1
Agencies
[Federal Register Volume 87, Number 16 (Tuesday, January 25, 2022)]
[Notices]
[Page 3798]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-01318]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2391-053]
PE Hydro Generation, LLC; Notice of Application Tendered for
Filing With the Commission and Soliciting Additional Study Requests and
Establishing Procedural Schedule for Relicensing and a Deadline for
Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Subsequent Minor License.
b. Project No.: 2391-053.
c. Date filed: January 3, 2022.
d. Applicant: PE Hydro Generation, LLC.
e. Name of Project: Warren Hydroelectric Project (P-2391-053).
f. Location: The Warren Project is located on the Shenandoah River
near the Town of Front Royal in Warren County, Virginia. The project
does not occupy any federal land.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Ms. Jody Smet, Vice President, Regulatory
Affairs, PE Hydro Generation, LLC, 7315 Wisconsin Ave., Suite 1100W,
Bethesda, MD 20814; Phone at (240) 482-2700 or email at
[email protected].
i. FERC Contact: Jody Callihan at (202) 502-8278, or
[email protected].
j. Cooperating agencies: Federal, state, local, and tribal agencies
with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of the
environmental document should follow the instructions for filing such
requests described in item l below. Cooperating agencies should note
the Commission's policy that agencies that cooperate in the preparation
of the environmental document cannot also intervene. See, 94 FERC ]
61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's
regulations, if any resource agency, Indian Tribe, or person believes
that an additional scientific study should be conducted in order to
form an adequate factual basis for a complete analysis of the
application on its merit, the resource agency, Indian Tribe, or person
must file a request for a study with the Commission not later than 60
days from the date of filing of the application, and serve a copy of
the request on the applicant.
l. Deadline for filing additional study requests and requests for
cooperating agency status: March 4, 2022.
The Commission strongly encourages electronic filing. Please file
additional study requests and requests for cooperating agency status
using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support
at [email protected], (866) 208-3676 (toll free), or (202)
502-8659 (TTY). For assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, you may submit a paper copy.
Submissions sent via the U.S. Postal Service must be addressed to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington, DC 20426. Submissions sent via
any other carrier must be addressed to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville,
Maryland 20852. All filings must clearly identify the project name and
docket number on the first page: Warren Project (P-2391-053).
m. The application is not ready for environmental analysis at this
time.
n. The Warren Project consists of the following existing
facilities: (1) A 15-foot-high, 483-foot-long reinforced concrete dam
impounding a small reservoir with a gross storage capacity of 900 acre-
feet; (2) an 82-foot-long, 30-foot-wide powerhouse adjacent to the
north end of the dam containing three generating units with a total
installed capacity of 750 kilowatts; (3) transmission facilities
consisting of the 2.4-kilovolt (kV) project generator leads; a 3-phase,
2.4/34.5-kV transformer; and a 34.5-kV, 14,784-foot-long transmission
line; and (4) other appurtenances.
The project operates in a run-of-river mode with a minimum flow of
56 cubic feet per second. The project had an average annual generation
of 3,456 megawatt-hours between 2013 and 2017.
o. Copies of the application may be viewed on the Commission's
website at https://www.ferc.gov using the ``eLibrary'' link. Enter the
docket number excluding the last three digits in the docket number
field to access the document (P-2391). For assistance, contact FERC
Online Support at [email protected] or call toll-free, (866)
208-3676 or (202) 502-8659 (TTY).
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
p. Procedural schedule and final amendments: The application will
be processed according to the following preliminary schedule. Revisions
to the schedule will be made as appropriate.
------------------------------------------------------------------------
------------------------------------------------------------------------
Issue Deficiency Letter (if necessary) March 2022.
Request Additional Information (if March 2022.
necessary).
Issue Acceptance Letter............... May 2022.
Issue Scoping Document 1 for comments. June 2022.
Issue Scoping Document 2 (if August 2022.
necessary).
Issue Notice of Ready for August 2022.
Environmental Analysis.
------------------------------------------------------------------------
Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: January 18, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-01318 Filed 1-24-22; 8:45 am]
BILLING CODE 6717-01-P