Federal Register / Vol. 87, No. 16 / Tuesday, January 25, 2022 / Notices
Description: Compliance filing:
Compliance Filing re Black Start
Revisions to Tariff, Schedule 6A to be
effective 6/6/2021.
Filed Date: 1/14/22.
Accession Number: 20220114–5223.
Comment Date: 5 p.m. ET 2/4/22.
Docket Numbers: ER21–2423–003.
Applicants: Generation Bridge
Connecticut Holdings, LLC.
Description: Tariff Amendment:
Response to Deficiency Letter to be
effective 7/15/2021.
Filed Date: 1/12/22.
Accession Number: 20220112–5118.
Comment Date: 5 p.m. ET 1/24/22.
Docket Numbers: ER21–2423–003;
ER21–2424–003.
Applicants: Generation Bridge M&M
Holdings, LLC, Generation Bridge
Connecticut Holdings, LLC.
Description: Generation Bridge
Connecticut Holdings, LLC et al submit
a request for a shortened comment
period to the January 12 Response to the
December 22, 2021 deficiency letter of
no more than ten days or by January 22,
2022.
Filed Date: 1/14/22.
Accession Number: 20220114–5284.
Comment Date: 5 p.m. ET 1/24/22.
Docket Numbers: ER21–2424–003.
Applicants: Generation Bridge M&M
Holdings, LLC.
Description: Tariff Amendment:
Response to Deficiency Letter to be
effective 7/15/2021.
Filed Date: 1/12/22.
Accession Number: 20220112–5120.
Comment Date: 5 p.m. ET 1/24/22.
Docket Numbers: ER22–24–001.
Applicants: System Energy Resources,
Inc.
Description: Tariff Amendment: SERI
UPSA Pension Filing Deficiency
Response to be effective 12/1/2021.
Filed Date: 1/14/22.
Accession Number: 20220114–5227.
Comment Date: 5 p.m. ET 2/4/22.
Docket Numbers: ER22–828–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
3761R1 KEPCO NITSA NOA; 2463R2
KEPCO Cancellation; and 2451R5
KEPCO Cancellation to be effective 1/1/
2022.
Filed Date: 1/14/22.
Accession Number: 20220114–5231.
Comment Date: 5 p.m. ET 2/4/22.
Docket Numbers: ER22–829–000.
Applicants: AEP Texas Inc.
Description: § 205(d) Rate Filing:
AEPTX–LCRA TSC Crane Facilities
Development Agreement to be effective
1/5/2022.
Filed Date: 1/18/22.
VerDate Sep<11>2014
17:19 Jan 24, 2022
Jkt 256001
Accession Number: 20220118–5003.
Comment Date: 5 p.m. ET 2/8/22.
Docket Numbers: ER22–830–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to ISA, Service Agreement
No. 6108; Queue No. AE1–183 to be
effective 6/17/2021.
Filed Date: 1/18/22.
Accession Number: 20220118–5087.
Comment Date: 5 p.m. ET 2/8/22.
Docket Numbers: ER22–831–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
2824R7 KMEA & Sunflower Meter
Agent Agreement to be effective 1/1/
2022.
Filed Date: 1/18/22.
Accession Number: 20220118–5090.
Comment Date: 5 p.m. ET 2/8/22.
Docket Numbers: ER22–833–000.
Applicants: Southern California
Edison Company.
Description: Compliance filing: Order
864 ADIT Compliance Filing to be
effective 1/27/2020.
Filed Date: 1/18/22.
Accession Number: 20220118–5148.
Comment Date: 5 p.m. ET 2/8/22.
Docket Numbers: ER22–834–000.
Applicants: PacifiCorp.
Description: § 205(d) Rate Filing:
OATT Revised LGIP Sections 36, 38, 39,
42, 43, 46, 48, Attachment N & O, Tariff
to be effective 4/1/2022.
Filed Date: 1/18/22.
Accession Number: 20220118–5186.
Comment Date: 5 p.m. ET 2/8/22.
Docket Numbers: ER22–835–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original WMPA, SA No. 6310; Queue
No. AG1–086 to be effective 1/5/2022.
Filed Date: 1/18/22.
Accession Number: 20220118–5187.
Comment Date: 5 p.m. ET 2/8/22.
Docket Numbers: ER22–836–000.
Applicants: PacifiCorp.
Description: § 205(d) Rate Filing:
OATT Revised Attachment H–1
(Updates Form 1 Source References
2022) to be effective 3/20/2022.
Filed Date: 1/18/22.
Accession Number: 20220118–5202.
Comment Date: 5 p.m. ET 2/8/22.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: January 18, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–01320 Filed 1–24–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2425–057]
PE Hydro Generation, LLC; Notice of
Application Tendered for Filing With
the Commission and Soliciting
Additional Study Requests and
Establishing Procedural Schedule for
Relicensing and a Deadline for
Submission of Final Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 2425–057.
c. Date filed: January 3, 2022.
d. Applicant: PE Hydro Generation,
LLC.
e. Name of Project: Luray and
Newport Hydroelectric Project (P–2425–
057).
f. Location: The two-development
Luray and Newport Project is located on
the South Fork of the Shenandoah River
near the Towns of Luray (Luray
Development) and Newport (Newport
Development) in Page County, Virginia.
The project does not occupy any federal
land.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Ms. Jody Smet,
Vice President, Regulatory Affairs, PE
Hydro Generation, LLC, 7315 Wisconsin
Ave., Suite 1100W, Bethesda, MD
20814; Phone at (240) 482–2700 or
email at jody.smet@eaglecreekre.com.
i. FERC Contact: Jody Callihan at
(202) 502–8278, or jody.callihan@
ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
E:\FR\FM\25JAN1.SGM
25JAN1
khammond on DSKJM1Z7X2PROD with NOTICES
Federal Register / Vol. 87, No. 16 / Tuesday, January 25, 2022 / Notices
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: March 4, 2022.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. All filings
must clearly identify the project name
and docket number on the first page:
Luray and Newport Project (P–2425–
057).
m. The application is not ready for
environmental analysis at this time.
n. The Luray Development consists of:
(1) A 21.9-foot-high, 525-foot-long
reinforced concrete dam impounding a
small reservoir with a gross storage
capacity of 880 acre-feet; (2) a
powerhouse adjacent to the south end of
the dam, with three generating units
having a total installed capacity of 1,600
kilowatts (kW); (3) transmission
VerDate Sep<11>2014
18:10 Jan 24, 2022
Jkt 256001
3797
facilities consisting of the 2.4-kilovolt
(kV) project generator leads; a 3-phase,
2.4/34.5-kV transformer; and a 34.5-kV,
8,131-foot-long transmission line; and
(4) other appurtenances.
The Newport Development consists
of: (1) A 28.8-foot-high, 443-foot-long
reinforced concrete dam impounding a
small reservoir with a gross storage
capacity of 1,090 acre-feet; (2) a
powerhouse adjacent to the north end of
the dam, with three generating units
having a total installed capacity of 1,400
kW; (3) transmission facilities consisting
of the 2.4-kV project generator leads; a
3-phase, 2.4/34.5-kV transformer; and a
34.5-kV, 8,131-foot-long transmission
line; and (4) other appurtenances.
The project operates in a run-of-river
mode with minimum flows of 47 cubic
feet per second (cfs) and 40 cfs, at the
Luray and Newport Developments,
respectively. The project had an average
annual generation of 10,928 megawatthours between 2011 and 2016.
o. Copies of the application may be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document (P–2425). For assistance,
contact FERC Online Support at
FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or (202) 502–
8659 (TTY).
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. Procedural schedule and final
amendments: The application will be
processed according to the following
preliminary schedule. Revisions to the
schedule will be made as appropriate.
Dated: January 18, 2022.
Kimberly D. Bose,
Secretary.
Issue Deficiency Letter (if
necessary).
Request Additional Information (if necessary).
Issue Acceptance Letter
Issue Scoping Document
1 for comments.
Issue Scoping Document
2 (if necessary).
Issue Notice of Ready for
Environmental Analysis.
Docket Numbers: RP22–417–001.
Applicants: Tennessee Gas Pipeline
Company, L.L.C.
Description: Tariff Amendment: TGP
PCG Pooling Amendment to be effective
3/1/22.
Filed Date: 1/4/22.
Accession Number: 20220104–5001.
Comment Date: 5 p.m. ET 1/18/22.
Any person desiring to protest in any
the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system (https://
March 2022.
March 2022.
May 2022.
June 2022.
August 2022.
August 2022.
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of the notice of ready for
environmental analysis.
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
[FR Doc. 2022–01323 Filed 1–24–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Part 284 Natural
Gas Pipeline Rate filings:
Filings Instituting Proceedings
Docket Number: PR22–16–000.
Applicants: Bay Gas Storage
Company, LLC.
Description: § 284.123(g) Rate Filing:
Bay Gas Storage Housekeeping Changes
to SOC to be effective 12/31/2021.
Filed Date: 12/30/21.
Accession Number: 20211230–5207.
Comments Due: 5 p.m. ET 1/20/2022.
284.123(g) Protests Due: 5 p.m. ET 2/
28/2022.
Docket Number: PR22–17–000.
Applicants: Louisville Gas and
Electric Company.
Description: Submits tariff filing per
284.123(b),(e)/: Operating Statement
Rate Change to be effective 12/6/2021.
Filed Date: 1/3/22.
Accession Number: 20220103–5203.
Comments/Protests Due: 5 p.m. ET 1/
24/2022.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
Filings in Existing Proceedings
E:\FR\FM\25JAN1.SGM
25JAN1
Agencies
[Federal Register Volume 87, Number 16 (Tuesday, January 25, 2022)]
[Notices]
[Pages 3796-3797]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-01323]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2425-057]
PE Hydro Generation, LLC; Notice of Application Tendered for
Filing With the Commission and Soliciting Additional Study Requests and
Establishing Procedural Schedule for Relicensing and a Deadline for
Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 2425-057.
c. Date filed: January 3, 2022.
d. Applicant: PE Hydro Generation, LLC.
e. Name of Project: Luray and Newport Hydroelectric Project (P-
2425-057).
f. Location: The two-development Luray and Newport Project is
located on the South Fork of the Shenandoah River near the Towns of
Luray (Luray Development) and Newport (Newport Development) in Page
County, Virginia. The project does not occupy any federal land.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Ms. Jody Smet, Vice President, Regulatory
Affairs, PE Hydro Generation, LLC, 7315 Wisconsin Ave., Suite 1100W,
Bethesda, MD 20814; Phone at (240) 482-2700 or email at
[email protected].
i. FERC Contact: Jody Callihan at (202) 502-8278, or
[email protected].
j. Cooperating agencies: Federal, state, local, and tribal agencies
with
[[Page 3797]]
jurisdiction and/or special expertise with respect to environmental
issues that wish to cooperate in the preparation of the environmental
document should follow the instructions for filing such requests
described in item l below. Cooperating agencies should note the
Commission's policy that agencies that cooperate in the preparation of
the environmental document cannot also intervene. See, 94 FERC ] 61,076
(2001).
k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's
regulations, if any resource agency, Indian Tribe, or person believes
that an additional scientific study should be conducted in order to
form an adequate factual basis for a complete analysis of the
application on its merit, the resource agency, Indian Tribe, or person
must file a request for a study with the Commission not later than 60
days from the date of filing of the application, and serve a copy of
the request on the applicant.
l. Deadline for filing additional study requests and requests for
cooperating agency status: March 4, 2022.
The Commission strongly encourages electronic filing. Please file
additional study requests and requests for cooperating agency status
using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support
at [email protected], (866) 208-3676 (toll free), or (202)
502-8659 (TTY). For assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, you may submit a paper copy.
Submissions sent via the U.S. Postal Service must be addressed to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington, DC 20426. Submissions sent via
any other carrier must be addressed to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville,
Maryland 20852. All filings must clearly identify the project name and
docket number on the first page: Luray and Newport Project (P-2425-
057).
m. The application is not ready for environmental analysis at this
time.
n. The Luray Development consists of: (1) A 21.9-foot-high, 525-
foot-long reinforced concrete dam impounding a small reservoir with a
gross storage capacity of 880 acre-feet; (2) a powerhouse adjacent to
the south end of the dam, with three generating units having a total
installed capacity of 1,600 kilowatts (kW); (3) transmission facilities
consisting of the 2.4-kilovolt (kV) project generator leads; a 3-phase,
2.4/34.5-kV transformer; and a 34.5-kV, 8,131-foot-long transmission
line; and (4) other appurtenances.
The Newport Development consists of: (1) A 28.8-foot-high, 443-
foot-long reinforced concrete dam impounding a small reservoir with a
gross storage capacity of 1,090 acre-feet; (2) a powerhouse adjacent to
the north end of the dam, with three generating units having a total
installed capacity of 1,400 kW; (3) transmission facilities consisting
of the 2.4-kV project generator leads; a 3-phase, 2.4/34.5-kV
transformer; and a 34.5-kV, 8,131-foot-long transmission line; and (4)
other appurtenances.
The project operates in a run-of-river mode with minimum flows of
47 cubic feet per second (cfs) and 40 cfs, at the Luray and Newport
Developments, respectively. The project had an average annual
generation of 10,928 megawatt-hours between 2011 and 2016.
o. Copies of the application may be viewed on the Commission's
website at https://www.ferc.gov using the ``eLibrary'' link. Enter the
docket number excluding the last three digits in the docket number
field to access the document (P-2425). For assistance, contact FERC
Online Support at [email protected] or call toll-free, (866)
208-3676 or (202) 502-8659 (TTY).
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
p. Procedural schedule and final amendments: The application will
be processed according to the following preliminary schedule. Revisions
to the schedule will be made as appropriate.
------------------------------------------------------------------------
------------------------------------------------------------------------
Issue Deficiency Letter (if necessary) March 2022.
Request Additional Information (if March 2022.
necessary).
Issue Acceptance Letter............... May 2022.
Issue Scoping Document 1 for comments. June 2022.
Issue Scoping Document 2 (if August 2022.
necessary).
Issue Notice of Ready for August 2022.
Environmental Analysis.
------------------------------------------------------------------------
Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: January 18, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-01323 Filed 1-24-22; 8:45 am]