PE Hydro Generation, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments, 3796-3797 [2022-01323]

Download as PDF khammond on DSKJM1Z7X2PROD with NOTICES 3796 Federal Register / Vol. 87, No. 16 / Tuesday, January 25, 2022 / Notices Description: Compliance filing: Compliance Filing re Black Start Revisions to Tariff, Schedule 6A to be effective 6/6/2021. Filed Date: 1/14/22. Accession Number: 20220114–5223. Comment Date: 5 p.m. ET 2/4/22. Docket Numbers: ER21–2423–003. Applicants: Generation Bridge Connecticut Holdings, LLC. Description: Tariff Amendment: Response to Deficiency Letter to be effective 7/15/2021. Filed Date: 1/12/22. Accession Number: 20220112–5118. Comment Date: 5 p.m. ET 1/24/22. Docket Numbers: ER21–2423–003; ER21–2424–003. Applicants: Generation Bridge M&M Holdings, LLC, Generation Bridge Connecticut Holdings, LLC. Description: Generation Bridge Connecticut Holdings, LLC et al submit a request for a shortened comment period to the January 12 Response to the December 22, 2021 deficiency letter of no more than ten days or by January 22, 2022. Filed Date: 1/14/22. Accession Number: 20220114–5284. Comment Date: 5 p.m. ET 1/24/22. Docket Numbers: ER21–2424–003. Applicants: Generation Bridge M&M Holdings, LLC. Description: Tariff Amendment: Response to Deficiency Letter to be effective 7/15/2021. Filed Date: 1/12/22. Accession Number: 20220112–5120. Comment Date: 5 p.m. ET 1/24/22. Docket Numbers: ER22–24–001. Applicants: System Energy Resources, Inc. Description: Tariff Amendment: SERI UPSA Pension Filing Deficiency Response to be effective 12/1/2021. Filed Date: 1/14/22. Accession Number: 20220114–5227. Comment Date: 5 p.m. ET 2/4/22. Docket Numbers: ER22–828–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 3761R1 KEPCO NITSA NOA; 2463R2 KEPCO Cancellation; and 2451R5 KEPCO Cancellation to be effective 1/1/ 2022. Filed Date: 1/14/22. Accession Number: 20220114–5231. Comment Date: 5 p.m. ET 2/4/22. Docket Numbers: ER22–829–000. Applicants: AEP Texas Inc. Description: § 205(d) Rate Filing: AEPTX–LCRA TSC Crane Facilities Development Agreement to be effective 1/5/2022. Filed Date: 1/18/22. VerDate Sep<11>2014 17:19 Jan 24, 2022 Jkt 256001 Accession Number: 20220118–5003. Comment Date: 5 p.m. ET 2/8/22. Docket Numbers: ER22–830–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Amendment to ISA, Service Agreement No. 6108; Queue No. AE1–183 to be effective 6/17/2021. Filed Date: 1/18/22. Accession Number: 20220118–5087. Comment Date: 5 p.m. ET 2/8/22. Docket Numbers: ER22–831–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 2824R7 KMEA & Sunflower Meter Agent Agreement to be effective 1/1/ 2022. Filed Date: 1/18/22. Accession Number: 20220118–5090. Comment Date: 5 p.m. ET 2/8/22. Docket Numbers: ER22–833–000. Applicants: Southern California Edison Company. Description: Compliance filing: Order 864 ADIT Compliance Filing to be effective 1/27/2020. Filed Date: 1/18/22. Accession Number: 20220118–5148. Comment Date: 5 p.m. ET 2/8/22. Docket Numbers: ER22–834–000. Applicants: PacifiCorp. Description: § 205(d) Rate Filing: OATT Revised LGIP Sections 36, 38, 39, 42, 43, 46, 48, Attachment N & O, Tariff to be effective 4/1/2022. Filed Date: 1/18/22. Accession Number: 20220118–5186. Comment Date: 5 p.m. ET 2/8/22. Docket Numbers: ER22–835–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original WMPA, SA No. 6310; Queue No. AG1–086 to be effective 1/5/2022. Filed Date: 1/18/22. Accession Number: 20220118–5187. Comment Date: 5 p.m. ET 2/8/22. Docket Numbers: ER22–836–000. Applicants: PacifiCorp. Description: § 205(d) Rate Filing: OATT Revised Attachment H–1 (Updates Form 1 Source References 2022) to be effective 3/20/2022. Filed Date: 1/18/22. Accession Number: 20220118–5202. Comment Date: 5 p.m. ET 2/8/22. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s PO 00000 Frm 00043 Fmt 4703 Sfmt 4703 Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: January 18, 2022. Kimberly D. Bose, Secretary. [FR Doc. 2022–01320 Filed 1–24–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2425–057] PE Hydro Generation, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: New Major License. b. Project No.: 2425–057. c. Date filed: January 3, 2022. d. Applicant: PE Hydro Generation, LLC. e. Name of Project: Luray and Newport Hydroelectric Project (P–2425– 057). f. Location: The two-development Luray and Newport Project is located on the South Fork of the Shenandoah River near the Towns of Luray (Luray Development) and Newport (Newport Development) in Page County, Virginia. The project does not occupy any federal land. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Ms. Jody Smet, Vice President, Regulatory Affairs, PE Hydro Generation, LLC, 7315 Wisconsin Ave., Suite 1100W, Bethesda, MD 20814; Phone at (240) 482–2700 or email at jody.smet@eaglecreekre.com. i. FERC Contact: Jody Callihan at (202) 502–8278, or jody.callihan@ ferc.gov. j. Cooperating agencies: Federal, state, local, and tribal agencies with E:\FR\FM\25JAN1.SGM 25JAN1 khammond on DSKJM1Z7X2PROD with NOTICES Federal Register / Vol. 87, No. 16 / Tuesday, January 25, 2022 / Notices jurisdiction and/or special expertise with respect to environmental issues that wish to cooperate in the preparation of the environmental document should follow the instructions for filing such requests described in item l below. Cooperating agencies should note the Commission’s policy that agencies that cooperate in the preparation of the environmental document cannot also intervene. See, 94 FERC ¶ 61,076 (2001). k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission’s regulations, if any resource agency, Indian Tribe, or person believes that an additional scientific study should be conducted in order to form an adequate factual basis for a complete analysis of the application on its merit, the resource agency, Indian Tribe, or person must file a request for a study with the Commission not later than 60 days from the date of filing of the application, and serve a copy of the request on the applicant. l. Deadline for filing additional study requests and requests for cooperating agency status: March 4, 2022. The Commission strongly encourages electronic filing. Please file additional study requests and requests for cooperating agency status using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. All filings must clearly identify the project name and docket number on the first page: Luray and Newport Project (P–2425– 057). m. The application is not ready for environmental analysis at this time. n. The Luray Development consists of: (1) A 21.9-foot-high, 525-foot-long reinforced concrete dam impounding a small reservoir with a gross storage capacity of 880 acre-feet; (2) a powerhouse adjacent to the south end of the dam, with three generating units having a total installed capacity of 1,600 kilowatts (kW); (3) transmission VerDate Sep<11>2014 18:10 Jan 24, 2022 Jkt 256001 3797 facilities consisting of the 2.4-kilovolt (kV) project generator leads; a 3-phase, 2.4/34.5-kV transformer; and a 34.5-kV, 8,131-foot-long transmission line; and (4) other appurtenances. The Newport Development consists of: (1) A 28.8-foot-high, 443-foot-long reinforced concrete dam impounding a small reservoir with a gross storage capacity of 1,090 acre-feet; (2) a powerhouse adjacent to the north end of the dam, with three generating units having a total installed capacity of 1,400 kW; (3) transmission facilities consisting of the 2.4-kV project generator leads; a 3-phase, 2.4/34.5-kV transformer; and a 34.5-kV, 8,131-foot-long transmission line; and (4) other appurtenances. The project operates in a run-of-river mode with minimum flows of 47 cubic feet per second (cfs) and 40 cfs, at the Luray and Newport Developments, respectively. The project had an average annual generation of 10,928 megawatthours between 2011 and 2016. o. Copies of the application may be viewed on the Commission’s website at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document (P–2425). For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208–3676 or (202) 502– 8659 (TTY). You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. p. Procedural schedule and final amendments: The application will be processed according to the following preliminary schedule. Revisions to the schedule will be made as appropriate. Dated: January 18, 2022. Kimberly D. Bose, Secretary. Issue Deficiency Letter (if necessary). Request Additional Information (if necessary). Issue Acceptance Letter Issue Scoping Document 1 for comments. Issue Scoping Document 2 (if necessary). Issue Notice of Ready for Environmental Analysis. Docket Numbers: RP22–417–001. Applicants: Tennessee Gas Pipeline Company, L.L.C. Description: Tariff Amendment: TGP PCG Pooling Amendment to be effective 3/1/22. Filed Date: 1/4/22. Accession Number: 20220104–5001. Comment Date: 5 p.m. ET 1/18/22. Any person desiring to protest in any the above proceedings must file in accordance with Rule 211 of the Commission’s Regulations (18 CFR 385.211) on or before 5:00 p.m. Eastern time on the specified comment date. The filings are accessible in the Commission’s eLibrary system (https:// March 2022. March 2022. May 2022. June 2022. August 2022. August 2022. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis. PO 00000 Frm 00044 Fmt 4703 Sfmt 4703 [FR Doc. 2022–01323 Filed 1–24–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Part 284 Natural Gas Pipeline Rate filings: Filings Instituting Proceedings Docket Number: PR22–16–000. Applicants: Bay Gas Storage Company, LLC. Description: § 284.123(g) Rate Filing: Bay Gas Storage Housekeeping Changes to SOC to be effective 12/31/2021. Filed Date: 12/30/21. Accession Number: 20211230–5207. Comments Due: 5 p.m. ET 1/20/2022. 284.123(g) Protests Due: 5 p.m. ET 2/ 28/2022. Docket Number: PR22–17–000. Applicants: Louisville Gas and Electric Company. Description: Submits tariff filing per 284.123(b),(e)/: Operating Statement Rate Change to be effective 12/6/2021. Filed Date: 1/3/22. Accession Number: 20220103–5203. Comments/Protests Due: 5 p.m. ET 1/ 24/2022. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. Filings in Existing Proceedings E:\FR\FM\25JAN1.SGM 25JAN1

Agencies

[Federal Register Volume 87, Number 16 (Tuesday, January 25, 2022)]
[Notices]
[Pages 3796-3797]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-01323]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2425-057]


PE Hydro Generation, LLC; Notice of Application Tendered for 
Filing With the Commission and Soliciting Additional Study Requests and 
Establishing Procedural Schedule for Relicensing and a Deadline for 
Submission of Final Amendments

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: New Major License.
    b. Project No.: 2425-057.
    c. Date filed: January 3, 2022.
    d. Applicant: PE Hydro Generation, LLC.
    e. Name of Project: Luray and Newport Hydroelectric Project (P-
2425-057).
    f. Location: The two-development Luray and Newport Project is 
located on the South Fork of the Shenandoah River near the Towns of 
Luray (Luray Development) and Newport (Newport Development) in Page 
County, Virginia. The project does not occupy any federal land.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Ms. Jody Smet, Vice President, Regulatory 
Affairs, PE Hydro Generation, LLC, 7315 Wisconsin Ave., Suite 1100W, 
Bethesda, MD 20814; Phone at (240) 482-2700 or email at 
[email protected].
    i. FERC Contact: Jody Callihan at (202) 502-8278, or 
[email protected].
    j. Cooperating agencies: Federal, state, local, and tribal agencies 
with

[[Page 3797]]

jurisdiction and/or special expertise with respect to environmental 
issues that wish to cooperate in the preparation of the environmental 
document should follow the instructions for filing such requests 
described in item l below. Cooperating agencies should note the 
Commission's policy that agencies that cooperate in the preparation of 
the environmental document cannot also intervene. See, 94 FERC ] 61,076 
(2001).
    k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's 
regulations, if any resource agency, Indian Tribe, or person believes 
that an additional scientific study should be conducted in order to 
form an adequate factual basis for a complete analysis of the 
application on its merit, the resource agency, Indian Tribe, or person 
must file a request for a study with the Commission not later than 60 
days from the date of filing of the application, and serve a copy of 
the request on the applicant.
    l. Deadline for filing additional study requests and requests for 
cooperating agency status: March 4, 2022.
    The Commission strongly encourages electronic filing. Please file 
additional study requests and requests for cooperating agency status 
using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support 
at [email protected], (866) 208-3676 (toll free), or (202) 
502-8659 (TTY). For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, you may submit a paper copy. 
Submissions sent via the U.S. Postal Service must be addressed to: 
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 
First Street NE, Room 1A, Washington, DC 20426. Submissions sent via 
any other carrier must be addressed to: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, 
Maryland 20852. All filings must clearly identify the project name and 
docket number on the first page: Luray and Newport Project (P-2425-
057).
    m. The application is not ready for environmental analysis at this 
time.
    n. The Luray Development consists of: (1) A 21.9-foot-high, 525-
foot-long reinforced concrete dam impounding a small reservoir with a 
gross storage capacity of 880 acre-feet; (2) a powerhouse adjacent to 
the south end of the dam, with three generating units having a total 
installed capacity of 1,600 kilowatts (kW); (3) transmission facilities 
consisting of the 2.4-kilovolt (kV) project generator leads; a 3-phase, 
2.4/34.5-kV transformer; and a 34.5-kV, 8,131-foot-long transmission 
line; and (4) other appurtenances.
    The Newport Development consists of: (1) A 28.8-foot-high, 443-
foot-long reinforced concrete dam impounding a small reservoir with a 
gross storage capacity of 1,090 acre-feet; (2) a powerhouse adjacent to 
the north end of the dam, with three generating units having a total 
installed capacity of 1,400 kW; (3) transmission facilities consisting 
of the 2.4-kV project generator leads; a 3-phase, 2.4/34.5-kV 
transformer; and a 34.5-kV, 8,131-foot-long transmission line; and (4) 
other appurtenances.
    The project operates in a run-of-river mode with minimum flows of 
47 cubic feet per second (cfs) and 40 cfs, at the Luray and Newport 
Developments, respectively. The project had an average annual 
generation of 10,928 megawatt-hours between 2011 and 2016.
    o. Copies of the application may be viewed on the Commission's 
website at https://www.ferc.gov using the ``eLibrary'' link. Enter the 
docket number excluding the last three digits in the docket number 
field to access the document (P-2425). For assistance, contact FERC 
Online Support at [email protected] or call toll-free, (866) 
208-3676 or (202) 502-8659 (TTY).
    You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    p. Procedural schedule and final amendments: The application will 
be processed according to the following preliminary schedule. Revisions 
to the schedule will be made as appropriate.

------------------------------------------------------------------------
 
------------------------------------------------------------------------
Issue Deficiency Letter (if necessary)  March 2022.
Request Additional Information (if      March 2022.
 necessary).
Issue Acceptance Letter...............  May 2022.
Issue Scoping Document 1 for comments.  June 2022.
Issue Scoping Document 2 (if            August 2022.
 necessary).
Issue Notice of Ready for               August 2022.
 Environmental Analysis.
------------------------------------------------------------------------

    Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of the notice 
of ready for environmental analysis.

    Dated: January 18, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-01323 Filed 1-24-22; 8:45 am]