City of Idaho Falls; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests, 1141-1142 [2022-00185]

Download as PDF khammond on DSKJM1Z7X2PROD with NOTICES Federal Register / Vol. 87, No. 6 / Monday, January 10, 2022 / Notices (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include docket number P–2662–037. Comments emailed to Commission staff are not considered part of the Commission record. k. Description of Request: On November 21, 2013, the Commission issued a new license for the Scotland Project with the boundary around the project reservoir at a contour elevation of 127 feet USGS datum. The approved boundary line is shown on the project’s current Exhibit G (project boundary) drawings. The licensee seeks Commission approval of revised Exhibit G drawings that show a modified project boundary, based on improvements to the project’s survey and property rights information. The modified boundary would remain at the 127-foot contour around the reservoir; however, the more accurate boundary line would enclose either more or less lands in certain areas to better follow the contour. The licensee also proposes boundary revisions near the dam and powerhouse to ensure all project facilities (e.g., fish passage, access road, switchyard, etc.) are fully enclosed within the boundary. The revised exhibit drawings do not modify the licensee’s property rights under the project license. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, it must also serve a copy of the document on that resource agency. l. Locations of the Application: The Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s website at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket number (i.e., P–2662–037) in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via VerDate Sep<11>2014 18:16 Jan 07, 2022 Jkt 256001 email of new filings and issuances related to this or other pending projects. Copies of the filing can be obtained directly from the applicant. For assistance, call toll-free 1–866–208– 3676 or email FERCOnlineSupport@ ferc.gov. For TTY, call (202) 502–8659. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214, respectively. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person commenting, protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. Any filing made by an intervenor must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010. Dated: January 4, 2022. Kimberly D. Bose, Secretary. [FR Doc. 2022–00186 Filed 1–7–22; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 1141 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2842–044] City of Idaho Falls; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Application for Non-Project Use of Project Lands and Waters. b. Project No: 2842–044. c. Date Filed: September 23, 2021 and supplemented on October 18, 2021 and December 27, 2021. d. Applicant: City of Idaho Falls, Idaho (licensee). e. Name of Project: Idaho Falls Hydroelectric Project. f. Location: The project is located on the Snake River in Bonneville County, Idaho. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Jason Cooper, Physical Engineer; Idaho Falls Power; P.O. Box 50220; 140 South Capital; Idaho Falls, Idaho 83405–0220; Phone: (208) 612–8573. i. FERC Contact: Alicia Burtner, (202) 502–8038, Alicia.Burtner@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests: February 4, 2022. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first E:\FR\FM\10JAN1.SGM 10JAN1 khammond on DSKJM1Z7X2PROD with NOTICES 1142 Federal Register / Vol. 87, No. 6 / Monday, January 10, 2022 / Notices page of any filing should include the docket number P–2842–044. Comments emailed to Commission staff are not considered part of the Commission record. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Description of Request: The licensee requests approval of a nonproject use of project lands and waters in support of a public park to be located adjacent to and partially on project lands. The licensee proposes a water withdrawal of 2.27 cubic feet per second (cfs) to be taken from the right bank of the Snake River, upstream of the Lower Development weir. The request includes provisions to construction an intake structure and a series of pipes leading to a constructed, educational stream and pond in the public park. Approximately 0.27 cfs of the diverted water would be used for irrigation in the park, and the remaining 2 cfs would be returned to the Snake River downstream of the Lower Development weir. This would be the first water withdrawal at the project, and it would not require any alterations of current project operations. l. Locations of the Application: This filing may be viewed on the Commission’s website at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. Agencies may obtain copies of the application directly from the applicant. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. VerDate Sep<11>2014 18:16 Jan 07, 2022 Jkt 256001 n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214, respectively. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person commenting, protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. Any filing made by an intervenor must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010. [Docket No. NJ22–6–000] Commission in determining the appropriate action to be taken but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically may mail similar pleadings to the Federal Energy Regulatory Commission, 888 First Street, NE, Washington, DC 20426. Hand delivered submissions in docketed proceedings should be delivered to Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland 20852. Comment Date: 5:00 p.m. Eastern Time on January 18, 2022. City of Azusa, California; Notice of Filing Dated: January 4, 2022. Debbie-Anne A. Reese, Deputy Secretary. Dated: January 4, 2022. Kimberly D. Bose, Secretary. [FR Doc. 2022–00185 Filed 1–7–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Take notice that on December 23, 2021, City of Azusa, California submitted its tariff filing: 2022 Transmission Revenue Balancing Account Adjustment/Existing Transmission Contracts update, to be effective January 1, 2022. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 [FR Doc. 2022–00191 Filed 1–7–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #2 Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: E:\FR\FM\10JAN1.SGM 10JAN1

Agencies

[Federal Register Volume 87, Number 6 (Monday, January 10, 2022)]
[Notices]
[Pages 1141-1142]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-00185]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2842-044]


City of Idaho Falls; Notice of Application Accepted for Filing 
and Soliciting Comments, Motions To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Application Type: Application for Non-Project Use of Project 
Lands and Waters.
    b. Project No: 2842-044.
    c. Date Filed: September 23, 2021 and supplemented on October 18, 
2021 and December 27, 2021.
    d. Applicant: City of Idaho Falls, Idaho (licensee).
    e. Name of Project: Idaho Falls Hydroelectric Project.
    f. Location: The project is located on the Snake River in 
Bonneville County, Idaho.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: Jason Cooper, Physical Engineer; Idaho Falls 
Power; P.O. Box 50220; 140 South Capital; Idaho Falls, Idaho 83405-
0220; Phone: (208) 612-8573.
    i. FERC Contact: Alicia Burtner, (202) 502-8038, 
[email protected].
    j. Deadline for filing comments, motions to intervene, and 
protests: February 4, 2022.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, and protests using the Commission's 
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. 
Commenters can submit brief comments up to 6,000 characters, without 
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact 
information at the end of your comments. For assistance, please contact 
FERC Online Support at [email protected], (866) 208-3676 (toll 
free), or (202) 502-8659 (TTY). In lieu of electronic filing, you may 
submit a paper copy. Submissions sent via the U.S. Postal Service must 
be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory 
Commission, 888 First Street NE, Room 1A, Washington, DC 20426. 
Submissions sent via any other carrier must be addressed to: Kimberly 
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins 
Avenue, Rockville, Maryland 20852. The first

[[Page 1142]]

page of any filing should include the docket number P-2842-044. 
Comments emailed to Commission staff are not considered part of the 
Commission record.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person whose name appears on the official service 
list for the project. Further, if an intervenor files comments or 
documents with the Commission relating to the merits of an issue that 
may affect the responsibilities of a particular resource agency, they 
must also serve a copy of the document on that resource agency.
    k. Description of Request: The licensee requests approval of a non-
project use of project lands and waters in support of a public park to 
be located adjacent to and partially on project lands. The licensee 
proposes a water withdrawal of 2.27 cubic feet per second (cfs) to be 
taken from the right bank of the Snake River, upstream of the Lower 
Development weir. The request includes provisions to construction an 
intake structure and a series of pipes leading to a constructed, 
educational stream and pond in the public park. Approximately 0.27 cfs 
of the diverted water would be used for irrigation in the park, and the 
remaining 2 cfs would be returned to the Snake River downstream of the 
Lower Development weir. This would be the first water withdrawal at the 
project, and it would not require any alterations of current project 
operations.
    l. Locations of the Application: This filing may be viewed on the 
Commission's website at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. You may also register 
online at https://www.ferc.gov/docs-filing/esubscription.asp to be 
notified via email of new filings and issuances related to this or 
other pending projects. At this time, the Commission has suspended 
access to the Commission's Public Reference Room, due to the 
proclamation declaring a National Emergency concerning the Novel 
Coronavirus Disease (COVID-19), issued by the President on March 13, 
2020. For assistance, call 1-866-208-3676 or email 
[email protected], for TTY, call (202) 502-8659. Agencies may 
obtain copies of the application directly from the applicant.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214, respectively. In determining the appropriate action to take, the 
Commission will consider all protests or other comments filed, but only 
those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any comments, 
protests, or motions to intervene must be received on or before the 
specified comment date for the particular application.
    o. Filing and Service of Documents: Any filing must (1) bear in all 
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO 
INTERVENE'' as applicable; (2) set forth in the heading the name of the 
applicant and the project number of the application to which the filing 
responds; (3) furnish the name, address, and telephone number of the 
person commenting, protesting or intervening; and (4) otherwise comply 
with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis. Any filing made by an intervenor must be accompanied 
by proof of service on all persons listed in the service list prepared 
by the Commission in this proceeding, in accordance with 18 CFR 
385.2010.

    Dated: January 4, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-00185 Filed 1-7-22; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.