Results 751 - 800 of 6,916
Sorted by Date | Sort by Relevance
Notice of Availability of Guidance and Application for Hydroelectric Incentive Program
.gpo.gov]
[FR Doc No: 2021-27915]
DEPARTMENT OF ENERGY
Notice of Availability of Guidance and Application for
Hydroelectric Incentive Program
AGENCY: Water Power Technologies Office, Office of Energy Efficiency
and Renewable Energy, Department of Energy
City of Pelican, Pelican Utility District; Notice of Intent To File License Application, Filing of Pre-Application Document, Approving Use of the Traditional Licensing Process
,
2021 (Pre-Application Document and Request to Use the TLP).
d. Submitted By: City of Pelican, Pelican Utility District.
e. Name of Project: Pelican Hydroelectric Project.
f. Location: On the Pelican Creek in the City of Pelican, Alaska
York Haven Power Company, LLC; Notice of Availability of Environmental Assessment
Act of 1969
and the Federal Energy Regulatory Commission's (Commission)
regulations, 18 CFR part 380, the Office of Energy Projects has
reviewed the application for a temporary variance from flow
requirements for the York Haven Hydroelectric
Sabine River Authority-LA & TX; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Non-capacity amendment of license for project
boundary administration.
b
Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene; City of Beaverton, Oregon
). The proposed Sexton Mountain Pump Station
Hydroelectric Project would have an installed capacity of up to 200
kilowatts (kW), and would be located along an existing 30-inch pipeline
adjacent to the Sexton Mountain Pumping Station in the City of
Beaverton
Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications; Lewis Ridge Pumped Storage, LLC
to perform any
land-disturbing activities or otherwise enter upon lands or waters
owned by others without the owners' express permission.
The proposed Lewis Ridge Pumped Storage Hydroelectric Project would
consist of the following: (1) A 5,700-foot
Let It Go, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests
that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Exemption from Licensing.
b. Project No.: 15038-001.
c. Date Filed: December 9, 2021.
d. Applicant: Let
Ada County, Idaho Fulcrum LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments
Requests and
Establishing Procedural Schedule for Relicensing and a Deadline for
Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection
Brookfield White Pine Hydro, LLC; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Non-project use of project lands and waters.
b. Project No: 2284-048.
c. Date Filed
AEP Generation Resources Inc.; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments
for
Licensing and Deadline for Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project
South Sutter Water District; Notice of Application for Approval of Contract for the Sale of Power Under Section 22 of the Federal Power Act
of the Federal Power
Act
Take notice that on December 3, 2021, South Sutter Water District
(SSWD), filed with the Commission an application for approval of a
contract for the sale of power from its licensed Camp Far West
Hydroelectric Project No. 2997
Green Mountain Power Corporation; Notice Soliciting Scoping Comments
.gpo.gov]
[FR Doc No: 2021-27067]
[[Page 71262]]
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 5261-023]
Green Mountain Power Corporation; Notice Soliciting Scoping
Comments
Take notice that the following hydroelectric
Northern States Power Company-Wisconsin; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments
Requests and Establishing Procedural Schedule for Relicensing and a
Deadline for Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection
Otter Tail Power Company; Notice of Authorization for Continued Project Operation
, licensee for the
Otter Tail River Hydroelectric Project No. 10853, filed an Application
for a New Major License for Otter Tail River Hydroelectric Project
pursuant to the Federal Power Act (FPA) and the Commission's
regulations thereunder. The Otter
Pacific Gas and Electric Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Application for Temporary Variance of Minimum
Flow Requirement.
b. Project No: 1988
Algonquin Northern Maine Generating Company; Notice of Authorization for Continued Project Operation
Northern Maine Generating Company,
licensee for the Scopan Hydroelectric Project No. 2368, filed an
application for a Subsequent License pursuant to the Federal Power Act
(FPA) and the Commission's regulations thereunder. The Scopan
Hydroelectric
North Hartland, LLC; Notice of Authorization for Continued Project Operation
for the North
Hartland Hydroelectric Project No. 2816, filed an Application for a New
Major License pursuant to the Federal Power Act (FPA) and the
Commission's regulations thereunder. The North Hartland Hydroelectric
Project is located on the Ottauquechee
Catalyzing Clean Energy Industries and Jobs Through Federal Sustainability
no carbon emissions, including marine energy, solar,
wind, hydrokinetic (including tidal, wave, current, and
thermal), geothermal, hydroelectric, nuclear, renewably
sourced hydrogen, and electrical energy
Alabama Power Company; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments
and Deadline for Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 2628
Northwestern Corporation; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Temporary Variance of Article 403.
b. Project No: 2188-259.
c. Date Filed: November 9, 2021
Winooski Hydroelectric Company, Vermont; Notice Soliciting Scoping Comments
.gpo.gov]
[FR Doc No: 2021-26904]
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 6470-008]
Winooski Hydroelectric Company, Vermont; Notice Soliciting
Scoping Comments
Take notice that the following hydroelectric application
Wiscons8, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, Approving Use of the Traditional Licensing Process
.
e. Name of Project: Weyauwega Hydroelectric Project.
f. Location: On the Waupaca River in Waupaca County, Wisconsin. No
federal lands are occupied by the project works or located within the
project boundary.
g. Filed Pursuant to: 18 CFR 5
Pacific Gas & Electric Company; Notice of Availability of Supplemental Environmental Assessment
), to supplement its Final Environmental Impact Statement (Final
EIS), issued August 16, 2011. On March 13, 2009, Pacific Gas & Electric
Company (PG&E), filed with the Commission its application to surrender
its license for the Kilarc-Cow Hydroelectric Project
City of Abbeville; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Application for Temporary Variance and
Approval of Reservoir Drawdown Plan.
b. Project No.: 11286-026.
c
Erie Boulevard Hydropower, L.P.; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Application for Non-Capacity Amendment of
License.
b. Project No: 5984-071.
c. Date
Ampersand Kayuta Falls Hydro, LLC; Notice of Existing Licensee's Failure To File a Timely Notice of Intent To File a Subsequent License Application, and Soliciting Notices of Intent To File a License Application and Pre-Application Documents
Application, and Soliciting Notices of Intent To File a License
Application and Pre-Application Documents
The current license for Kayuta Lake Hydroelectric Project No. 5000
(Kayuta Lake Project) was issued to the original licensee, Lawrence R.
Taft
The Village of Argyle, Wisconsin; Notice of Application for Surrender of Exemption, Soliciting Comments, Motions To Intervene, and Protests
, and
Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Application for surrender of exemption.
b. Project No: P-2970-004.
c. Date
Brookfield White Pine Hydro, LLC; Merimil Limited Partnership; Hydro-Kennebec, LLC; Notice of Intent To Prepare an Environmental Impact Statement for The Proposed Project Relicense, Interim Species Protection Plan, and Final Species Protection Plan, Request for Comments on Environmental Issues, Schedule for Environmental Review, and Soliciting Scoping Comments
Review,
and Soliciting Scoping Comments
On January 31, 2020, Brookfield White Pine Hydro, LLC filed an
application for a new license to continue to operate and maintain the
8.65-megawatt (MW) Shawmut Hydroelectric Project No. 2322 (Shawmut
Reactive Power Capability Compensation
The Federal Energy Regulatory Commission (Commission) is inviting comments on reactive power capability compensation and market design.
Southern California Edison Company; Notice of Intent To File License Application, Filing of Pre Application Document (Pad), Commencement of Pre Filing Process, and Scoping; Request for Comments on the Pad and Scoping Document, and Identification of Issues and Associated Study Requests
Pre-filing Process.
b. Project No.: 2290-122.
c. Dated Filed: September 22, 2021.
d. Submitted By: Southern California Edison Company (SCE).
e. Name of Project: Kern River No. 3 Hydroelectric Project (Kern 3
Project).
f. Location
Pike Island Hydropower Corporation, Pike Island Hydropower Project, LLC; Notice of Competing Preliminary Permit Applications Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications
Island Hydropower Corporation's Pike Island Locks and Dam
Hydroelectric Project (Project No. 15230-000) would consist of: (1)
160-foot-wide by 100 to 200-foot-long intake section containing
trashracks; (2) a new 160-foot-wide by 160-foot-long concrete
New England Hydropower Company, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments
Requests and Establishing Procedural Schedule for Relicensing and a
Deadline for Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection
Green Mountain Power Corporation; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests
notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Subsequent Minor License.
b. Project No.: 5261-023.
c. Date filed: August 27, 2021.
d
ECOsponsible, LLC; Notice of Termination of License (Major Project) by Implied Surrender and Soliciting Comments, Protests, and Motions To Intervene
To Intervene
Take notice that the following hydroelectric proceeding has been
initiated by the Commission:
a. Application Type: Termination of License by Implied Surrender.
b. Project No: 9709-070.
c. Date Initiated: November 8, 2021.
d
Town of Rollinsford, New Hampshire; Notice of Technical Meeting
Hampshire's (Town) Rollinsford Hydroelectric Project No. 3777
(project). On October 19, 2021, the U.S. Fish and Wildlife Service
(FWS) requested a meeting to discuss its recommendations to protect the
federally threatened northern long-eared bat (NLEB
Nevada Irrigation District; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Application for Temporary Variance of Maximum
Pulse Flow Requirement.
b. Project No: 2266
STS Hydropower, LLC; Sugarloaf Hydro, LLC; Notice of Application for Transfer of License and Soliciting Comments, Motions To Intervene, and Protests
To Intervene,
and Protests
On October 12, 2021, STS Hydropower, LLC (transferor) and Sugarloaf
Hydro, LLC (transferee) filed jointly an application for the transfer
of license of the Sugarloaf Hydroelectric Project No. 3819. The project
is located
Idaho Power Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Amendment of License.
b. Project No: P-1971-134.
c. Date Filed: October 8, 2021.
d
Woodland Pulp, LLC; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Request to Amend Article 404, Operational and
Compliance Monitoring Plan, and Impoundment Operation Consultation
Plan
Sabine River Authority of Texas; Sabine River Authority, State of Louisiana; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests
and
Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Non-capacity amendment of license.
b
Empire District Electric Company; Notice of Material Amendment of License Application, Soliciting Comments and Associated Study Requests, and Establishing The Deadline for Submission of Final Amendments
operating the
Ozark Beach Hydroelectric Project No. 2221 (Ozark Beach Project)
located on the White River in Taney County, Missouri. On March 10,
2020, the Commission issued a Notice of Application Tendered for Filing
with the Commission and Establishing
Upper Peninsula Power Company; Notice of Application for Amendment of License, Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Federal Energy Regulatory Commission and is available
for public inspection:
a. Type of Proceeding: Request for temporary variances of Article
402.
b. Project
Georgia Power Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Non-Capacity Amendment of License.
b. Project No: 2354-152.
c. Date Filed: September 24, 2021, and supplemented
Algonquin Northern Maine Generating Company; Notice of Availability of Environmental Assessment
Policy Act of 1969
and the Federal Energy Regulatory Commission's (Commission)
regulations, 18 CFR part 380, the Office of Energy Projects has
reviewed the application for a subsequent license for the Scopan
Hydroelectric Project No. 2368, located
Southern California Edison Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Application for Temporary Variance of Minimum
Flow and Minimum Pool Requirements.
b
Cherokee Rivers Company, LLC; Notice of Meeting
.gpo.gov]
[FR Doc No: 2021-23659]
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14985-000]
Cherokee Rivers Company, LLC; Notice of Meeting
a. Project Name and Number: Lower Coosawattee Hydroelectric Project
P-14985
Ampersand Ogdensburg Hydro, LLC; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Extension of License Term.
b. Project No: 9821-107.
c. Date Filed: May 26, 2021.
d
Aquenergy Systems, LLC; Notice of Authorization for Continued Project Operation
for the Fries
Hydroelectric Project No.2883, filed an Application for a New Major
License pursuant to the Federal Power Act (FPA) and the Commission's
regulations thereunder. The Fries Hydroelectric Project is located on
the New River in the Town of Fries
Commission Information Collection Activities (Ferc-500 and Ferc-505); Consolidated Comment Request; Extension
Than 10 Megawatts.
Application for License for Transmission 4.70 and 4.71.......................... Yes Yes
Line Only.
Exemption of Small Conduit Hydroelectric 4.90 and 4
Warrensburg Hydropower Limited Partnership; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process
. Submitted by: Warrensburg Hydropower Limited Partnership
(Warrensburg Hydro).
e. Name of Project: Warrensburg Hydroelectric Project.
f. Location: Located on the Schroon River in the town of
Warrensburg, Warren County, New York. The project does