Northwoods Renewables, LLC, Parker & Nelson Holdings, LLC; Notice of Transfer of Exemption
Document Number: 2022-17875
Type: Notice
Date: 2022-08-19
Agency: Department of Energy, Federal Energy Regulatory Commission
, exemptee for the 105-kilowatt Ashland Papermill Hydroelectric Project No. 5638, filed a letter notifying the Commission that the project was transferred from Northwoods Renewables, LLC to Parker & Nelson Holdings, LLC. The exemption from licensing
2025 Resource Pool-Loveland Area Projects, Final Power Allocation
Document Number: 2022-17722
Type: Notice
Date: 2022-08-18
Agency: Department of Energy, Western Area Power Administration
, 2013. The final power allocations are established prior to the contractual phase of the 2025 Resource Pool process. Firm electric service contracts negotiated between WAPA and eligible allottees will permit delivery of hydroelectric power beginning
Consolidated Hydro New York, LLC; Notice of Pending Jurisdictional Inquiry and Solicting Comments, Protests, and Motions To Intervene
Document Number: 2022-17591
Type: Notice
Date: 2022-08-16
Agency: Department of Energy, Federal Energy Regulatory Commission
's review of Consolidated Hydro New York, LLC's final license application for the Victory Mills Hydroelectric Project (FERC Project No. 7153) found information stating that Winnie's Reef Dam is operated to maintain the water levels of Saratoga Lake
Mad River Power Associates; Notice of Availability of Environmental Assessment
Document Number: 2022-17589
Type: Notice
Date: 2022-08-16
Agency: Department of Energy, Federal Energy Regulatory Commission
and the Federal Energy Regulatory Commission's (Commission) regulations, 18 CFR part 380, the Office of Energy Projects has reviewed the relicense application for the Campton Hydroelectric Project No. 3253 (project), located on the Mad River in Grafton County
Revision to Power Marketing Policy Georgia-Alabama-South Carolina System of Projects
Document Number: 2022-17575
Type: Notice
Date: 2022-08-16
Agency: Department of Energy, Southeastern Power Administration
to include the following additional provisions for RECs associated with hydroelectric generation: Renewable Energy Certificates: The M-RETS Tracking System creates and tracks certificates reporting generation attributes, by generating unit, for each
Village of Enosburg Falls, Vermont; Notice of Intent To Prepare an Environmental Assessment
Document Number: 2022-17496
Type: Notice
Date: 2022-08-15
Agency: Department of Energy, Federal Energy Regulatory Commission
, Vermont (Village) filed a relicense application for the 975-kilowatt Enosburg Falls Hydroelectric Project No. 2905 (project). The project is located on the Missisquoi River in Franklin County, Vermont. The project does not occupy federal land
Eagle Creek Schoolfield Hydro, LLC, City of Danville; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments
Document Number: 2022-17367
Type: Notice
Date: 2022-08-12
Agency: Department of Energy, Federal Energy Regulatory Commission
Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments Take notice that the following hydroelectric application has been filed with the Commission and is available for public
Georgia Power Company; Notice of Intent to Prepare an Environmental Assessment
Document Number: 2022-17366
Type: Notice
Date: 2022-08-12
Agency: Department of Energy, Federal Energy Regulatory Commission
, major license for the 18-megawatt Lloyd Shoals Hydroelectric Project (Lloyd Shoals Project; FERC No. 2336). The Lloyd Shoals Project is located on the Ocmulgee River in Butts, Henry, Jasper, and Newton Counties, Georgia. The project does not occupy
Duty of Candor
Document Number: 2022-16608
Type: Proposed Rule
Date: 2022-08-12
Agency: Department of Energy, Federal Energy Regulatory Commission
(a) requires that written statements in investigations be under oath,\9\ and FPA 4(b) allows the Commission to require certain hydroelectric-related filings to be submitted under oath.\10\ The NGA allows submissions under oath in investigations,\11\ periodic
Beaver Falls Municipal Authority; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments
Document Number: 2022-17256
Type: Notice
Date: 2022-08-11
Agency: Department of Energy, Federal Energy Regulatory Commission
and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type
Solia 1 Hydroelectric, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications
Document Number: 2022-17255
Type: Notice
Date: 2022-08-11
Agency: Department of Energy, Federal Energy Regulatory Commission
.gpo.gov] [FR Doc No: 2022-17255] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 15281-000] Solia 1 Hydroelectric, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene
Great River Hydro, LLC; Notice of Settlement Agreement and Soliciting Comments
Document Number: 2022-17152
Type: Notice
Date: 2022-08-10
Agency: Department of Energy, Federal Energy Regulatory Commission
, 2022. d. Applicant: Great River Hydro, LLC (Great River). e. Name of Projects: Wilder Hydroelectric Project, Bellows Falls Hydroelectric Project, and Vernon Hydroelectric Project (collectively, projects). f. Location: The existing projects
Combined Notice of Filings #1
Document Number: 2022-17153
Type: Notice
Date: 2022-08-10
Agency: Department of Energy, Federal Energy Regulatory Commission
-1019-001; ER22-1627-001. Applicants: AM Wind Repower LLC, Powell River Energy Inc., TerraForm IWG Acquisition Holdings II, LLC, Evolugen Trading and Marketing LP, Catalyst Old River Hydroelectric Limited Partnership, Brookfield Energy Marketing US LLC
Georgia Power Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
Document Number: 2022-17128
Type: Notice
Date: 2022-08-10
Agency: Department of Energy, Federal Energy Regulatory Commission
notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Request for temporary variance of Article 401. b. Project No: 1218-050. c. Date Filed: July 27
Southern California Edison Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
Document Number: 2022-17126
Type: Notice
Date: 2022-08-10
Agency: Department of Energy, Federal Energy Regulatory Commission
Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Temporary variance of license flow requirements. b. Project No.: 298-083. [[Page 48659
Pacific Gas and Electric Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
Document Number: 2022-17127
Type: Notice
Date: 2022-08-10
Agency: Department of Energy, Federal Energy Regulatory Commission
Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Temporary variance of license requirement. b. Project No.: 2290-124. c. Date Filed
National Register of Historic Places; Notification of Pending Nominations and Related Actions
Document Number: 2022-17145
Type: Notice
Date: 2022-08-10
Agency: Department of the Interior, National Park Service
RICO Comerio Municipality Comerio Hydroelectric Development, PR167, Km. 3.9 to 6.0, Comerio vicinity, SG100008110 Loiza Municipality Roberto Clemente Walker Crash Site, PR 187 km. 6, Punta Maldonado and 1.5 nautical mi. offshore in the Atlantic
Brookfield Renewable Power Piney & Deep Creek, LLC; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
Document Number: 2022-16935
Type: Notice
Date: 2022-08-08
Agency: Department of Energy, Federal Energy Regulatory Commission
To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Non-Capacity Amendment of License and Application for Temporary
Power Authority of New York; Notice of Settlement Agreement and Soliciting Comments
Document Number: 2022-16839
Type: Notice
Date: 2022-08-05
Agency: Department of Energy, Federal Energy Regulatory Commission
(NYPA). e. Name of Project: Hinckley (Gregory B. Jarvis) Hydroelectric Project (Gregory B. Jarvis Project). f. Location: The existing project is located on West Canada Creek, a tributary to the Mohawk River, at the Hinkley Reservoir dam
Kaukauna Utilities; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments
Document Number: 2022-16713
Type: Notice
Date: 2022-08-04
Agency: Department of Energy, Federal Energy Regulatory Commission
and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type
Rye Hildebrand Hydroelectric, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications
Document Number: 2022-16594
Type: Notice
Date: 2022-08-03
Agency: Department of Energy, Federal Energy Regulatory Commission
Doc No: 2022-16594] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 15276-000] Rye Hildebrand Hydroelectric, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions
Rye Sutton Hydroelectric, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications
Document Number: 2022-16593
Type: Notice
Date: 2022-08-03
Agency: Department of Energy, Federal Energy Regulatory Commission
Doc No: 2022-16593] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 15278-000] Rye Sutton Hydroelectric, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene
Energy Stream, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments
Document Number: 2022-16592
Type: Notice
Date: 2022-08-03
Agency: Department of Energy, Federal Energy Regulatory Commission
Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection
Moretown Hydroelectric, LLC; Notice Soliciting Scoping Comments and Extending Comment Period
Document Number: 2022-16591
Type: Notice
Date: 2022-08-03
Agency: Department of Energy, Federal Energy Regulatory Commission
Doc No: 2022-16591] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 5944-024] Moretown Hydroelectric, LLC; Notice Soliciting Scoping Comments and Extending Comment Period Take notice that the following hydroelectric
Washoe Project, Stampede Division-Rate Order No. WAPA-201
Document Number: 2022-16629
Type: Notice
Date: 2022-08-03
Agency: Department of Energy, Western Area Power Administration
. The Stampede Powerplant provides the economic equivalent of project-use power to Lahontan and Marble Bluff fish facilities. When the Stampede Dam and Reservoir project was first authorized, under Public Law 84-858, on August 1, 1956, hydroelectric power
Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions; FFP Project 101, LLC
Document Number: 2022-06695
Type: Notice
Date: 2022-03-30
Agency: Department of Energy, Federal Energy Regulatory Commission
; FFP Project 101, LLC Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Original Major License. b. Project No.: 14861-002. c
Northern States Power Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
Document Number: 2022-06510
Type: Notice
Date: 2022-03-29
Agency: Department of Energy, Federal Energy Regulatory Commission
notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Request for a temporary amendment of reservoir elevation requirement. b. Project No.: 2444
Notice of Intent To Prepare an Environmental Impact Statement for the Cove-East Fork Virgin River Watershed Plan, Kane County, Utah
Document Number: 2022-06579
Type: Notice
Date: 2022-03-29
Agency: Department of Agriculture, Natural Resources Conservation Service
currently used for agricultural purposes in Washington County have also experienced a reduction in crop production. Three other objectives are included as part of the proposed action. The existing Glendale hydroelectric plant does not meet the needs
Women Owned Small Business Federal Contracting Program; Identification of Eligible Industries
Document Number: 2022-05788
Type: Notice
Date: 2022-03-18
Agency: Small Business Administration, Agencies and Commissions
................... Support Activities for Metal Mining. 213115................... Support Activities for Nonmetallic Minerals (except Fuels) Mining. 221111................... Hydroelectric Power Generation. 221112................... Fossil Fuel
Eagle Creek Reusens Hydro, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments
Document Number: 2022-05580
Type: Notice
Date: 2022-03-17
Agency: Department of Energy, Federal Energy Regulatory Commission
and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type
Appalachian Power Company; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments
Document Number: 2022-05587
Type: Notice
Date: 2022-03-17
Agency: Department of Energy, Federal Energy Regulatory Commission
and Deadline for Submission of Final Amendments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: New Major License. b. Project No.: 2466
Black Canyon Bliss, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments
Document Number: 2022-05586
Type: Notice
Date: 2022-03-17
Agency: Department of Energy, Federal Energy Regulatory Commission
and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type
Quarterly Status Report of Water Service, Repayment, and Other Water-Related Contract Actions
Document Number: 2022-05416
Type: Notice
Date: 2022-03-15
Agency: Department of the Interior, Bureau of Reclamation
-flow hydro-electric generation plant at Causey Reservoir to take advantage of winter releases. This will likely be accomplished through a supplemental O&M contract. 12. Ute Mountain Ute Tribe, Animas-La Plata Project, Colorado: Ute Mountain Ute Tribe
Appalachian Power Company; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments
Document Number: 2022-05311
Type: Notice
Date: 2022-03-14
Agency: Department of Energy, Federal Energy Regulatory Commission
and Deadline for Submission of Final Amendments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: New Major License. b. Project No.: 2514
Central Rivers Power MA, LLC; Notice of Application To Amend Terms and Conditions for Exemptions, Soliciting Comments, Motions To Intervene, and Protests
Document Number: 2022-05317
Type: Notice
Date: 2022-03-14
Agency: Department of Energy, Federal Energy Regulatory Commission
Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Proceeding: Application to amend terms and conditions
Placer County Water Agency; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests
Document Number: 2022-05175
Type: Notice
Date: 2022-03-11
Agency: Department of Energy, Federal Energy Regulatory Commission
that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Types of Application: Non-capacity amendment of license. b. Project No.: 2079-111. c. Date Filed: January 27, 2022. d
Northwestern Corporation; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
Document Number: 2022-05053
Type: Notice
Date: 2022-03-10
Agency: Department of Energy, Federal Energy Regulatory Commission
notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Application for Temporary Variance from Stream Gaging Requirements. b. Project No: 2301
City of Watervliet, New York; Notice of Authorization for Continued Project Operation
Document Number: 2022-04962
Type: Notice
Date: 2022-03-09
Agency: Department of Energy, Federal Energy Regulatory Commission
York, licensee for the Normanskill Hydroelectric Project No.2955, filed an Application for a Subsequent Minor License for the Normanskill Hydroelectric Project pursuant to the Federal Power Act (FPA) and the Commission's regulations thereunder
Empire District Electric Company; Notice of Authorization for Continued Project Operation
Document Number: 2022-04959
Type: Notice
Date: 2022-03-09
Agency: Department of Energy, Federal Energy Regulatory Commission
Company, licensee for the Ozark Beach Hydroelectric Project No. 2221, filed an Application for a New License for Ozark Beach Hydroelectric Project pursuant to the Federal Power Act (FPA) and the Commission's regulations thereunder. The Ozark Beach
Municipality of Anchorage Water & Wastewater Utility; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene
Document Number: 2022-04958
Type: Notice
Date: 2022-03-09
Agency: Department of Energy, Federal Energy Regulatory Commission
, or maintained for the generation of electric power and uses for such generation only the hydroelectric potential
City of Nashua, New Hampshire; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests
Document Number: 2022-04957
Type: Notice
Date: 2022-03-09
Agency: Department of Energy, Federal Energy Regulatory Commission
Take notice that the following hydroelectric application has been filed [[Page 13291]] with the Commission and is available for public inspection: a. Application Type: Non-capacity amendment of license. b. Project No.: 7590-016. c. Date
City of River Falls Municipal Utilities; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions
Document Number: 2022-04872
Type: Notice
Date: 2022-03-08
Agency: Department of Energy, Federal Energy Regulatory Commission
for Environmental Analysis, and Soliciting Comments, Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection
McGee Creek Authority; Notice of Application for Surrender of License, Soliciting Comments, Motions To Intervene, and Protests
Document Number: 2022-04870
Type: Notice
Date: 2022-03-08
Agency: Department of Energy, Federal Energy Regulatory Commission
that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Proceeding: Application for surrender of license. b. Project No.: 8492-016. c. Date Filed: February 18, 2022. d
Topsham Hydro Partners Limited Partnership (L.P.); Notice of Settlement Agreement and Soliciting Comments
Document Number: 2022-04684
Type: Notice
Date: 2022-03-07
Agency: Department of Energy, Federal Energy Regulatory Commission
.P.) e. Name of Project: Pejepscot Hydroelectric Project. f. Location: On the Androscoggin River in Sagadahoc, Cumberland, and Androscoggin Counties in the village of Pejepscot and the town of Topsham, Maine. The project does not affect federal
Kings River Conservation District; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests
Document Number: 2022-04769
Type: Notice
Date: 2022-03-07
Agency: Department of Energy, Federal Energy Regulatory Commission
Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Non-capacity amendment of license. b. Project No.: 2741-037. c. Date Filed: December 21
Big Wood Canal Company; Notice of Intent To File License Application, Filing of Pre-Application Document, Approving Use of the Traditional Licensing Process
Document Number: 2022-04768
Type: Notice
Date: 2022-03-07
Agency: Department of Energy, Federal Energy Regulatory Commission
Hydroelectric Project. f. Location: On the Big Wood River in the Blaine and Camas Counties, Idaho. The project occupies land within the U.S. Department of Interior, Bureau of Land Management (BLM). g. Filed Pursuant to: 18 CFR part 5 of the Commission
Erie Boulevard Hydropower, L.P.; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
Document Number: 2022-04557
Type: Notice
Date: 2022-03-04
Agency: Department of Energy, Federal Energy Regulatory Commission
that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Request for amendment of license to construct new trashrack structure at the Colton dam. b. Project No.: 2320
Topsham Hydro Partners Limited Partnership (L.P.); Notice of Settlement Agreement and Soliciting Comments
Document Number: 2022-04556
Type: Notice
Date: 2022-03-04
Agency: Department of Energy, Federal Energy Regulatory Commission
Limited Partnership (L.P.). e. Name of Project: Pejepscot Hydroelectric Project. f. Location: On the Androscoggin River in Sagadahoc, Cumberland, and Androscoggin Counties in the village of Pejepscot and the town of Topsham, Maine. The project
Lakeport Hydroelectric One, LLC; Notice Soliciting Scoping Comments
Document Number: 2022-04555
Type: Notice
Date: 2022-03-04
Agency: Department of Energy, Federal Energy Regulatory Commission
No: 2022-04555] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 6440-010] Lakeport Hydroelectric One, LLC; Notice Soliciting Scoping Comments Take notice that the following hydroelectric application has been filed
5440 Hydor, Inc.; Ampersand Brooklyn Dam Hydro, LLC; Notice of Transfer of Exemption
Document Number: 2022-04538
Type: Notice
Date: 2022-03-04
Agency: Department of Energy, Federal Energy Regulatory Commission
Dam Hydroelectric Project No. 13806, filed a letter notifying the Commission that the project was transferred from 5440 Hydro, Inc. to Ampersand Brooklyn Dam Hydro, LLC. The exemption from licensing was originally issued on August 14, 2015
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.