5440 Hydor, Inc.; Ampersand Brooklyn Dam Hydro, LLC; Notice of Transfer of Exemption, 12447 [2022-04538]
Download as PDF
lotter on DSK11XQN23PROD with NOTICES1
Federal Register / Vol. 87, No. 43 / Friday, March 4, 2022 / Notices
Filed Date: 2/25/22.
Accession Number: 20220225–5022.
Comment Date: 5 p.m. ET 3/9/22.
Docket Numbers: RP22–592–000.
Applicants: Guardian Pipeline, L.L.C.
Description: § 4(d) Rate Filing: EPCR
Semi-Annual Adjustment—Spring 2022
to be effective 4/1/2022.
Filed Date: 2/25/22.
Accession Number: 20220225–5023.
Comment Date: 5 p.m. ET 3/9/22.
Docket Numbers: RP22–593–000.
Applicants: Millennium Pipeline
Company, LLC.
Description: Compliance filing:
Annual Report on Operational
Transactions 2022 to be effective N/A.
Filed Date: 2/25/22.
Accession Number: 20220225–5027.
Comment Date: 5 p.m. ET 3/9/22.
Docket Numbers: RP22–594–000.
Applicants: Midwestern Gas
Transmission Company.
Description: § 4(d) Rate Filing: Annual
Fuel Retention Percentage Adjustment—
2022 Rate to be effective 4/1/2022.
Filed Date: 2/25/22.
Accession Number: 20220225–5028.
Comment Date: 5 p.m. ET 3/9/22.
Docket Numbers: RP22–595–000.
Applicants: Viking Gas Transmission
Company.
Description: § 4(d) Rate Filing: SemiAnnual Fuel and Loss Retention
Adjustment—Spring 2022 to be effective
4/1/2022.
Filed Date: 2/25/22.
Accession Number: 20220225–5031.
Comment Date: 5 p.m. ET 3/9/22.
Docket Numbers: RP22–596–000.
Applicants: MoGas Pipeline LLC.
Description: Compliance filing:
MoGas NAESB Compliance Filing to be
effective 6/1/2022.
Filed Date: 2/25/22.
Accession Number: 20220225–5032.
Comment Date: 5 p.m. ET 3/9/22.
Docket Numbers: RP22–597–000.
Applicants: Northwest Pipeline LLC.
Description: § 4(d) Rate Filing: 2022
Summer Fuel Filing to be effective 4/1/
2022.
Filed Date: 2/25/22.
Accession Number: 20220225–5048.
Comment Date: 5 p.m. ET 3/9/22.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
The filings are accessible in the
Commission’s eLibrary system (https://
VerDate Sep<11>2014
17:05 Mar 03, 2022
Jkt 256001
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: February 25, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022–04518 Filed 3–3–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13806–012]
5440 Hydor, Inc.; Ampersand Brooklyn
Dam Hydro, LLC; Notice of Transfer of
Exemption
1. On January 24, 2022, 5440 Hydro,
Inc., exemptee for the 600-Kilowatt
Brooklyn Dam Hydroelectric Project No.
13806, filed a letter notifying the
Commission that the project was
transferred from 5440 Hydro, Inc. to
Ampersand Brooklyn Dam Hydro, LLC.
The exemption from licensing was
originally issued on August 14, 2015.1
The project is located on the Upper
Ammonoosuc River, Coos County, New
Hampshire. The transfer of an
exemption does not require Commission
approval.
2. Ampersand Brooklyn Dam Hydro,
LLC is now the exemptee of the
Brooklyn Dam Hydroelectric Project No.
13806. All correspondence must be
forwarded to: Mr. Amit Pinjani, Asset
Manager, Ampersand Brooklyn Dam
Hydro, LLC, 717 Atlantic Avenue, Suite
1A, Boston, MA 02111, Email: amit@
ampersandenergy.com.
Dated: February 25, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–04538 Filed 3–3–22; 8:45 am]
BILLING CODE 6717–01–P
1 5440
PO 00000
Hydro, Inc., 152 FERC ¶ 62,113 (2015).
Frm 00025
Fmt 4703
Sfmt 4703
12447
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 6440–010]
Lakeport Hydroelectric One, LLC;
Notice Soliciting Scoping Comments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Subsequent
Minor License.
b. Project No.: 6440–010.
c. Date Filed: August 30, 2021.
d. Applicant: Lakeport Hydroelectric
One, LLC (Lakeport).
e. Name of Project: Lakeport
Hydroelectric Project (project).
f. Location: On the Winnipesaukee
River in Belknap County, New
Hampshire. The project does not occupy
any federal land.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)—825(r).
h. Applicant Contact: Ms. Jody Smet,
Lakeport Hydroelectric One, LLC c/o
Eagle Creek Renewable Energy, LLC,
7315 Wisconsin Avenue, Suite 1100W,
Bethesda, MD 20814; Phone at (240)
482–2700, or email at jody.smet@
eaglecreekre.com..
i. FERC Contact: Erin Kimsey at (202)
502–8621, or erin.kimsey@ferc.gov.
j. Deadline for Filing Scoping
Comments: March 26, 2022.
The Commission strongly encourages
electronic filing. Please file scoping
comments using the Commission’s
eFiling system at https://ferconline.
ferc.gov/FERCOnline.aspx. Commenters
can submit brief comments up to 6,000
characters, without prior registration,
using the eComment system at https://
ferconline.ferc.gov/
QuickComment.aspx. You must include
your name and contact information at
the end of your comments. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, you may submit a
paper copy. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, MD 20852.
All filings must clearly identify the
project name and docket number on the
first page: Lakeport Project (P–6440–
010).
E:\FR\FM\04MRN1.SGM
04MRN1
Agencies
[Federal Register Volume 87, Number 43 (Friday, March 4, 2022)]
[Notices]
[Page 12447]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-04538]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13806-012]
5440 Hydor, Inc.; Ampersand Brooklyn Dam Hydro, LLC; Notice of
Transfer of Exemption
1. On January 24, 2022, 5440 Hydro, Inc., exemptee for the 600-
Kilowatt Brooklyn Dam Hydroelectric Project No. 13806, filed a letter
notifying the Commission that the project was transferred from 5440
Hydro, Inc. to Ampersand Brooklyn Dam Hydro, LLC. The exemption from
licensing was originally issued on August 14, 2015.\1\ The project is
located on the Upper Ammonoosuc River, Coos County, New Hampshire. The
transfer of an exemption does not require Commission approval.
---------------------------------------------------------------------------
\1\ 5440 Hydro, Inc., 152 FERC ] 62,113 (2015).
---------------------------------------------------------------------------
2. Ampersand Brooklyn Dam Hydro, LLC is now the exemptee of the
Brooklyn Dam Hydroelectric Project No. 13806. All correspondence must
be forwarded to: Mr. Amit Pinjani, Asset Manager, Ampersand Brooklyn
Dam Hydro, LLC, 717 Atlantic Avenue, Suite 1A, Boston, MA 02111, Email:
[email protected].
Dated: February 25, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-04538 Filed 3-3-22; 8:45 am]
BILLING CODE 6717-01-P