Central Rivers Power MA, LLC; Notice of Application To Amend Terms and Conditions for Exemptions, Soliciting Comments, Motions To Intervene, and Protests, 14258-14259 [2022-05317]
Download as PDF
jspears on DSK121TN23PROD with NOTICES1
14258
Federal Register / Vol. 87, No. 49 / Monday, March 14, 2022 / Notices
Description: Notice of Change in
Status of Butler Ridge Wind Energy
Center, LLC, et al.
Filed Date: 3/3/22.
Accession Number: 20220303–5268.
Comment Date: 5 p.m. ET 3/24/22.
Docket Numbers: ER22–1217–000.
Applicants: Cheyenne Light, Fuel and
Power Company.
Description: § 205(d) Rate Filing:
Filing of Engineering and Procurement
Agreement to be effective 3/15/2022.
Filed Date: 3/7/22.
Accession Number: 20220307–5192.
Comment Date: 5 p.m. ET 3/28/22.
Docket Numbers: ER22–1218–000.
Applicants: Idaho Power Company.
Description: § 205(d) Rate Filing: SA
434—Black Mesa Non-Conforming LGIA
to be effective 2/23/2022.
Filed Date: 3/7/22.
Accession Number: 20220307–5196.
Comment Date: 5 p.m. ET 3/28/22.
Docket Numbers: ER22–1219–000.
Applicants: PacifiCorp.
Description: Order No. 676–J
Compliance Filing of PacifiCorp.
Filed Date: 3/2/22.
Accession Number: 20220302–5303.
Comment Date: 5 p.m. ET 3/23/22.
Docket Numbers: ER22–1220–000.
Applicants: Avista Corporation.
Description: Order No. 676–J
Compliance Filing of Avista
Corporation.
Filed Date: 3/2/22.
Accession Number: 20220302–5304.
Comment Date: 5 p.m. ET 3/23/22.
Docket Numbers: ER22–1225–000.
Applicants: Navajo Tribal Utility
Authority.
Description: Petition for Limited
Waiver of Navajo Tribal Utility
Authority.
Filed Date: 3/4/22.
Accession Number: 20220304–5296.
Comment Date: 5 p.m. ET 3/25/22.
Docket Numbers: ER22–1227–000.
Applicants: Martins Creek, LLC.
Description: § 205(d) Rate Filing:
Proposed Revisions to Reactive Service
Rate Schedule and Request for Waivers
to be effective 4/1/2022.
Filed Date: 3/8/22.
Accession Number: 20220308–5092.
Comment Date: 5 p.m. ET 3/29/22.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
VerDate Sep<11>2014
17:51 Mar 11, 2022
Jkt 256001
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 8, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022–05327 Filed 3–11–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos. 10675–021, 10676–027, 10677–
024, and 10678–026]
Central Rivers Power MA, LLC; Notice
of Application To Amend Terms and
Conditions for Exemptions, Soliciting
Comments, Motions To Intervene, and
Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Proceeding: Application to
amend terms and conditions of
exemptions.
b. Project Nos.: 10675–021, 10676–
027, 10677–024, and 10678–026.
c. Date Filed: January 7, 2022.
d. Exemptee: Central Rivers Power
MA, LLC.
e. Name of Project: Dwight
Hydroelectric Project (No. 10675), Red
Bridge Hydroelectric Project (No.
10676), Putts Bridge Hydroelectric
Project (No. 10677), and Indian Orchard
Hydroelectric Project (No. 10678).
f. Location: The projects are located
on the Chicopee River in Hampden
County, Massachusetts.
g. Filed Pursuant to: Public Utility
Regulatory Policies Act of 1978, 16
U.S.C. 2705, 2708.
h. Exemptee Contact: Curt Mooney,
Central Rivers Power, 670 N. Commerce
Street, Suite 204, Manchester, NH 03101
(603) 744–0846, cmooney@
centralriverspower.com.
i. FERC Contact: Rebecca Martin,
(202) 502–6012, Rebecca.martin@
ferc.gov.
j. Deadline for filing comments,
interventions, and protests Deadline for
filing comments, motions to intervene,
and protests: April 7, 2022.
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include docket
numbers P–10675–021, P–10676–027,
P–10677–024, and P–10678–026.
Comments emailed to Commission staff
are not considered part of the
Commission record.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: The
exemptee requests to amend its terms
and conditions for these projects. The
U.S. Fish and Wildlife Service and the
Massachusetts Division of Fish and
Wildlife have provided updated terms
and conditions for the exemptions that
modify operation of the projects.
Primarily the updated terms and
conditions stipulate operation of the
projects in a run-of-river mode, with
revised bypass flow releases.
l. Locations of the Application: This
filing may be viewed on the
Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
E:\FR\FM\14MRN1.SGM
14MRN1
Federal Register / Vol. 87, No. 49 / Monday, March 14, 2022 / Notices
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. Agencies may
obtain copies of the application directly
from the applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: March 8, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–05317 Filed 3–11–22; 8:45 am]
BILLING CODE 6717–01–P
jspears on DSK121TN23PROD with NOTICES1
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
VerDate Sep<11>2014
17:51 Mar 11, 2022
Jkt 256001
Filings Instituting Proceedings
Docket Numbers: RP22–679–000.
Applicants: Discovery Gas
Transmission LLC.
Description: § 4(d) Rate Filing:
Discovery Gas Transmission LLC
Housekeeping Tariff Filing to be
effective 4/8/2022.
Filed Date: 3/8/22.
Accession Number: 20220308–5007.
Comment Date: 5 p.m. ET 3/21/22.
Any person desiring to protest in any
the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 8, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022–05328 Filed 3–11–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2514–209]
Appalachian Power Company; Notice
of Application Tendered for Filing With
the Commission and Establishing
Procedural Schedule for Licensing and
Deadline for Submission of Final
Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 2514–209.
c. Date Filed: February 28, 2022.
d. Applicant: Appalachian Power
Company (Appalachian).
e. Name of Project: Byllesby-Buck
Hydroelectric Project (Byllesby-Buck
Project).
f. Location: The two-development
Byllesby-Buck Project is located on the
New River in Carroll County, Virginia.
The project occupies 7.23 acres of
federal land managed by the U.S. Forest
Service.
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
14259
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Elizabeth
Parcell, Process Supervisor, American
Electric Power Service Corporation, 40
Franklin Road SW, Roanoke, VA 24011;
Phone at (540) 985–2441 or email at
ebparcell@aep.com.
i. FERC Contact: Jody Callihan at
(202) 502–8278, or jody.callihan@
ferc.gov.
j. This application is not ready for
environmental analysis at this time.
k. The Byllesby-Buck Project consists
of two developments (Byllesby and
Buck); the Byllesby Development is
located 3 river miles upstream of the
Buck Development. The current license
authorizes a combined generating
capacity of 30.1 megawatts (MW);
however, the actual installed capacity is
26.1 MW, which Appalachian proposes
to increase to 29.8 MW, as described
below.
Between 2016 and 2020, the project
had an average annual generation of
92,820 megawatt-hours (MWh).
The Byllesby Development consists
of: (1) A 64-foot-high, 528-foot-long
concrete dam, sluice gate, and main
spillway section topped with four
sections of 9-foot-high flashboards, five
sections of 9-foot-high inflatable
Obermeyer crest gates, and six bays of
10-foot-high Tainter gates; (2) an
auxiliary spillway including six sections
of 9-foot-high flashboards; (3) a 239-acre
impoundment with a gross storage
capacity of 2,000 acre-feet; (4) a
powerhouse containing four turbinegenerator units with a total installed
capacity of 18.0 MW; (5) a control house
and switchyard; and (6) appurtenant
facilities.
The Buck Development consists of: (1)
A 42-foot-high, 353-foot-long concrete
dam and sluice gate; (2) a 1,005-footlong, 19-foot-high spillway section
topped with twenty sections of 9-foothigh flashboards, four sections of 9-foothigh inflatable crest gates, and six bays
of 10-foot-high Tainter gates; (3) a 66acre impoundment with a gross storage
capacity of 661 acre-feet; (4) a
powerhouse containing three turbinegenerator units with a total installed
capacity of 8.1 MW; (5) two 2-mile-long
overhead 13.2-kilovolt transmission
lines extending from the Buck
powerhouse to the Byllesby control
house; and (6) appurtenant facilities.
The Byllesby-Buck Project is currently
operated in a run-of-river (ROR) mode,
with the Byllesby impoundment
maintained between elevations of
2,078.2 feet and 2,079.2 feet National
Geodetic Vertical Datum of 1929 (NGVD
29) and the Buck impoundment
maintained between elevations of
E:\FR\FM\14MRN1.SGM
14MRN1
Agencies
[Federal Register Volume 87, Number 49 (Monday, March 14, 2022)]
[Notices]
[Pages 14258-14259]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-05317]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project Nos. 10675-021, 10676-027, 10677-024, and 10678-026]
Central Rivers Power MA, LLC; Notice of Application To Amend
Terms and Conditions for Exemptions, Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Proceeding: Application to amend terms and conditions of
exemptions.
b. Project Nos.: 10675-021, 10676-027, 10677-024, and 10678-026.
c. Date Filed: January 7, 2022.
d. Exemptee: Central Rivers Power MA, LLC.
e. Name of Project: Dwight Hydroelectric Project (No. 10675), Red
Bridge Hydroelectric Project (No. 10676), Putts Bridge Hydroelectric
Project (No. 10677), and Indian Orchard Hydroelectric Project (No.
10678).
f. Location: The projects are located on the Chicopee River in
Hampden County, Massachusetts.
g. Filed Pursuant to: Public Utility Regulatory Policies Act of
1978, 16 U.S.C. 2705, 2708.
h. Exemptee Contact: Curt Mooney, Central Rivers Power, 670 N.
Commerce Street, Suite 204, Manchester, NH 03101 (603) 744-0846,
[email protected].
i. FERC Contact: Rebecca Martin, (202) 502-6012,
[email protected].
j. Deadline for filing comments, interventions, and protests
Deadline for filing comments, motions to intervene, and protests: April
7, 2022.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, and protests using the Commission's
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments up to 6,000 characters, without
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact
information at the end of your comments. For assistance, please contact
FERC Online Support at [email protected], (866) 208-3676 (toll
free), or (202) 502-8659 (TTY). In lieu of electronic filing, you may
submit a paper copy. Submissions sent via the U.S. Postal Service must
be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier must be addressed to: Kimberly
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852. The first page of any filing should
include docket numbers P-10675-021, P-10676-027, P-10677-024, and P-
10678-026. Comments emailed to Commission staff are not considered part
of the Commission record.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency.
k. Description of Request: The exemptee requests to amend its terms
and conditions for these projects. The U.S. Fish and Wildlife Service
and the Massachusetts Division of Fish and Wildlife have provided
updated terms and conditions for the exemptions that modify operation
of the projects. Primarily the updated terms and conditions stipulate
operation of the projects in a run-of-river mode, with revised bypass
flow releases.
l. Locations of the Application: This filing may be viewed on the
Commission's website at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. You may also register
online at https://www.ferc.gov/docs-filing/esubscription.asp to be
notified via
[[Page 14259]]
email of new filings and issuances related to this or other pending
projects. For assistance, call 1-866-208-3676 or email
[email protected], for TTY, call (202) 502-8659. Agencies may
obtain copies of the application directly from the applicant.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214, respectively. In determining the appropriate action to take, the
Commission will consider all protests or other comments filed, but only
those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular application.
o. Filing and Service of Documents: Any filing must (1) bear in all
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO
INTERVENE'' as applicable; (2) set forth in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person commenting, protesting or intervening; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis. Any filing made by an intervenor must be accompanied
by proof of service on all persons listed in the service list prepared
by the Commission in this proceeding, in accordance with 18 CFR
385.2010.
Dated: March 8, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-05317 Filed 3-11-22; 8:45 am]
BILLING CODE 6717-01-P