City of River Falls Municipal Utilities; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions, 12948-12949 [2022-04872]
Download as PDF
lotter on DSK11XQN23PROD with NOTICES1
12948
Federal Register / Vol. 87, No. 45 / Tuesday, March 8, 2022 / Notices
Applicants: Tallgrass Interstate Gas
Transmission, LLC.
Description: § 4(d) Rate Filing: TIGT
2022–03–01 Fuel and L&U
Reimbursement and Power Cost Tracker
to be effective 4/1/2022.
Filed Date: 3/1/22.
Accession Number: 20220301–5203.
Comment Date: 5 p.m. ET 3/14/22.
Docket Numbers: RP22–667–000.
Applicants: Adelphia Gateway, LLC.
Description: § 4(d) Rate Filing:
Adelphia Annual Transporter’s Use and
System Balancing Adjustment Filing
March 1 to be effective 4/1/2022.
Filed Date: 3/1/22.
Accession Number: 20220301–5208.
Comment Date: 5 p.m. ET 3/14/22.
Docket Numbers: RP22–668–000.
Applicants: Enable Gas Transmission,
LLC.
Description: § 4(d) Rate Filing:
Negotiated Rate Filing—March 1, 2022
Summit to be effective 3/1/2022.
Filed Date: 3/1/22.
Accession Number: 20220301–5210.
Comment Date: 5 p.m. ET 3/14/22.
Docket Numbers: RP22–669–000.
Applicants: Transcontinental Gas
Pipe Line Company, LLC.
Description: § 4(d) Rate Filing: Annual
Electric Power Tracker Filing Effective
April 1, 2022 to be effective 4/1/2022.
Filed Date: 3/1/22.
Accession Number: 20220301–5214.
Comment Date: 5 p.m. ET 3/14/22.
Docket Numbers: RP22–670–000.
Applicants: Gulf South Pipeline
Company, LLC.
Description: § 4(d) Rate Filing: Cap
Rel Neg Rate Agmt (Osaka 46428 to
Uniper 54890) to be effective 3/1/2022.
Filed Date: 3/1/22.
Accession Number: 20220301–5252.
Comment Date: 5 p.m. ET 3/14/22.
Docket Numbers: RP22–671–000.
Applicants: KO Transmission
Company.
Description: § 4(d) Rate Filing: 2022
Transportation Retainage Adjustment to
be effective 4/1/2022.
Filed Date: 3/1/22.
Accession Number: 20220301–5259.
Comment Date: 5 p.m. ET 3/14/22.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
VerDate Sep<11>2014
17:25 Mar 07, 2022
Jkt 256001
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 2, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022–04876 Filed 3–7–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 10489–020]
City of River Falls Municipal Utilities;
Notice of Application Accepted for
Filing, Soliciting Motions To Intervene
and Protests, Ready for Environmental
Analysis, and Soliciting Comments,
Preliminary Terms and Conditions, and
Preliminary Fishway Prescriptions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Subsequent
Minor License.
b. Project No.: 10489–020.
c. Date filed: August 26, 2021.
d. Applicant: City of River Falls
Municipal Utilities (City of River Falls).
e. Name of Project: River Falls
Hydroelectric Project (River Falls
Project).
f. Location: The River Falls Project is
located on the Kinnickinnic River in the
City of River Falls in Pierce County,
Wisconsin. The project does not occupy
federal land.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Kevin
Westhuis, Utility Director of the City of
River Falls Municipal Utilities;
kwesthuis@rfcity.org (preferred contact)
or (715) 426–3442.
i. FERC Contact: Shana Wiseman at
shana.wiseman@ferc.gov or (202) 502–
8736.
j. Deadline for filing comments,
recommendations, terms and
conditions, and prescriptions: 60 days
from the issuance date of this notice;
reply comments are due 105 days from
the issuance date of this notice.
The Commission strongly encourages
electronic filing. Please file motions to
intervene, protests, comments,
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
recommendations, preliminary terms
and conditions, and preliminary
fishway prescriptions using the using
the Commission’s eFiling system at
https://ferconline.ferc.gov/FERCOnline.
aspx. Commenters can submit brief
comments up to 6,000 characters,
without prior registration, using the
eComment system at https://ferconline.
ferc.gov/QuickComment.aspx. You must
include your name and contact
information at the end of your
comments. For assistance, please
contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper request.
Submissions sent via the U.S. Postal
Service must be addressed to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include docket
number P–10849–020.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application has been accepted
for filing and is now ready for
environmental analysis.
The Council on Environmental
Quality (CEQ) issued a final rule on July
15, 2020, revising the regulations under
40 CFR parts 1500–1518 that federal
agencies use to implement NEPA (see
Update to the Regulations Implementing
the Procedural Provisions of the
National Environmental Policy Act, 85
FR 43,304). The Final Rule became
effective on and applies to any NEPA
process begun after September 14, 2020.
An agency may also apply the
regulations to ongoing activities and
environmental documents begun before
September 14, 2020, which includes the
proposed River Falls Project.
Commission staff intends to conduct its
NEPA review in accordance with CEQ’s
new regulations.
l. The River Falls Project consists of:
(1) A 140-foot-long, 32-foot-high
concrete dam; (2) an impoundment with
a surface area of 15.5 acres; (3) a 200foot-long, 6-foot-diameter penstock; (4) a
E:\FR\FM\08MRN1.SGM
08MRN1
Federal Register / Vol. 87, No. 45 / Tuesday, March 8, 2022 / Notices
powerhouse containing one generating
unit rated at 250 kilowatts; (5) a 50-footlong transmission line; and (6)
appurtenant facilities.
The River Falls Project is operated in
a run-of-river mode with an estimated
annual energy production of
approximately 1,220,000 kilowatt hours.
The City of River Falls proposes to
continue operating the project as a runof-river facility and does not propose
any new construction to the project.
m. A copy of the application can be
viewed on the Commission’s website at
https://www.ferc.gov. using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. At this time, the Commission
has suspended access to the
Commission’s Public Reference Room,
due to the proclamation declaring a
National Emergency concerning the
Novel Coronavirus Disease (COVID–19),
issued by the President on March 13,
2020. For assistance, contact FERC at
FERCOnllineSupport@ferc.gov. or call
toll-free, (886) 208–3676 or TTY, (202)
502–8659.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Anyone may submit comments, a
protest, or a motion to intervene in
accordance with the requirements of
Rules of Practice and Procedure, 18 CFR
385.210, .211, and .214. In determining
the appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
All filings must (1) bear in all capital
letters the title ‘‘PROTEST’’, ‘‘MOTION
TO INTERVENE’’, ‘‘COMMENTS,’’
‘‘REPLY COMMENTS,’’
‘‘RECOMMENDATIONS,’’
‘‘PRELIMINARY TERMS AND
CONDITIONS,’’ or ‘‘PRELIMINARY
FISHWAY PRESCRIPTIONS;’’ (2) set
forth in the heading the name of the
applicant and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
protesting or intervening; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
All comments, recommendations, terms
and conditions or prescriptions must set
forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). Agencies may obtain
copies of the application directly from
the applicant. A copy of any protest or
motion to intervene must be served
upon each representative of the
applicant specified in the particular
application. A copy of all other filings
in reference to this application must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
4.34(b) and 385.2010.
o. The license applicant must file no
later than 60 days following the date of
issuance of this notice: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification. Please note that the
certification request must comply with
40 CFR 121.5(b), including
documentation that a pre-filing meeting
request was submitted to the certifying
authority at least 30 days prior to
submitting the certification request.
Please note that the certification request
must be sent to the certifying authority
and to the Commission concurrently.
p. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of this notice.
q. Procedural schedule: The
application will be processed according
to the following schedule. Revisions to
the schedule will be made as
appropriate.
Milestone
Target date
Deadline for Filing Protest, Motion to Intervene, Comments, Recommendations, Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions.
Deadline for Filing Reply Comments ....................................................................................................................................................
Dated: March 2, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–04872 Filed 3–7–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
lotter on DSK11XQN23PROD with NOTICES1
[Docket No. AD21–15–000]
Joint Federal-State Task Force on
Electric Transmission; Notice Inviting
Post-Meeting Comments
On February 16, 2022, the Joint
Federal-State Task Force on Electric
Transmission convened for a public
meeting.
All interested persons are invited to
file post-meeting comments to address
VerDate Sep<11>2014
17:25 Mar 07, 2022
Jkt 256001
issues raised during the meeting and
identified in the Agenda issued
February 2, 2022. For reference,
questions asked by the meeting
moderator are included below.
Comments must be submitted on or
before 30 days from the date of this
Notice.
Comments may be filed electronically
via the internet.1 Instructions are
available on the Commission’s website
https://www.ferc.gov/docs-filing/
efiling.asp. For assistance, please
contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, submissions
sent via the U.S. Postal Service must be
1 See
PO 00000
18 CFR 385.2001(a)(1)(iii) (2021).
Frm 00026
Fmt 4703
12949
Sfmt 4703
May 2022.
June 2022.
addressed to: Federal Energy Regulatory
Commission, Office of the Secretary,
888 First Street NE, Washington, DC
20426. Submissions sent via any other
carrier must be addressed to: Federal
Energy Regulatory Commission, Office
of the Secretary, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
For more information about this
Notice, please contact:
Michael Cackoski (Technical
Information), Office of Energy Policy
and Innovation, (202) 502–6169,
Michael.Cackoski@ferc.gov.
Gretchen Kershaw (Legal Information),
Office of the General Counsel, (202)
502–8213, Gretchen.Kershaw@
ferc.gov.
Dated: March 2, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
E:\FR\FM\08MRN1.SGM
08MRN1
Agencies
[Federal Register Volume 87, Number 45 (Tuesday, March 8, 2022)]
[Notices]
[Pages 12948-12949]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-04872]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 10489-020]
City of River Falls Municipal Utilities; Notice of Application
Accepted for Filing, Soliciting Motions To Intervene and Protests,
Ready for Environmental Analysis, and Soliciting Comments, Preliminary
Terms and Conditions, and Preliminary Fishway Prescriptions
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Subsequent Minor License.
b. Project No.: 10489-020.
c. Date filed: August 26, 2021.
d. Applicant: City of River Falls Municipal Utilities (City of
River Falls).
e. Name of Project: River Falls Hydroelectric Project (River Falls
Project).
f. Location: The River Falls Project is located on the Kinnickinnic
River in the City of River Falls in Pierce County, Wisconsin. The
project does not occupy federal land.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Kevin Westhuis, Utility Director of the City
of River Falls Municipal Utilities; [email protected] (preferred
contact) or (715) 426-3442.
i. FERC Contact: Shana Wiseman at [email protected] or (202)
502-8736.
j. Deadline for filing comments, recommendations, terms and
conditions, and prescriptions: 60 days from the issuance date of this
notice; reply comments are due 105 days from the issuance date of this
notice.
The Commission strongly encourages electronic filing. Please file
motions to intervene, protests, comments, recommendations, preliminary
terms and conditions, and preliminary fishway prescriptions using the
using the Commission's eFiling system at https://ferconline.ferc.gov/FERCOnline.aspx. Commenters can submit brief comments up to 6,000
characters, without prior registration, using the eComment system at
https://ferconline.ferc.gov/QuickComment.aspx. You must include your
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, you may submit a paper
request. Submissions sent via the U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission,
888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent
via any other carrier must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first page of any filing should include
docket number P-10849-020.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. This application has been accepted for filing and is now ready
for environmental analysis.
The Council on Environmental Quality (CEQ) issued a final rule on
July 15, 2020, revising the regulations under 40 CFR parts 1500-1518
that federal agencies use to implement NEPA (see Update to the
Regulations Implementing the Procedural Provisions of the National
Environmental Policy Act, 85 FR 43,304). The Final Rule became
effective on and applies to any NEPA process begun after September 14,
2020. An agency may also apply the regulations to ongoing activities
and environmental documents begun before September 14, 2020, which
includes the proposed River Falls Project. Commission staff intends to
conduct its NEPA review in accordance with CEQ's new regulations.
l. The River Falls Project consists of: (1) A 140-foot-long, 32-
foot-high concrete dam; (2) an impoundment with a surface area of 15.5
acres; (3) a 200-foot-long, 6-foot-diameter penstock; (4) a
[[Page 12949]]
powerhouse containing one generating unit rated at 250 kilowatts; (5) a
50-foot-long transmission line; and (6) appurtenant facilities.
The River Falls Project is operated in a run-of-river mode with an
estimated annual energy production of approximately 1,220,000 kilowatt
hours. The City of River Falls proposes to continue operating the
project as a run-of-river facility and does not propose any new
construction to the project.
m. A copy of the application can be viewed on the Commission's
website at https://www.ferc.gov. using the ``eLibrary'' link. Enter the
docket number excluding the last three digits in the docket number
field to access the document. At this time, the Commission has
suspended access to the Commission's Public Reference Room, due to the
proclamation declaring a National Emergency concerning the Novel
Coronavirus Disease (COVID-19), issued by the President on March 13,
2020. For assistance, contact FERC at [email protected]. or
call toll-free, (886) 208-3676 or TTY, (202) 502-8659.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. Anyone may submit comments, a protest, or a motion to intervene
in accordance with the requirements of Rules of Practice and Procedure,
18 CFR 385.210, .211, and .214. In determining the appropriate action
to take, the Commission will consider all protests or other comments
filed, but only those who file a motion to intervene in accordance with
the Commission's Rules may become a party to the proceeding. Any
comments, protests, or motions to intervene must be received on or
before the specified comment date for the particular application.
All filings must (1) bear in all capital letters the title
``PROTEST'', ``MOTION TO INTERVENE'', ``COMMENTS,'' ``REPLY COMMENTS,''
``RECOMMENDATIONS,'' ``PRELIMINARY TERMS AND CONDITIONS,'' or
``PRELIMINARY FISHWAY PRESCRIPTIONS;'' (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, recommendations, terms and conditions or prescriptions must
set forth their evidentiary basis and otherwise comply with the
requirements of 18 CFR 4.34(b). Agencies may obtain copies of the
application directly from the applicant. A copy of any protest or
motion to intervene must be served upon each representative of the
applicant specified in the particular application. A copy of all other
filings in reference to this application must be accompanied by proof
of service on all persons listed in the service list prepared by the
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and
385.2010.
o. The license applicant must file no later than 60 days following
the date of issuance of this notice: (1) A copy of the water quality
certification; (2) a copy of the request for certification, including
proof of the date on which the certifying agency received the request;
or (3) evidence of waiver of water quality certification. Please note
that the certification request must comply with 40 CFR 121.5(b),
including documentation that a pre-filing meeting request was submitted
to the certifying authority at least 30 days prior to submitting the
certification request. Please note that the certification request must
be sent to the certifying authority and to the Commission concurrently.
p. Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of this notice.
q. Procedural schedule: The application will be processed according
to the following schedule. Revisions to the schedule will be made as
appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Deadline for Filing Protest, Motion to May 2022.
Intervene, Comments, Recommendations,
Preliminary Terms and Conditions, and
Preliminary Fishway Prescriptions.
Deadline for Filing Reply Comments........ June 2022.
------------------------------------------------------------------------
Dated: March 2, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-04872 Filed 3-7-22; 8:45 am]