Georgia Power Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests, 48656-48657 [2022-17128]

Download as PDF khammond on DSKJM1Z7X2PROD with NOTICES 48656 Federal Register / Vol. 87, No. 153 / Wednesday, August 10, 2022 / Notices Description: Tariff Amendment: Amendment to 3 to be effective 6/28/ 2022. Filed Date: 8/3/22. Accession Number: 20220803–5114. Comment Date: 5 p.m. ET 8/24/22. Docket Numbers: ER22–188–001; ER22–353–001; ER22–416–001; ER22– 423–001; ER22–433–001; ER22–456– 001; ER22–464–001; ER22–472–001; ER22–508–001; ER22–519–001; ER22– 521–001; ER22–523–001. Applicants: Indra Power Business TX LLC, Indra Power Business VA LLC, Indra Power Business DC LLC, Indra Power Business IL LLC, Indra Power Business DE LLC, Indra Power Business MD LLC, Indra Power Business MA LLC, Indra Power Business PA, LLC, Columbia Utilities Power Business LLC, Indra Power Business NJ, LLC, Indra Power Business MI, LLC, Indra Power Business CT, LLC. Description: Notice of Change in Status of Indra Power Business CT, LLC, et al. Filed Date: 8/2/22. Accession Number: 20220802–5176. Comment Date: 5 p.m. ET 8/23/22. Docket Numbers: ER22–2055–001. Applicants: Black Hills Colorado Electric, LLC. Description: Tariff Amendment: BHCOE Reponse to Deficency Letter to be effective 8/8/2022. Filed Date: 8/4/22. Accession Number: 20220804–5065. Comment Date: 5 p.m. ET 8/25/22. Docket Numbers: ER22–2089–001. Applicants: Alabama Power Company, Georgia Power Company, Mississippi Power Company. Description: Tariff Amendment: Alabama Power Company submits tariff filing per 35.17(b): Supplement to Origis Development (Thalmann 1 Solar & Battery) LGIA Filing to be effective 6/1/ 2022. Filed Date: 8/3/22. Accession Number: 20220803–5101. Comment Date: 5 p.m. ET 8/24/22. Docket Numbers: ER22–2090–001. Applicants: Alabama Power Company, Georgia Power Company, Mississippi Power Company. Description: Tariff Amendment: Alabama Power Company submits tariff filing per 35.17(b): Supplement to Origis Development (Thalmann 2 Solar & Battery) LGIA Filing to be effective 6/1/ 2022. Filed Date: 8/3/22. Accession Number: 20220803–5102. Comment Date: 5 p.m. ET 8/24/22. Docket Numbers: ER22–2596–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) Rate Filing: 3749R1 WAPA and NPPD VerDate Sep<11>2014 17:26 Aug 09, 2022 Jkt 256001 Interconnection Agreement to be effective 8/3/2022. Filed Date: 8/4/22. Accession Number: 20220804–5006. Comment Date: 5 p.m. ET 8/25/22. Docket Numbers: ER22–2597–000. Applicants: Consumers Energy Company. Description: Initial rate filing: Proposed Refund of ADIT per Order No. 864 to be effective 12/31/9998. Filed Date: 8/4/22. Accession Number: 20220804–5011. Comment Date: 5 p.m. ET 8/25/22. Docket Numbers: ER22–2598–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Original NSA, Service Agreement No. 6574; Queue No. AE1–101 to be effective 7/12/2022. Filed Date: 8/4/22. Accession Number: 20220804–5012. Comment Date: 5 p.m. ET 8/25/22. Docket Numbers: ER22–2599–000. Applicants: Atlantic Power and Gas LLC. Description: Notice of Cancellation of Market Based Rate Tariff of Atlantic Power and Gas LLC. Filed Date: 8/1/22. Accession Number: 20220801–5299. Comment Date: 5 p.m. ET 8/22/22. Docket Numbers: ER22–2600–000. Applicants: Arizona Public Service Company. Description: § 205(d) Rate Filing: Service Agreement No. 360, Navopache NITS Amendment No. 1 to be effective 10/5/2022. Filed Date: 8/4/22. Accession Number: 20220804–5058. Comment Date: 5 p.m. ET 8/25/22. Docket Numbers: ER22–2601–000. Applicants: Walleye Wind, LLC. Description: Baseline eTariff Filing: Walleye Wind, LLC Application for Market-Based Rate Authority to be effective 10/4/2022. Filed Date: 8/4/22. Accession Number: 20220804–5071. Comment Date: 5 p.m. ET 8/25/22. Docket Numbers: ER22–2602–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Cost Responsibility Agreement, SA No. 6548; Non-Queue No. NQ–171 to be effective 7/8/2022. Filed Date: 8/4/22. Accession Number: 20220804–5078. Comment Date: 5 p.m. ET 8/25/22. Docket Numbers: ER22–2603–000. Applicants: NorthWestern Corporation. Description: § 205(d) Rate Filing: Revisions to Reserve Energy Service Tariff to be effective 10/1/2022. PO 00000 Frm 00038 Fmt 4703 Sfmt 4703 Filed Date: 8/4/22. Accession Number: 20220804–5086. Comment Date: 5 p.m. ET 8/25/22. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: August 4, 2022. Kimberly D. Bose, Secretary. [FR Doc. 2022–17153 Filed 8–9–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 1218–050] Georgia Power Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Request for temporary variance of Article 401. b. Project No: 1218–050. c. Date Filed: July 27, 2022. d. Applicant: Georgia Power Company (licensee). e. Name of Project: Flint River Hydroelectric Project. f. Location: The project is located on the Flint River, near the City of Albany, in Lee and Dougherty counties, Georgia. The project does not occupy federally owned lands. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Melissa Crabbe, Southern Company, 241 Ralph McGill Boulevard, NE BIN 10193, Atlanta, GA 30308–3374, (404) 506–7273, mccrabbe@southernco.com. E:\FR\FM\10AUN1.SGM 10AUN1 khammond on DSKJM1Z7X2PROD with NOTICES Federal Register / Vol. 87, No. 153 / Wednesday, August 10, 2022 / Notices i. FERC Contact: Jeremy Jessup, (202) 502–6779, Jeremy.Jessup@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests: September 2, 2022. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include the docket number P–1218–050. Comments emailed to Commission staff are not considered part of the Commission record. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Description of Request: The applicant proposes a temporary variance from the target water surface elevation requirements of Article 401 of the license (181.8 ± 0.5 feet Plant Datum which is 0.37 foot above mean sea level) to facilitate a scheduled a drawdown of the project impoundment, Lake Worth. The purpose of the drawdown is to provide for installation of new shoreline structures and maintenance of existing shoreline structures. The licensee will lower Lake Worth approximately 3.5 feet from the lower limit of the normal target elevation range, 181.3 feet, to an elevation of 177.8 ± 0.5 feet. The drawdown is scheduled to begin on September 27, 2022, and the licensee VerDate Sep<11>2014 17:26 Aug 09, 2022 Jkt 256001 proposes to utilize a drawdown rate of one half-foot per day. The licensee anticipates reaching the target drawdown elevation of 177.8 feet on October 3, 2022 and remain at the target drawdown elevation for four weeks. The licensee plans to begin refilling Lake Worth on November 1, 2022. The licensee states that the completion of refilling the reservoir would be dependent on precipitation and the releases from the upstream Lake Blackshear Hydroelectric Project No. 659. The licensee will continue to operate to comply with Article 401 runof-river operations requirement when it reaches the target drawdown elevation of 177.8 feet. l. Locations of the Application: This filing may be viewed on the Commission’s website at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. Agencies may obtain copies of the application directly from the applicant. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214, respectively. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person commenting, protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 PO 00000 Frm 00039 Fmt 4703 Sfmt 4703 48657 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. Any filing made by an intervenor must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010. Dated: August 3, 2022. Kimberly D. Bose, Secretary. [FR Doc. 2022–17128 Filed 8–9–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 1892–030; Project No. 1855– 050; Project No. 1904–078] Great River Hydro, LLC; Notice of Settlement Agreement and Soliciting Comments Take notice that the following settlement agreement has been filed with the Commission and is available for public inspection. a. Type of Application: Settlement Agreement. b. Project Nos.: 1892–030, 1855–050, and 1904–078. c. Date filed: August 3, 2022. d. Applicant: Great River Hydro, LLC (Great River). e. Name of Projects: Wilder Hydroelectric Project, Bellows Falls Hydroelectric Project, and Vernon Hydroelectric Project (collectively, projects). f. Location: The existing projects are located on the Connecticut River in the counties of Orange, Windham, and Windsor, Vermont and Sullivan, Cheshire, and Grafton, New Hampshire. The projects do not affect federal land. g. Filed Pursuant to: Rule 602 of the Commission’s Rules of Practice and Procedure, 18 CFR 385.602. h. Applicant Contact: John Ragonese, FERC License Manager, Great River Hydro, LLC, 40 Pleasant Street, Suite 202, Portsmouth, NH 03801; (603) 498– 2851 or jragonese@greatriverhydro.com. i. FERC Contact: Steve Kartalia, (202) 502–6131 or stephen.kartalia@ferc.gov. j. Deadline for filing comments: September 2, 2022. Reply comments due September 17, 2022. The Commission strongly encourages electronic filing. Please file comments using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, E:\FR\FM\10AUN1.SGM 10AUN1

Agencies

[Federal Register Volume 87, Number 153 (Wednesday, August 10, 2022)]
[Notices]
[Pages 48656-48657]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-17128]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 1218-050]


Georgia Power Company; Notice of Application Accepted for Filing 
and Soliciting Comments, Motions To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Application Type: Request for temporary variance of Article 401.
    b. Project No: 1218-050.
    c. Date Filed: July 27, 2022.
    d. Applicant: Georgia Power Company (licensee).
    e. Name of Project: Flint River Hydroelectric Project.
    f. Location: The project is located on the Flint River, near the 
City of Albany, in Lee and Dougherty counties, Georgia. The project 
does not occupy federally owned lands.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: Melissa Crabbe, Southern Company, 241 Ralph 
McGill Boulevard, NE BIN 10193, Atlanta, GA 30308-3374, (404) 506-7273, 
[email protected].

[[Page 48657]]

    i. FERC Contact: Jeremy Jessup, (202) 502-6779, 
[email protected].
    j. Deadline for filing comments, motions to intervene, and 
protests: September 2, 2022.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, and protests using the Commission's 
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. 
Commenters can submit brief comments up to 6,000 characters, without 
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact 
information at the end of your comments. For assistance, please contact 
FERC Online Support at [email protected], (866) 208-3676 (toll 
free), or (202) 502-8659 (TTY). In lieu of electronic filing, you may 
submit a paper copy. Submissions sent via the U.S. Postal Service must 
be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory 
Commission, 888 First Street NE, Room 1A, Washington, DC 20426. 
Submissions sent via any other carrier must be addressed to: Kimberly 
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins 
Avenue, Rockville, Maryland 20852. The first page of any filing should 
include the docket number P-1218-050. Comments emailed to Commission 
staff are not considered part of the Commission record.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person whose name appears on the official service 
list for the project. Further, if an intervenor files comments or 
documents with the Commission relating to the merits of an issue that 
may affect the responsibilities of a particular resource agency, they 
must also serve a copy of the document on that resource agency.
    k. Description of Request: The applicant proposes a temporary 
variance from the target water surface elevation requirements of 
Article 401 of the license (181.8  0.5 feet Plant Datum 
which is 0.37 foot above mean sea level) to facilitate a scheduled a 
drawdown of the project impoundment, Lake Worth. The purpose of the 
drawdown is to provide for installation of new shoreline structures and 
maintenance of existing shoreline structures. The licensee will lower 
Lake Worth approximately 3.5 feet from the lower limit of the normal 
target elevation range, 181.3 feet, to an elevation of 177.8  0.5 feet. The drawdown is scheduled to begin on September 27, 
2022, and the licensee proposes to utilize a drawdown rate of one half-
foot per day. The licensee anticipates reaching the target drawdown 
elevation of 177.8 feet on October 3, 2022 and remain at the target 
drawdown elevation for four weeks. The licensee plans to begin 
refilling Lake Worth on November 1, 2022. The licensee states that the 
completion of refilling the reservoir would be dependent on 
precipitation and the releases from the upstream Lake Blackshear 
Hydroelectric Project No. 659. The licensee will continue to operate to 
comply with Article 401 run-of-river operations requirement when it 
reaches the target drawdown elevation of 177.8 feet.
    l. Locations of the Application: This filing may be viewed on the 
Commission's website at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. You may also register 
online at https://www.ferc.gov/docs-filing/esubscription.asp to be 
notified via email of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208-3676 or email 
[email protected], for TTY, call (202) 502-8659. Agencies may 
obtain copies of the application directly from the applicant.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214, respectively. In determining the appropriate action to take, the 
Commission will consider all protests or other comments filed, but only 
those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any comments, 
protests, or motions to intervene must be received on or before the 
specified comment date for the particular application.
    o. Filing and Service of Documents: Any filing must (1) bear in all 
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO 
INTERVENE'' as applicable; (2) set forth in the heading the name of the 
applicant and the project number of the application to which the filing 
responds; (3) furnish the name, address, and telephone number of the 
person commenting, protesting or intervening; and (4) otherwise comply 
with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis. Any filing made by an intervenor must be accompanied 
by proof of service on all persons listed in the service list prepared 
by the Commission in this proceeding, in accordance with 18 CFR 
385.2010.

    Dated: August 3, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-17128 Filed 8-9-22; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.