Georgia Power Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests, 48656-48657 [2022-17128]
Download as PDF
khammond on DSKJM1Z7X2PROD with NOTICES
48656
Federal Register / Vol. 87, No. 153 / Wednesday, August 10, 2022 / Notices
Description: Tariff Amendment:
Amendment to 3 to be effective 6/28/
2022.
Filed Date: 8/3/22.
Accession Number: 20220803–5114.
Comment Date: 5 p.m. ET 8/24/22.
Docket Numbers: ER22–188–001;
ER22–353–001; ER22–416–001; ER22–
423–001; ER22–433–001; ER22–456–
001; ER22–464–001; ER22–472–001;
ER22–508–001; ER22–519–001; ER22–
521–001; ER22–523–001.
Applicants: Indra Power Business TX
LLC, Indra Power Business VA LLC,
Indra Power Business DC LLC, Indra
Power Business IL LLC, Indra Power
Business DE LLC, Indra Power Business
MD LLC, Indra Power Business MA
LLC, Indra Power Business PA, LLC,
Columbia Utilities Power Business LLC,
Indra Power Business NJ, LLC, Indra
Power Business MI, LLC, Indra Power
Business CT, LLC.
Description: Notice of Change in
Status of Indra Power Business CT, LLC,
et al.
Filed Date: 8/2/22.
Accession Number: 20220802–5176.
Comment Date: 5 p.m. ET 8/23/22.
Docket Numbers: ER22–2055–001.
Applicants: Black Hills Colorado
Electric, LLC.
Description: Tariff Amendment:
BHCOE Reponse to Deficency Letter to
be effective 8/8/2022.
Filed Date: 8/4/22.
Accession Number: 20220804–5065.
Comment Date: 5 p.m. ET 8/25/22.
Docket Numbers: ER22–2089–001.
Applicants: Alabama Power
Company, Georgia Power Company,
Mississippi Power Company.
Description: Tariff Amendment:
Alabama Power Company submits tariff
filing per 35.17(b): Supplement to Origis
Development (Thalmann 1 Solar &
Battery) LGIA Filing to be effective 6/1/
2022.
Filed Date: 8/3/22.
Accession Number: 20220803–5101.
Comment Date: 5 p.m. ET 8/24/22.
Docket Numbers: ER22–2090–001.
Applicants: Alabama Power
Company, Georgia Power Company,
Mississippi Power Company.
Description: Tariff Amendment:
Alabama Power Company submits tariff
filing per 35.17(b): Supplement to Origis
Development (Thalmann 2 Solar &
Battery) LGIA Filing to be effective 6/1/
2022.
Filed Date: 8/3/22.
Accession Number: 20220803–5102.
Comment Date: 5 p.m. ET 8/24/22.
Docket Numbers: ER22–2596–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
3749R1 WAPA and NPPD
VerDate Sep<11>2014
17:26 Aug 09, 2022
Jkt 256001
Interconnection Agreement to be
effective 8/3/2022.
Filed Date: 8/4/22.
Accession Number: 20220804–5006.
Comment Date: 5 p.m. ET 8/25/22.
Docket Numbers: ER22–2597–000.
Applicants: Consumers Energy
Company.
Description: Initial rate filing:
Proposed Refund of ADIT per Order No.
864 to be effective 12/31/9998.
Filed Date: 8/4/22.
Accession Number: 20220804–5011.
Comment Date: 5 p.m. ET 8/25/22.
Docket Numbers: ER22–2598–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Original NSA, Service Agreement No.
6574; Queue No. AE1–101 to be
effective 7/12/2022.
Filed Date: 8/4/22.
Accession Number: 20220804–5012.
Comment Date: 5 p.m. ET 8/25/22.
Docket Numbers: ER22–2599–000.
Applicants: Atlantic Power and Gas
LLC.
Description: Notice of Cancellation of
Market Based Rate Tariff of Atlantic
Power and Gas LLC.
Filed Date: 8/1/22.
Accession Number: 20220801–5299.
Comment Date: 5 p.m. ET 8/22/22.
Docket Numbers: ER22–2600–000.
Applicants: Arizona Public Service
Company.
Description: § 205(d) Rate Filing:
Service Agreement No. 360, Navopache
NITS Amendment No. 1 to be effective
10/5/2022.
Filed Date: 8/4/22.
Accession Number: 20220804–5058.
Comment Date: 5 p.m. ET 8/25/22.
Docket Numbers: ER22–2601–000.
Applicants: Walleye Wind, LLC.
Description: Baseline eTariff Filing:
Walleye Wind, LLC Application for
Market-Based Rate Authority to be
effective 10/4/2022.
Filed Date: 8/4/22.
Accession Number: 20220804–5071.
Comment Date: 5 p.m. ET 8/25/22.
Docket Numbers: ER22–2602–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing: Cost
Responsibility Agreement, SA No. 6548;
Non-Queue No. NQ–171 to be effective
7/8/2022.
Filed Date: 8/4/22.
Accession Number: 20220804–5078.
Comment Date: 5 p.m. ET 8/25/22.
Docket Numbers: ER22–2603–000.
Applicants: NorthWestern
Corporation.
Description: § 205(d) Rate Filing:
Revisions to Reserve Energy Service
Tariff to be effective 10/1/2022.
PO 00000
Frm 00038
Fmt 4703
Sfmt 4703
Filed Date: 8/4/22.
Accession Number: 20220804–5086.
Comment Date: 5 p.m. ET 8/25/22.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 4, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–17153 Filed 8–9–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 1218–050]
Georgia Power Company; Notice of
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Request for
temporary variance of Article 401.
b. Project No: 1218–050.
c. Date Filed: July 27, 2022.
d. Applicant: Georgia Power Company
(licensee).
e. Name of Project: Flint River
Hydroelectric Project.
f. Location: The project is located on
the Flint River, near the City of Albany,
in Lee and Dougherty counties, Georgia.
The project does not occupy federally
owned lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Melissa Crabbe,
Southern Company, 241 Ralph McGill
Boulevard, NE BIN 10193, Atlanta, GA
30308–3374, (404) 506–7273,
mccrabbe@southernco.com.
E:\FR\FM\10AUN1.SGM
10AUN1
khammond on DSKJM1Z7X2PROD with NOTICES
Federal Register / Vol. 87, No. 153 / Wednesday, August 10, 2022 / Notices
i. FERC Contact: Jeremy Jessup, (202)
502–6779, Jeremy.Jessup@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests:
September 2, 2022.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include the
docket number P–1218–050. Comments
emailed to Commission staff are not
considered part of the Commission
record.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: The
applicant proposes a temporary variance
from the target water surface elevation
requirements of Article 401 of the
license (181.8 ± 0.5 feet Plant Datum
which is 0.37 foot above mean sea level)
to facilitate a scheduled a drawdown of
the project impoundment, Lake Worth.
The purpose of the drawdown is to
provide for installation of new shoreline
structures and maintenance of existing
shoreline structures. The licensee will
lower Lake Worth approximately 3.5
feet from the lower limit of the normal
target elevation range, 181.3 feet, to an
elevation of 177.8 ± 0.5 feet. The
drawdown is scheduled to begin on
September 27, 2022, and the licensee
VerDate Sep<11>2014
17:26 Aug 09, 2022
Jkt 256001
proposes to utilize a drawdown rate of
one half-foot per day. The licensee
anticipates reaching the target
drawdown elevation of 177.8 feet on
October 3, 2022 and remain at the target
drawdown elevation for four weeks. The
licensee plans to begin refilling Lake
Worth on November 1, 2022. The
licensee states that the completion of
refilling the reservoir would be
dependent on precipitation and the
releases from the upstream Lake
Blackshear Hydroelectric Project No.
659. The licensee will continue to
operate to comply with Article 401 runof-river operations requirement when it
reaches the target drawdown elevation
of 177.8 feet.
l. Locations of the Application: This
filing may be viewed on the
Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. Agencies may
obtain copies of the application directly
from the applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
48657
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: August 3, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–17128 Filed 8–9–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 1892–030; Project No. 1855–
050; Project No. 1904–078]
Great River Hydro, LLC; Notice of
Settlement Agreement and Soliciting
Comments
Take notice that the following
settlement agreement has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Settlement
Agreement.
b. Project Nos.: 1892–030, 1855–050,
and 1904–078.
c. Date filed: August 3, 2022.
d. Applicant: Great River Hydro, LLC
(Great River).
e. Name of Projects: Wilder
Hydroelectric Project, Bellows Falls
Hydroelectric Project, and Vernon
Hydroelectric Project (collectively,
projects).
f. Location: The existing projects are
located on the Connecticut River in the
counties of Orange, Windham, and
Windsor, Vermont and Sullivan,
Cheshire, and Grafton, New Hampshire.
The projects do not affect federal land.
g. Filed Pursuant to: Rule 602 of the
Commission’s Rules of Practice and
Procedure, 18 CFR 385.602.
h. Applicant Contact: John Ragonese,
FERC License Manager, Great River
Hydro, LLC, 40 Pleasant Street, Suite
202, Portsmouth, NH 03801; (603) 498–
2851 or jragonese@greatriverhydro.com.
i. FERC Contact: Steve Kartalia, (202)
502–6131 or stephen.kartalia@ferc.gov.
j. Deadline for filing comments:
September 2, 2022. Reply comments
due September 17, 2022.
The Commission strongly encourages
electronic filing. Please file comments
using the Commission’s eFiling system
at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
E:\FR\FM\10AUN1.SGM
10AUN1
Agencies
[Federal Register Volume 87, Number 153 (Wednesday, August 10, 2022)]
[Notices]
[Pages 48656-48657]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-17128]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 1218-050]
Georgia Power Company; Notice of Application Accepted for Filing
and Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Request for temporary variance of Article 401.
b. Project No: 1218-050.
c. Date Filed: July 27, 2022.
d. Applicant: Georgia Power Company (licensee).
e. Name of Project: Flint River Hydroelectric Project.
f. Location: The project is located on the Flint River, near the
City of Albany, in Lee and Dougherty counties, Georgia. The project
does not occupy federally owned lands.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Melissa Crabbe, Southern Company, 241 Ralph
McGill Boulevard, NE BIN 10193, Atlanta, GA 30308-3374, (404) 506-7273,
[email protected].
[[Page 48657]]
i. FERC Contact: Jeremy Jessup, (202) 502-6779,
[email protected].
j. Deadline for filing comments, motions to intervene, and
protests: September 2, 2022.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, and protests using the Commission's
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments up to 6,000 characters, without
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact
information at the end of your comments. For assistance, please contact
FERC Online Support at [email protected], (866) 208-3676 (toll
free), or (202) 502-8659 (TTY). In lieu of electronic filing, you may
submit a paper copy. Submissions sent via the U.S. Postal Service must
be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier must be addressed to: Kimberly
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852. The first page of any filing should
include the docket number P-1218-050. Comments emailed to Commission
staff are not considered part of the Commission record.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency.
k. Description of Request: The applicant proposes a temporary
variance from the target water surface elevation requirements of
Article 401 of the license (181.8 0.5 feet Plant Datum
which is 0.37 foot above mean sea level) to facilitate a scheduled a
drawdown of the project impoundment, Lake Worth. The purpose of the
drawdown is to provide for installation of new shoreline structures and
maintenance of existing shoreline structures. The licensee will lower
Lake Worth approximately 3.5 feet from the lower limit of the normal
target elevation range, 181.3 feet, to an elevation of 177.8 0.5 feet. The drawdown is scheduled to begin on September 27,
2022, and the licensee proposes to utilize a drawdown rate of one half-
foot per day. The licensee anticipates reaching the target drawdown
elevation of 177.8 feet on October 3, 2022 and remain at the target
drawdown elevation for four weeks. The licensee plans to begin
refilling Lake Worth on November 1, 2022. The licensee states that the
completion of refilling the reservoir would be dependent on
precipitation and the releases from the upstream Lake Blackshear
Hydroelectric Project No. 659. The licensee will continue to operate to
comply with Article 401 run-of-river operations requirement when it
reaches the target drawdown elevation of 177.8 feet.
l. Locations of the Application: This filing may be viewed on the
Commission's website at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. You may also register
online at https://www.ferc.gov/docs-filing/esubscription.asp to be
notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or email
[email protected], for TTY, call (202) 502-8659. Agencies may
obtain copies of the application directly from the applicant.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214, respectively. In determining the appropriate action to take, the
Commission will consider all protests or other comments filed, but only
those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular application.
o. Filing and Service of Documents: Any filing must (1) bear in all
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO
INTERVENE'' as applicable; (2) set forth in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person commenting, protesting or intervening; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis. Any filing made by an intervenor must be accompanied
by proof of service on all persons listed in the service list prepared
by the Commission in this proceeding, in accordance with 18 CFR
385.2010.
Dated: August 3, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-17128 Filed 8-9-22; 8:45 am]
BILLING CODE 6717-01-P