Big Wood Canal Company; Notice of Intent To File License Application, Filing of Pre-Application Document, Approving Use of the Traditional Licensing Process, 12682-12683 [2022-04768]
Download as PDF
12682
Federal Register / Vol. 87, No. 44 / Monday, March 7, 2022 / Notices
in a Federal Register notice entitled,
‘‘Energy Conservation Program for
Consumer Products: Representative
Average Unit Costs of Energy’’, dated
August 25, 2021, 86 FR 47482.
On April 6, 2022, the cost figures
published in this notice will become
effective and supersede those cost
figures published on August 25, 2021.
The cost figures set forth in this notice
will be effective until further notice.
DOE’s Energy Information
Administration (EIA) has developed the
2022 representative average unit aftertax residential costs found in this
notice. These costs for electricity,
natural gas, No. 2 heating oil, and
propane are based on simulations used
to produce the February 2022, EIA
Short-Term Energy Outlook (EIA
releases the Outlook monthly). The
representative average unit after-tax cost
for kerosene is derived from its price
relative to that of heating oil, based on
the 2010 to 2013 averages of the U.S.
refiner price to end users, which
include all the major energy-consuming
sectors in the U.S. for these fuels. The
source for these price data is the January
2022, Monthly Energy Review DOE/EIA–
0035(2022/1). The representative
average unit after-tax cost for propane is
derived from its price relative to that of
heating oil, based on the 2021 averages
of the U.S. residential sector prices
found in the Annual Energy Outlook
2021, AEO2021) (February 3, 2021). The
Short-Term Energy Outlook, the
Monthly Energy Review, and the Annual
Energy Outlook are available on the EIA
website at https://www.eia.doe.gov. For
more information on the data sources
used in this Notice, contact the National
Energy Information Center, Forrestal
Building, EI–30, 1000 Independence
Avenue SW, Washington, DC 20585,
(202) 586–8800, email: infoctr@
eia.doe.gov.
The 2022 representative average unit
costs under section 323(b)(4) of the Act
are set forth in Table 1, and will become
effective April 6, 2022. They will
remain in effect until further notice.
Signing Authority
This document of the Department of
Energy was signed on March 1, 2022, by
Kelly J. Speakes-Backman, Principal
Deputy Assistant Secretary for Energy
Efficiency and Renewable Energy,
pursuant to delegated authority from the
Secretary of Energy. That document
with the original signature and date is
maintained by DOE. For administrative
purposes only, and in compliance with
requirements of the Office of the Federal
Register, the undersigned DOE Federal
Register Liaison Officer has been
authorized to sign and submit the
document in electronic format for
publication, as an official document of
the Department of Energy. This
administrative process in no way alters
the legal effect of this document upon
publication in the Federal Register.
Signed in Washington, DC, on March 2,
2022.
Treena V. Garrett,
Federal Register Liaison Officer, U.S.
Department of Energy.
TABLE 1—REPRESENTATIVE AVERAGE UNIT COSTS OF ENERGY FOR FIVE RESIDENTIAL ENERGY SOURCES
[2022]
Per million
Btu 1
Type of energy
Electricity .......................................................................
Natural Gas ...................................................................
$41.79
12.09
No. 2 Heating Oil ...........................................................
Propane .........................................................................
Kerosene .......................................................................
25.11
24.46
29.73
In commonly used terms
14.26¢/kWh 2 3 ....................
$1.209/therm 4 or $12.56/
MCF 5 6.
$3.45/gallon 7 ......................
$2.23/gallon 8 ......................
$4.01/gallon 9 ......................
As required by test procedure
$0.143/kWh.
$0.00001209/Btu.
$0.00002511/Btu.
$0.00002446/Btu.
$0.00002973/Btu.
Sources: U.S. Energy Information Administration, Short-Term Energy Outlook (February 8, 2022), Annual Energy Outlook (February 3, 2021),
and Monthly Energy Review (January 27, 2022).
Notes: Prices include taxes.
1 Btu stands for British thermal units.
2 kWh stands for kilowatt hour.
3 1 kWh = 3,412 Btu.
4 1 therm = 100,000 Btu.
5 MCF stands for 1,000 cubic feet.
6 For the purposes of this table, one cubic foot of natural gas has an energy equivalence of 1,039 Btu.
7 For the purposes of this table, one gallon of No. 2 heating oil has an energy equivalence of 13,738 Btu.
8 For the purposes of this table, one gallon of liquid propane has an energy equivalence of 91,333 Btu.
9 For the purposes of this table, one gallon of kerosene has an energy equivalence of 135,000 Btu.
[FR Doc. 2022–04765 Filed 3–4–22; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
khammond on DSKJM1Z7X2PROD with NOTICES
[Project No. 3407–087]
Big Wood Canal Company; Notice of
Intent To File License Application,
Filing of Pre-Application Document,
Approving Use of the Traditional
Licensing Process
a. Type of Filing: Notice Approving
the Use of the Traditional Licensing
Process.
b. Project No.: 3407–087.
c. Date Filed: January 3, 2022.
VerDate Sep<11>2014
17:50 Mar 04, 2022
Jkt 256001
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
d. Submitted By: Big Wood Canal
Company.
e. Name of Project: Magic Reservoir
Hydroelectric Project.
f. Location: On the Big Wood River in
the Blaine and Camas Counties, Idaho.
The project occupies land within the
U.S. Department of Interior, Bureau of
Land Management (BLM).
g. Filed Pursuant to: 18 CFR part 5 of
the Commission’s Regulations.
h. Applicant Contact: Mr. Nicholas E.
Josten, 2742 Saint Charles Ave, Idaho
Falls, ID 83404, (208) 520–5135.
i. FERC Contact: Maryam Zavareh at
(202) 502–8474 or email at
Maryam.zavareh@ferc.gov.
E:\FR\FM\07MRN1.SGM
07MRN1
khammond on DSKJM1Z7X2PROD with NOTICES
Federal Register / Vol. 87, No. 44 / Monday, March 7, 2022 / Notices
j. Big Wood Canal Company filed its
request to use the Traditional Licensing
Process on January 3, 2022. Big Wood
Canal Company provided public notice
of its request on January 18, 2022. In a
letter dated February 28, 2022, the
Director of the Division of Hydropower
Licensing approved Big Wood Canal
Company’s request to use the
Traditional Licensing Process.
k. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service and/or NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50
CFR, Part 402. We are also initiating
consultation with the Idaho State
Historic Preservation Officer, as
required by section 106, National
Historic Preservation Act, and the
implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating
Big Wood Canal Company as the
Commission’s non-federal
representative for carrying out informal
consultation, pursuant to section 7 of
the Endangered Species Act and section
305(b) of the Magnuson-Stevens Fishery
Conservation and Management Act; and
consultation pursuant to section 106 of
the National Historic Preservation Act.
m. Big Wood Canal Company filed a
Pre-Application Document (PAD;
including a proposed process plan and
schedule) with the Commission,
pursuant to 18 CFR 5.6 of the
Commission’s regulations.
n. A copy of the PAD is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s website (https://
www.ferc.gov), using the ‘‘eLibrary’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCONlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). A copy is also available for
inspection and reproduction at the
address in paragraph h.
o. The licensee states its unequivocal
intent to submit an application for a
new license for Project No. 3407.
Pursuant to 18 CFR 16.8, 16.9, and 16.10
each application for a new license and
any competing license applications
must be filed with the Commission at
least 24 months prior to the expiration
of the existing license. All applications
for license for this project must be filed
by January 01, 2025.
p. Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
VerDate Sep<11>2014
17:50 Mar 04, 2022
Jkt 256001
email of new filing and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Dated: March 1, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–04768 Filed 3–4–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP22–609–000.
Applicants: TransColorado Gas
Transmission Company LLC.
Description: § 4(d) Rate Filing:
Quarterly FLU Update Filing to be
effective 4/1/2022.
Filed Date: 2/28/22.
Accession Number: 20220228–5078.
Comment Date: 5 p.m. ET 3/14/22.
Docket Numbers: RP22–610–000.
Applicants: Dominion Energy Questar
Pipeline, LLC.
Description: § 4(d) Rate Filing: Access
Agreement Version 7.0.0 to be effective
3/31/2022.
Filed Date: 2/28/22.
Accession Number: 20220228–5080.
Comment Date: 5 p.m. ET 3/14/22.
Docket Numbers: RP22–611–000.
Applicants: Dominion Energy
Overthrust Pipeline, LLC.
Description: § 4(d) Rate Filing: Access
Agreement Revision, Version 5.0.0 to be
effective 3/31/2022.
Filed Date: 2/28/22.
Accession Number: 20220228–5083.
Comment Date: 5 p.m. ET 3/14/22.
Docket Numbers: RP22–612–000.
Applicants: White River Hub, LLC.
Description: § 4(d) Rate Filing:
Electronic Access Agreement Version
4.0.0 to be effective 3/31/2022.
Filed Date: 2/28/22.
Accession Number: 20220228–5084.
Comment Date: 5 p.m. ET 3/14/22.
Docket Numbers: RP22–613–000.
Applicants: Northern Natural Gas
Company.
Description: § 4(d) Rate Filing:
20220228 Negotiated Rate to be effective
3/1/2022.
Filed Date: 2/28/22.
Accession Number: 20220228–5086.
Comment Date: 5 p.m. ET 3/14/22.
Docket Numbers: RP22–614–000.
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
12683
Applicants: Kern River Gas
Transmission Company.
Description: § 4(d) Rate Filing: 2022
Daggett Surcharge to be effective 4/1/
2022.
Filed Date: 2/28/22.
Accession Number: 20220228–5089.
Comment Date: 5 p.m. ET 3/14/22.
Docket Numbers: RP22–615–000.
Applicants: Sabine Pipe Line LLC.
Description: § 4(d) Rate Filing: Normal
Section 5 21—rate changes 2022 to be
effective 4/1/2022.
Filed Date: 2/28/22.
Accession Number: 20220228–5095.
Comment Date: 5 p.m. ET 3/14/22.
Docket Numbers: RP22–616–000.
Applicants: Wyckoff Gas Storage
Company, LLC.
Description: Compliance filing: Order
587–Z NAESB Compliance 2–28–2022
to be effective 6/1/2022.
Filed Date: 2/28/22.
Accession Number: 20220228–5156.
Comment Date: 5 p.m. ET 3/14/22.
Docket Numbers: RP22–617–000.
Applicants: El Paso Natural Gas
Company, L.L.C.
Description: § 4(d) Rate Filing: NonConforming Amendments Filing (TEP)
to be effective 4/1/2022.
Filed Date: 2/28/22.
Accession Number: 20220228–5185.
Comment Date: 5 p.m. ET 3/14/22.
Docket Numbers: RP22–618–000.
Applicants: Nautilus Pipeline
Company, L.L.C.
Description: § 4(d) Rate Filing:
Negotiated Rate—Murphy Exploration
630216 eff 3–1–2022 to be effective 3/
1/2022.
Filed Date: 2/28/22.
Accession Number: 20220228–5201.
Comment Date: 5 p.m. ET 3/14/22.
Docket Numbers: RP22–619–000.
Applicants: Wyoming Interstate
Company, L.L.C.
Description: § 4(d) Rate Filing: NonConforming Amendments Filing
(Mieco_TMV) to be effective 4/1/2022.
Filed Date: 2/28/22.
Accession Number: 20220228–5211.
Comment Date: 5 p.m. ET 3/14/22.
Docket Numbers: RP22–620–000.
Applicants: Southern Star Central Gas
Pipeline, Inc.
Description: § 4(d) Rate Filing: Fuel
Filing—Eff. April 1, 2022 to be effective
4/1/2022.
Filed Date: 2/28/22.
Accession Number: 20220228–5214.
Comment Date: 5 p.m. ET 3/14/22.
Docket Numbers: RP22–621–000.
Applicants: LA Storage, LLC.
Description: § 4(d) Rate Filing: Filing
of Negotiated Rate, Conforming IW
Agreement (TMV) to be effective 3/1/
2022.
E:\FR\FM\07MRN1.SGM
07MRN1
Agencies
[Federal Register Volume 87, Number 44 (Monday, March 7, 2022)]
[Notices]
[Pages 12682-12683]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-04768]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 3407-087]
Big Wood Canal Company; Notice of Intent To File License
Application, Filing of Pre-Application Document, Approving Use of the
Traditional Licensing Process
a. Type of Filing: Notice Approving the Use of the Traditional
Licensing Process.
b. Project No.: 3407-087.
c. Date Filed: January 3, 2022.
d. Submitted By: Big Wood Canal Company.
e. Name of Project: Magic Reservoir Hydroelectric Project.
f. Location: On the Big Wood River in the Blaine and Camas
Counties, Idaho. The project occupies land within the U.S. Department
of Interior, Bureau of Land Management (BLM).
g. Filed Pursuant to: 18 CFR part 5 of the Commission's
Regulations.
h. Applicant Contact: Mr. Nicholas E. Josten, 2742 Saint Charles
Ave, Idaho Falls, ID 83404, (208) 520-5135.
i. FERC Contact: Maryam Zavareh at (202) 502-8474 or email at
[email protected].
[[Page 12683]]
j. Big Wood Canal Company filed its request to use the Traditional
Licensing Process on January 3, 2022. Big Wood Canal Company provided
public notice of its request on January 18, 2022. In a letter dated
February 28, 2022, the Director of the Division of Hydropower Licensing
approved Big Wood Canal Company's request to use the Traditional
Licensing Process.
k. With this notice, we are initiating informal consultation with
the U.S. Fish and Wildlife Service and/or NOAA Fisheries under section
7 of the Endangered Species Act and the joint agency regulations
thereunder at 50 CFR, Part 402. We are also initiating consultation
with the Idaho State Historic Preservation Officer, as required by
section 106, National Historic Preservation Act, and the implementing
regulations of the Advisory Council on Historic Preservation at 36 CFR
800.2.
l. With this notice, we are designating Big Wood Canal Company as
the Commission's non-federal representative for carrying out informal
consultation, pursuant to section 7 of the Endangered Species Act and
section 305(b) of the Magnuson-Stevens Fishery Conservation and
Management Act; and consultation pursuant to section 106 of the
National Historic Preservation Act.
m. Big Wood Canal Company filed a Pre-Application Document (PAD;
including a proposed process plan and schedule) with the Commission,
pursuant to 18 CFR 5.6 of the Commission's regulations.
n. A copy of the PAD is available for review at the Commission in
the Public Reference Room or may be viewed on the Commission's website
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket
number, excluding the last three digits in the docket number field to
access the document. For assistance, contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at
the address in paragraph h.
o. The licensee states its unequivocal intent to submit an
application for a new license for Project No. 3407. Pursuant to 18 CFR
16.8, 16.9, and 16.10 each application for a new license and any
competing license applications must be filed with the Commission at
least 24 months prior to the expiration of the existing license. All
applications for license for this project must be filed by January 01,
2025.
p. Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
Dated: March 1, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-04768 Filed 3-4-22; 8:45 am]
BILLING CODE 6717-01-P