Kaukauna Utilities; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments, 47738-47739 [2022-16713]

Download as PDF 47738 Federal Register / Vol. 87, No. 149 / Thursday, August 4, 2022 / Notices under the link to Documents and Filings. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You will be asked to select the type of filing you are making; first select ‘‘General’’ and then select ‘‘Intervention.’’ The eFiling feature includes a document-less intervention option; for more information, visit https://www.ferc.gov/docs-filing/efiling/ document-less-intervention.pdf.; or (2) You can file a paper copy of your motion to intervene, along with three copies, by mailing the documents to the address below.6 Your motion to intervene must reference the Project docket number CP22–493–000. Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426 jspears on DSK121TN23PROD with NOTICES The Commission encourages electronic filing of motions to intervene (option 1 above) and has eFiling staff available to assist you at (202) 502–8258 or FercOnlineSupport@ferc.gov. Motions to intervene must be served on the applicant either by mail or email at: Tina S. Hardy, Director, Regulatory Affairs, Tennessee Gas Pipeline Company, L.L.C. 569 Brookwood Village, Suite 749, Birmingham, AL 35209 or by email at tina_hardy@ kindermorgan.com. Any subsequent submissions by an intervenor must be served on the applicant and all other parties to the proceeding. Contact information for parties can be downloaded from the service list at the eService link on FERC Online. Service can be via email with a link to the document. All timely, unopposed 7 motions to intervene are automatically granted by operation of Rule 214(c)(1).8 Motions to intervene that are filed after the intervention deadline are untimely and may be denied. Any late-filed motion to intervene must show good cause for being late and must explain why the time limitation should be waived and provide justification by reference to factors set forth in Rule 214(d) of the Commission’s Rules and Regulations.9 A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies (paper or electronic) 6 Hand delivered submissions in docketed proceedings should be delivered to Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland 20852. 7 The applicant has 15 days from the submittal of a motion to intervene to file a written objection to the intervention. 8 18 CFR 385.214(c)(1). 9 18 CFR 385.214(b)(3) and (d). VerDate Sep<11>2014 17:25 Aug 03, 2022 Jkt 256001 of all documents filed by the applicant and by all other parties. Tracking the Proceeding Throughout the proceeding, additional information about the project will be available from the Commission’s Office of External Affairs, at (866) 208– FERC, or on the FERC website at https:// www.ferc.gov using the ‘‘eLibrary’’ link as described above. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. For more information and to register, go to www.ferc.gov/docs-filing/ esubscription.asp. Intervention Deadline: 5:00 p.m. Eastern Time on August 19, 2022. Dated: July 29, 2022. Kimberly D. Bose, Secretary. [FR Doc. 2022–16710 Filed 8–3–22; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2715–026] Kaukauna Utilities; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: New Major License. b. Project No.: 2715–026. c. Date filed: July 22, 2022. d. Applicant: Kaukauna Utilities. e. Name of Project: Combined Locks Hydroelectric Project (Combined Locks Project). f. Location: On the Lower Fox River in the Village of Combined Locks and the Village of Little Chute, Outagamie County, Wisconsin. The project does not include any federal land. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)–825(r). PO 00000 Frm 00050 Fmt 4703 Sfmt 4703 h. Applicant Contact: Zachary Moureau, Environmental & Compliance Manager, Kaukauna Utilities, 777 Island Street, Kaukauna, WI 54130–7077; (920) 462–0238; zmoureau@ku-wi.org. i. FERC Contact: Patrick Ely at patrick.ely@ferc.gov or (202) 502–8570. j. Cooperating agencies: Federal, state, local, and tribal agencies with jurisdiction and/or special expertise with respect to environmental issues that wish to cooperate in the preparation of the environmental document should follow the instructions for filing such requests described in item l below. Cooperating agencies should note the Commission’s policy that agencies that cooperate in the preparation of the environmental document cannot also intervene. See, 94 FERC ¶ 61,076 (2001). k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission’s regulations, if any resource agency, Indian Tribe, or person believes that an additional scientific study should be conducted in order to form an adequate factual basis for a complete analysis of the application on its merit, the resource agency, Indian Tribe, or person must file a request for a study with the Commission not later than 60 days from the date of filing of the application, and serve a copy of the request on the applicant. l. Deadline for filing additional study requests and requests for cooperating agency status: September 20, 2022. The Commission strongly encourages electronic filing. Please file additional study requests and requests for cooperating agency status using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include docket number P–2715– 026. m. The application is not ready for environmental analysis at this time. n. The Combined Locks Project consists of: (1) a concrete and cyclopean stone dam approximately 654 feet long and 27 feet high with additional 24 inch nominal flashboards mounted upon the E:\FR\FM\04AUN1.SGM 04AUN1 Federal Register / Vol. 87, No. 149 / Thursday, August 4, 2022 / Notices spillway crest at elevation 674.6 feet International Great Lakes Datum of 1985 (IGLD85); (2) a 126.9-acre reservoir at normal full pool elevation 676.7 feet IGLD85; (3) a powerhouse approximately 65 feet wide by 130 feet long housing two 3.1-megawatt (MW) generators, for a total authorized capacity of 6.2 MW; (4) a tailrace channel; (5) a 265-foot-long, 4.16kilovolt (kV) interconnection line from the powerhouse to transformer and 1,442-foot-long, 12.47-kV interconnection line from the transformer to the substation; and (6) appurtenant facilities. o. A copy of the application may be viewed on the Commission’s website at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact FERC Online Support. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. p. Procedural schedule and final amendments: The application will be processed according to the following preliminary schedule. Revisions to the schedule will be made as appropriate. jspears on DSK121TN23PROD with NOTICES Issue Deficiency Letter (if necessary)— September 2022 Request Additional Information (if necessary)—September 2022 Issue Scoping Document 1 for comments—March 2023 Issue Scoping Document 2 (if necessary)—July 2023 Issue Notice of Ready for Environmental Analysis—July 2023 Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis. Dated: July 29, 2022. Kimberly D. Bose, Secretary. [FR Doc. 2022–16713 Filed 8–3–22; 8:45 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 17:25 Aug 03, 2022 Jkt 256001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–1451–006. Applicants: Jersey Central Power & Light. Description: Notice of Non-Material Change in Status of Jersey Central Power & Light Company. Filed Date: 7/29/22. Accession Number: 20220729–5213. Comment Date: 5 p.m. ET 8/19/22. Docket Numbers: ER10–1467–007. Applicants: Ohio Edison Company. Description: Notice of Non-Material Change in Status of Ohio Edison Company. Filed Date: 7/29/22. Accession Number: 20220729–5215. Comment Date: 5 p.m. ET 8/19/22. Docket Numbers: ER10–1468–007. Applicants: The Toledo Edison Company. Description: Notice of Non-Material Change in Status of The Toledo Edison Company. Filed Date: 7/29/22. Accession Number: 20220729–5222. Comment Date: 5 p.m. ET 8/19/22. Docket Numbers: ER10–1469–007. Applicants: The Cleveland Electric Illuminating Company. Description: Notice of Non-Material Change in Status of The Cleveland Electric Illuminating Company. Filed Date: 7/29/22. Accession Number: 20220729–5218. Comment Date: 5 p.m. ET 8/19/22. Docket Numbers: ER10–1473–006. Applicants: Pennsylvania Power Company. Description: Notice of Non-Material Change in Status of Pennsylvania Power Company. Filed Date: 7/29/22. Accession Number: 20220729–5217. Comment Date: 5 p.m. ET 8/19/22. Docket Numbers: ER10–1474–006. Applicants: Metropolitan Edison Company. Description: Notice of Non-Material Change in Status of Metropolitan Edison Company. Filed Date: 7/29/22. Accession Number: 20220729–5214. Comment Date: 5 p.m. ET 8/19/22. Docket Numbers: ER10–1478–008. Applicants: Pennsylvania Electric Company. Description: Notice of Non-Material Change in Status of Pennsylvania Electric Company. PO 00000 Frm 00051 Fmt 4703 Sfmt 4703 47739 Filed Date: 7/29/22. Accession Number: 20220729–5216. Comment Date: 5 p.m. ET 8/19/22. Docket Numbers: ER10–1511–009; ER10–1512–002; ER10–2010–007; ER10–2691–001. Applicants: The Narragansett Electric Company, PPL Electric Utilities Corporation, Kentucky Utilities Company, Louisville Gas and Electric Company. Description: Notice of Change in Status of Louisville Gas and Electric Company, et al. Filed Date: 7/28/22. Accession Number: 20220728–5230. Comment Date: 5 p.m. ET 8/18/22. Docket Numbers: ER10–2688–009. Applicants: The Potomac Edison Company. Description: Notice of Non-Material Change in Status of The Potomac Edison Company. Filed Date: 7/29/22. Accession Number: 20220729–5219. Comment Date: 5 p.m. ET 8/19/22. Docket Numbers: ER10–2728–008. Applicants: Green Valley Hydro, LLC. Description: Notice of Non-Material Change in Status of Green Valley Hydro, LLC. Filed Date: 7/29/22. Accession Number: 20220729–5209. Comment Date: 5 p.m. ET 8/19/22. Docket Numbers: ER10–310–004; ER10–2414–016; ER11–113–014; ER11– 4694–010; ER12–1680–011; ER17–2084– 004; ER20–967–002; ER21–44–004; ER22–937–001; ER22–938–001. Applicants: New Market Solar ProjectCo 2, LLC, New Market Solar ProjectCo 1, LLC, Altavista Solar, LLC, Great Bay Solar II, LLC, Great Bay Solar 1, LLC, Minonk Wind, LLC, GSG 6, LLC, Sandy Ridge Wind, LLC, Old Trail Wind Farm, LLC, Algonquin Energy Services Inc. Description: Notice of Non-Material Change in Status of Algonquin Energy Services Inc. Filed Date: 7/28/22. Accession Number: 20220728–5232. Comment Date: 5 p.m. ET 8/18/22. Docket Numbers: ER10–3297–017. Applicants: Powerex Corporation. Description: Notice of Change in Status of Powerex Corp. Filed Date: 7/28/22. Accession Number: 20220728–5228. Comment Date: 5 p.m. ET 8/18/22. Docket Numbers: ER12–273–002. Applicants: Allegheny Energy Supply Company, LLC. Description: Notice of Non-Material Change in Status of Allegheny Energy Supply Company, LLC. Filed Date: 7/29/22. E:\FR\FM\04AUN1.SGM 04AUN1

Agencies

[Federal Register Volume 87, Number 149 (Thursday, August 4, 2022)]
[Notices]
[Pages 47738-47739]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-16713]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2715-026]


Kaukauna Utilities; Notice of Application Tendered for Filing 
With the Commission and Soliciting Additional Study Requests and 
Establishing Procedural Schedule for Relicensing and a Deadline for 
Submission of Final Amendments

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: New Major License.
    b. Project No.: 2715-026.
    c. Date filed: July 22, 2022.
    d. Applicant: Kaukauna Utilities.
    e. Name of Project: Combined Locks Hydroelectric Project (Combined 
Locks Project).
    f. Location: On the Lower Fox River in the Village of Combined 
Locks and the Village of Little Chute, Outagamie County, Wisconsin. The 
project does not include any federal land.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Zachary Moureau, Environmental & Compliance 
Manager, Kaukauna Utilities, 777 Island Street, Kaukauna, WI 54130-
7077; (920) 462-0238; wi.org">[email protected]wi.org.
    i. FERC Contact: Patrick Ely at [email protected] or (202) 502-
8570.
    j. Cooperating agencies: Federal, state, local, and tribal agencies 
with jurisdiction and/or special expertise with respect to 
environmental issues that wish to cooperate in the preparation of the 
environmental document should follow the instructions for filing such 
requests described in item l below. Cooperating agencies should note 
the Commission's policy that agencies that cooperate in the preparation 
of the environmental document cannot also intervene. See, 94 FERC ] 
61,076 (2001).
    k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's 
regulations, if any resource agency, Indian Tribe, or person believes 
that an additional scientific study should be conducted in order to 
form an adequate factual basis for a complete analysis of the 
application on its merit, the resource agency, Indian Tribe, or person 
must file a request for a study with the Commission not later than 60 
days from the date of filing of the application, and serve a copy of 
the request on the applicant.
    l. Deadline for filing additional study requests and requests for 
cooperating agency status: September 20, 2022.
    The Commission strongly encourages electronic filing. Please file 
additional study requests and requests for cooperating agency status 
using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support 
at [email protected], (866) 208-3676 (toll free), or (202) 
502-8659 (TTY). In lieu of electronic filing, you may submit a paper 
copy. Submissions sent via the U.S. Postal Service must be addressed 
to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 
888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent 
via any other carrier must be addressed to: Kimberly D. Bose, 
Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, 
Rockville, Maryland 20852. The first page of any filing should include 
docket number P-2715-026.
    m. The application is not ready for environmental analysis at this 
time.
    n. The Combined Locks Project consists of: (1) a concrete and 
cyclopean stone dam approximately 654 feet long and 27 feet high with 
additional 24 inch nominal flashboards mounted upon the

[[Page 47739]]

spillway crest at elevation 674.6 feet International Great Lakes Datum 
of 1985 (IGLD85); (2) a 126.9-acre reservoir at normal full pool 
elevation 676.7 feet IGLD85; (3) a powerhouse approximately 65 feet 
wide by 130 feet long housing two 3.1-megawatt (MW) generators, for a 
total authorized capacity of 6.2 MW; (4) a tailrace channel; (5) a 265-
foot-long, 4.16-kilovolt (kV) interconnection line from the powerhouse 
to transformer and 1,442-foot-long, 12.47-kV interconnection line from 
the transformer to the substation; and (6) appurtenant facilities.
    o. A copy of the application may be viewed on the Commission's 
website at https://www.ferc.gov using the ``eLibrary'' link. Enter the 
docket number excluding the last three digits in the docket number 
field to access the document. At this time, the Commission has 
suspended access to the Commission's Public Reference Room, due to the 
proclamation declaring a National Emergency concerning the Novel 
Coronavirus Disease (COVID-19), issued by the President on March 13, 
2020. For assistance, contact FERC Online Support.
    You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.
    p. Procedural schedule and final amendments: The application will 
be processed according to the following preliminary schedule. Revisions 
to the schedule will be made as appropriate.

Issue Deficiency Letter (if necessary)--September 2022
Request Additional Information (if necessary)--September 2022
Issue Scoping Document 1 for comments--March 2023
Issue Scoping Document 2 (if necessary)--July 2023
Issue Notice of Ready for Environmental Analysis--July 2023

    Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of the notice 
of ready for environmental analysis.

    Dated: July 29, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-16713 Filed 8-3-22; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.