Kaukauna Utilities; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments, 47738-47739 [2022-16713]
Download as PDF
47738
Federal Register / Vol. 87, No. 149 / Thursday, August 4, 2022 / Notices
under the link to Documents and
Filings. New eFiling users must first
create an account by clicking on
‘‘eRegister.’’ You will be asked to select
the type of filing you are making; first
select ‘‘General’’ and then select
‘‘Intervention.’’ The eFiling feature
includes a document-less intervention
option; for more information, visit
https://www.ferc.gov/docs-filing/efiling/
document-less-intervention.pdf.; or
(2) You can file a paper copy of your
motion to intervene, along with three
copies, by mailing the documents to the
address below.6 Your motion to
intervene must reference the Project
docket number CP22–493–000.
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC
20426
jspears on DSK121TN23PROD with NOTICES
The Commission encourages
electronic filing of motions to intervene
(option 1 above) and has eFiling staff
available to assist you at (202) 502–8258
or FercOnlineSupport@ferc.gov.
Motions to intervene must be served
on the applicant either by mail or email
at: Tina S. Hardy, Director, Regulatory
Affairs, Tennessee Gas Pipeline
Company, L.L.C. 569 Brookwood
Village, Suite 749, Birmingham, AL
35209 or by email at tina_hardy@
kindermorgan.com. Any subsequent
submissions by an intervenor must be
served on the applicant and all other
parties to the proceeding. Contact
information for parties can be
downloaded from the service list at the
eService link on FERC Online. Service
can be via email with a link to the
document.
All timely, unopposed 7 motions to
intervene are automatically granted by
operation of Rule 214(c)(1).8 Motions to
intervene that are filed after the
intervention deadline are untimely and
may be denied. Any late-filed motion to
intervene must show good cause for
being late and must explain why the
time limitation should be waived and
provide justification by reference to
factors set forth in Rule 214(d) of the
Commission’s Rules and Regulations.9
A person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies (paper or electronic)
6 Hand delivered submissions in docketed
proceedings should be delivered to Health and
Human Services, 12225 Wilkins Avenue, Rockville,
Maryland 20852.
7 The applicant has 15 days from the submittal of
a motion to intervene to file a written objection to
the intervention.
8 18 CFR 385.214(c)(1).
9 18 CFR 385.214(b)(3) and (d).
VerDate Sep<11>2014
17:25 Aug 03, 2022
Jkt 256001
of all documents filed by the applicant
and by all other parties.
Tracking the Proceeding
Throughout the proceeding,
additional information about the project
will be available from the Commission’s
Office of External Affairs, at (866) 208–
FERC, or on the FERC website at https://
www.ferc.gov using the ‘‘eLibrary’’ link
as described above. The eLibrary link
also provides access to the texts of all
formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. For more information and to
register, go to www.ferc.gov/docs-filing/
esubscription.asp.
Intervention Deadline: 5:00 p.m.
Eastern Time on August 19, 2022.
Dated: July 29, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–16710 Filed 8–3–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2715–026]
Kaukauna Utilities; Notice of
Application Tendered for Filing With
the Commission and Soliciting
Additional Study Requests and
Establishing Procedural Schedule for
Relicensing and a Deadline for
Submission of Final Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 2715–026.
c. Date filed: July 22, 2022.
d. Applicant: Kaukauna Utilities.
e. Name of Project: Combined Locks
Hydroelectric Project (Combined Locks
Project).
f. Location: On the Lower Fox River
in the Village of Combined Locks and
the Village of Little Chute, Outagamie
County, Wisconsin. The project does not
include any federal land.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
PO 00000
Frm 00050
Fmt 4703
Sfmt 4703
h. Applicant Contact: Zachary
Moureau, Environmental & Compliance
Manager, Kaukauna Utilities, 777 Island
Street, Kaukauna, WI 54130–7077; (920)
462–0238; zmoureau@ku-wi.org.
i. FERC Contact: Patrick Ely at
patrick.ely@ferc.gov or (202) 502–8570.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: September 20, 2022.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, you may submit a
paper copy. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852. The first page of any filing
should include docket number P–2715–
026.
m. The application is not ready for
environmental analysis at this time.
n. The Combined Locks Project
consists of: (1) a concrete and cyclopean
stone dam approximately 654 feet long
and 27 feet high with additional 24 inch
nominal flashboards mounted upon the
E:\FR\FM\04AUN1.SGM
04AUN1
Federal Register / Vol. 87, No. 149 / Thursday, August 4, 2022 / Notices
spillway crest at elevation 674.6 feet
International Great Lakes Datum of 1985
(IGLD85); (2) a 126.9-acre reservoir at
normal full pool elevation 676.7 feet
IGLD85; (3) a powerhouse
approximately 65 feet wide by 130 feet
long housing two 3.1-megawatt (MW)
generators, for a total authorized
capacity of 6.2 MW; (4) a tailrace
channel; (5) a 265-foot-long, 4.16kilovolt (kV) interconnection line from
the powerhouse to transformer and
1,442-foot-long, 12.47-kV
interconnection line from the
transformer to the substation; and (6)
appurtenant facilities.
o. A copy of the application may be
viewed on the Commission’s website at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. At this time, the Commission
has suspended access to the
Commission’s Public Reference Room,
due to the proclamation declaring a
National Emergency concerning the
Novel Coronavirus Disease (COVID–19),
issued by the President on March 13,
2020. For assistance, contact FERC
Online Support.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. Procedural schedule and final
amendments: The application will be
processed according to the following
preliminary schedule. Revisions to the
schedule will be made as appropriate.
jspears on DSK121TN23PROD with NOTICES
Issue Deficiency Letter (if necessary)—
September 2022
Request Additional Information (if
necessary)—September 2022
Issue Scoping Document 1 for
comments—March 2023
Issue Scoping Document 2 (if
necessary)—July 2023
Issue Notice of Ready for Environmental
Analysis—July 2023
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of the notice of ready for
environmental analysis.
Dated: July 29, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–16713 Filed 8–3–22; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
17:25 Aug 03, 2022
Jkt 256001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–1451–006.
Applicants: Jersey Central Power &
Light.
Description: Notice of Non-Material
Change in Status of Jersey Central Power
& Light Company.
Filed Date: 7/29/22.
Accession Number: 20220729–5213.
Comment Date: 5 p.m. ET 8/19/22.
Docket Numbers: ER10–1467–007.
Applicants: Ohio Edison Company.
Description: Notice of Non-Material
Change in Status of Ohio Edison
Company.
Filed Date: 7/29/22.
Accession Number: 20220729–5215.
Comment Date: 5 p.m. ET 8/19/22.
Docket Numbers: ER10–1468–007.
Applicants: The Toledo Edison
Company.
Description: Notice of Non-Material
Change in Status of The Toledo Edison
Company.
Filed Date: 7/29/22.
Accession Number: 20220729–5222.
Comment Date: 5 p.m. ET 8/19/22.
Docket Numbers: ER10–1469–007.
Applicants: The Cleveland Electric
Illuminating Company.
Description: Notice of Non-Material
Change in Status of The Cleveland
Electric Illuminating Company.
Filed Date: 7/29/22.
Accession Number: 20220729–5218.
Comment Date: 5 p.m. ET 8/19/22.
Docket Numbers: ER10–1473–006.
Applicants: Pennsylvania Power
Company.
Description: Notice of Non-Material
Change in Status of Pennsylvania Power
Company.
Filed Date: 7/29/22.
Accession Number: 20220729–5217.
Comment Date: 5 p.m. ET 8/19/22.
Docket Numbers: ER10–1474–006.
Applicants: Metropolitan Edison
Company.
Description: Notice of Non-Material
Change in Status of Metropolitan Edison
Company.
Filed Date: 7/29/22.
Accession Number: 20220729–5214.
Comment Date: 5 p.m. ET 8/19/22.
Docket Numbers: ER10–1478–008.
Applicants: Pennsylvania Electric
Company.
Description: Notice of Non-Material
Change in Status of Pennsylvania
Electric Company.
PO 00000
Frm 00051
Fmt 4703
Sfmt 4703
47739
Filed Date: 7/29/22.
Accession Number: 20220729–5216.
Comment Date: 5 p.m. ET 8/19/22.
Docket Numbers: ER10–1511–009;
ER10–1512–002; ER10–2010–007;
ER10–2691–001.
Applicants: The Narragansett Electric
Company, PPL Electric Utilities
Corporation, Kentucky Utilities
Company, Louisville Gas and Electric
Company.
Description: Notice of Change in
Status of Louisville Gas and Electric
Company, et al.
Filed Date: 7/28/22.
Accession Number: 20220728–5230.
Comment Date: 5 p.m. ET 8/18/22.
Docket Numbers: ER10–2688–009.
Applicants: The Potomac Edison
Company.
Description: Notice of Non-Material
Change in Status of The Potomac Edison
Company.
Filed Date: 7/29/22.
Accession Number: 20220729–5219.
Comment Date: 5 p.m. ET 8/19/22.
Docket Numbers: ER10–2728–008.
Applicants: Green Valley Hydro, LLC.
Description: Notice of Non-Material
Change in Status of Green Valley Hydro,
LLC.
Filed Date: 7/29/22.
Accession Number: 20220729–5209.
Comment Date: 5 p.m. ET 8/19/22.
Docket Numbers: ER10–310–004;
ER10–2414–016; ER11–113–014; ER11–
4694–010; ER12–1680–011; ER17–2084–
004; ER20–967–002; ER21–44–004;
ER22–937–001; ER22–938–001.
Applicants: New Market Solar
ProjectCo 2, LLC, New Market Solar
ProjectCo 1, LLC, Altavista Solar, LLC,
Great Bay Solar II, LLC, Great Bay Solar
1, LLC, Minonk Wind, LLC, GSG 6, LLC,
Sandy Ridge Wind, LLC, Old Trail Wind
Farm, LLC, Algonquin Energy Services
Inc.
Description: Notice of Non-Material
Change in Status of Algonquin Energy
Services Inc.
Filed Date: 7/28/22.
Accession Number: 20220728–5232.
Comment Date: 5 p.m. ET 8/18/22.
Docket Numbers: ER10–3297–017.
Applicants: Powerex Corporation.
Description: Notice of Change in
Status of Powerex Corp.
Filed Date: 7/28/22.
Accession Number: 20220728–5228.
Comment Date: 5 p.m. ET 8/18/22.
Docket Numbers: ER12–273–002.
Applicants: Allegheny Energy Supply
Company, LLC.
Description: Notice of Non-Material
Change in Status of Allegheny Energy
Supply Company, LLC.
Filed Date: 7/29/22.
E:\FR\FM\04AUN1.SGM
04AUN1
Agencies
[Federal Register Volume 87, Number 149 (Thursday, August 4, 2022)]
[Notices]
[Pages 47738-47739]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-16713]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2715-026]
Kaukauna Utilities; Notice of Application Tendered for Filing
With the Commission and Soliciting Additional Study Requests and
Establishing Procedural Schedule for Relicensing and a Deadline for
Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 2715-026.
c. Date filed: July 22, 2022.
d. Applicant: Kaukauna Utilities.
e. Name of Project: Combined Locks Hydroelectric Project (Combined
Locks Project).
f. Location: On the Lower Fox River in the Village of Combined
Locks and the Village of Little Chute, Outagamie County, Wisconsin. The
project does not include any federal land.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Zachary Moureau, Environmental & Compliance
Manager, Kaukauna Utilities, 777 Island Street, Kaukauna, WI 54130-
7077; (920) 462-0238; wi.org">[email protected]wi.org.
i. FERC Contact: Patrick Ely at [email protected] or (202) 502-
8570.
j. Cooperating agencies: Federal, state, local, and tribal agencies
with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of the
environmental document should follow the instructions for filing such
requests described in item l below. Cooperating agencies should note
the Commission's policy that agencies that cooperate in the preparation
of the environmental document cannot also intervene. See, 94 FERC ]
61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's
regulations, if any resource agency, Indian Tribe, or person believes
that an additional scientific study should be conducted in order to
form an adequate factual basis for a complete analysis of the
application on its merit, the resource agency, Indian Tribe, or person
must file a request for a study with the Commission not later than 60
days from the date of filing of the application, and serve a copy of
the request on the applicant.
l. Deadline for filing additional study requests and requests for
cooperating agency status: September 20, 2022.
The Commission strongly encourages electronic filing. Please file
additional study requests and requests for cooperating agency status
using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support
at [email protected], (866) 208-3676 (toll free), or (202)
502-8659 (TTY). In lieu of electronic filing, you may submit a paper
copy. Submissions sent via the U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission,
888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent
via any other carrier must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first page of any filing should include
docket number P-2715-026.
m. The application is not ready for environmental analysis at this
time.
n. The Combined Locks Project consists of: (1) a concrete and
cyclopean stone dam approximately 654 feet long and 27 feet high with
additional 24 inch nominal flashboards mounted upon the
[[Page 47739]]
spillway crest at elevation 674.6 feet International Great Lakes Datum
of 1985 (IGLD85); (2) a 126.9-acre reservoir at normal full pool
elevation 676.7 feet IGLD85; (3) a powerhouse approximately 65 feet
wide by 130 feet long housing two 3.1-megawatt (MW) generators, for a
total authorized capacity of 6.2 MW; (4) a tailrace channel; (5) a 265-
foot-long, 4.16-kilovolt (kV) interconnection line from the powerhouse
to transformer and 1,442-foot-long, 12.47-kV interconnection line from
the transformer to the substation; and (6) appurtenant facilities.
o. A copy of the application may be viewed on the Commission's
website at https://www.ferc.gov using the ``eLibrary'' link. Enter the
docket number excluding the last three digits in the docket number
field to access the document. At this time, the Commission has
suspended access to the Commission's Public Reference Room, due to the
proclamation declaring a National Emergency concerning the Novel
Coronavirus Disease (COVID-19), issued by the President on March 13,
2020. For assistance, contact FERC Online Support.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
p. Procedural schedule and final amendments: The application will
be processed according to the following preliminary schedule. Revisions
to the schedule will be made as appropriate.
Issue Deficiency Letter (if necessary)--September 2022
Request Additional Information (if necessary)--September 2022
Issue Scoping Document 1 for comments--March 2023
Issue Scoping Document 2 (if necessary)--July 2023
Issue Notice of Ready for Environmental Analysis--July 2023
Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: July 29, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-16713 Filed 8-3-22; 8:45 am]
BILLING CODE 6717-01-P