Great River Hydro, LLC; Notice of Settlement Agreement and Soliciting Comments, 48657-48658 [2022-17152]
Download as PDF
khammond on DSKJM1Z7X2PROD with NOTICES
Federal Register / Vol. 87, No. 153 / Wednesday, August 10, 2022 / Notices
i. FERC Contact: Jeremy Jessup, (202)
502–6779, Jeremy.Jessup@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests:
September 2, 2022.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include the
docket number P–1218–050. Comments
emailed to Commission staff are not
considered part of the Commission
record.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: The
applicant proposes a temporary variance
from the target water surface elevation
requirements of Article 401 of the
license (181.8 ± 0.5 feet Plant Datum
which is 0.37 foot above mean sea level)
to facilitate a scheduled a drawdown of
the project impoundment, Lake Worth.
The purpose of the drawdown is to
provide for installation of new shoreline
structures and maintenance of existing
shoreline structures. The licensee will
lower Lake Worth approximately 3.5
feet from the lower limit of the normal
target elevation range, 181.3 feet, to an
elevation of 177.8 ± 0.5 feet. The
drawdown is scheduled to begin on
September 27, 2022, and the licensee
VerDate Sep<11>2014
17:26 Aug 09, 2022
Jkt 256001
proposes to utilize a drawdown rate of
one half-foot per day. The licensee
anticipates reaching the target
drawdown elevation of 177.8 feet on
October 3, 2022 and remain at the target
drawdown elevation for four weeks. The
licensee plans to begin refilling Lake
Worth on November 1, 2022. The
licensee states that the completion of
refilling the reservoir would be
dependent on precipitation and the
releases from the upstream Lake
Blackshear Hydroelectric Project No.
659. The licensee will continue to
operate to comply with Article 401 runof-river operations requirement when it
reaches the target drawdown elevation
of 177.8 feet.
l. Locations of the Application: This
filing may be viewed on the
Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. Agencies may
obtain copies of the application directly
from the applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
48657
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: August 3, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–17128 Filed 8–9–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 1892–030; Project No. 1855–
050; Project No. 1904–078]
Great River Hydro, LLC; Notice of
Settlement Agreement and Soliciting
Comments
Take notice that the following
settlement agreement has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Settlement
Agreement.
b. Project Nos.: 1892–030, 1855–050,
and 1904–078.
c. Date filed: August 3, 2022.
d. Applicant: Great River Hydro, LLC
(Great River).
e. Name of Projects: Wilder
Hydroelectric Project, Bellows Falls
Hydroelectric Project, and Vernon
Hydroelectric Project (collectively,
projects).
f. Location: The existing projects are
located on the Connecticut River in the
counties of Orange, Windham, and
Windsor, Vermont and Sullivan,
Cheshire, and Grafton, New Hampshire.
The projects do not affect federal land.
g. Filed Pursuant to: Rule 602 of the
Commission’s Rules of Practice and
Procedure, 18 CFR 385.602.
h. Applicant Contact: John Ragonese,
FERC License Manager, Great River
Hydro, LLC, 40 Pleasant Street, Suite
202, Portsmouth, NH 03801; (603) 498–
2851 or jragonese@greatriverhydro.com.
i. FERC Contact: Steve Kartalia, (202)
502–6131 or stephen.kartalia@ferc.gov.
j. Deadline for filing comments:
September 2, 2022. Reply comments
due September 17, 2022.
The Commission strongly encourages
electronic filing. Please file comments
using the Commission’s eFiling system
at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
E:\FR\FM\10AUN1.SGM
10AUN1
khammond on DSKJM1Z7X2PROD with NOTICES
48658
Federal Register / Vol. 87, No. 153 / Wednesday, August 10, 2022 / Notices
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include docket
numbers P–1892–030, P–1855–050, and
P–1904–078.
The Commission’s Rules of Practice
require all intervenors filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Great River filed the Settlement
Agreement on behalf of itself, the U.S.
Fish and Wildlife Service, the New
Hampshire Fish and Game Department,
and the Vermont Fish and Wildlife
Department. The purpose of the
Settlement Agreement is to resolve,
among the signatories, issues related to
fish passage associated with the
issuance of any new licenses and
fishway prescriptions under Section 18
of the FPA for the projects. Specifically,
the Settlement Agreement includes
proposed upstream and downstream
fish passage facilities, fish passage
studies, and fish passage operational
measures. Great River requests that the
Commission consider the Settlement
Agreement in its environmental
analyses of the proposed relicense
applications, and incorporate the
proposed measures into any new
licenses issued.
l. A copy of the settlement agreement
may be viewed on the Commission’s
website at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits,
in the docket number field to access the
document (i.e., P–1892, P–1855, and P–
1904). At this time, the Commission has
suspended access to the Commission’s
Public Reference Room, due to the
VerDate Sep<11>2014
17:26 Aug 09, 2022
Jkt 256001
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact FERC Online
Support.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Filed Date: 8/3/22.
Accession Number: 20220803–5037.
Comment Date: 5 p.m. ET 8/15/22.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
Dated: August 4, 2022.
Kimberly D. Bose,
Secretary.
Filings in Existing Proceedings
[FR Doc. 2022–17152 Filed 8–9–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP22–1102–000.
Applicants: MOGAS PIPELINE LLC.
Description: Annual Report on
Revenue from Penalties Subject to
Crediting of MoGas Pipeline LLC.
Filed Date: 7/29/22.
Accession Number: 20220729–5395.
Comment Date: 5 p.m. ET 8/10/22.
Docket Numbers: RP22–1105–000.
Applicants: Anadarko US Offshore
LLC, Murphy Exploration & Production
Company—USA, Eni Petroleum US
LLC, INPEX Americas, Inc.
Description: Joint Petition for
Temporary Waiver of Capacity Release
Regulations, et al. of Anadarko US
Offshore LLC, et al.
Filed Date: 7/29/22.
Accession Number: 20220729–5398.
Comment Date: 5 p.m. ET 8/10/22.
Docket Numbers: RP22–1106–000.
Applicants: East Tennessee Natural
Gas, LLC.
Description: § 4(d) Rate Filing: MAD
Service Charge and Action Alert Penalty
Filing to be effective 10/1/2022,
Filed Date: 8/3/22.
Accession Number: 20220803–5015.
Comment Date: 5 p.m. ET 8/15/22.
Docket Numbers: RP22–1107–000.
Applicants: El Paso Natural Gas
Company, L.L.C.
Description: § 4(d) Rate Filing:
Negotiated Rate Agreement Update
(SoCal August 2022) to be effective 8/3/
2022.
PO 00000
Frm 00040
Fmt 4703
Sfmt 4703
Docket Numbers: RP21–993–000.
Applicants: Cove Point LNG, LP.
Description: Report Filing: Cove
Point—2022 Report of Operational Sales
and Purchases of Gas to be effective N/
A.
Filed Date: 7/29/22.
Accession Number: 20220729–5055.
Comment Date: 5 p.m. ET 8/10/22.
Any person desiring to protest in any
the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 4, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–17149 Filed 8–9–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 298–083]
Southern California Edison Company;
Notice of Application Accepted for
Filing and Soliciting Comments,
Motions To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Temporary
variance of license flow requirements.
b. Project No.: 298–083.
E:\FR\FM\10AUN1.SGM
10AUN1
Agencies
[Federal Register Volume 87, Number 153 (Wednesday, August 10, 2022)]
[Notices]
[Pages 48657-48658]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-17152]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 1892-030; Project No. 1855-050; Project No. 1904-078]
Great River Hydro, LLC; Notice of Settlement Agreement and
Soliciting Comments
Take notice that the following settlement agreement has been filed
with the Commission and is available for public inspection.
a. Type of Application: Settlement Agreement.
b. Project Nos.: 1892-030, 1855-050, and 1904-078.
c. Date filed: August 3, 2022.
d. Applicant: Great River Hydro, LLC (Great River).
e. Name of Projects: Wilder Hydroelectric Project, Bellows Falls
Hydroelectric Project, and Vernon Hydroelectric Project (collectively,
projects).
f. Location: The existing projects are located on the Connecticut
River in the counties of Orange, Windham, and Windsor, Vermont and
Sullivan, Cheshire, and Grafton, New Hampshire. The projects do not
affect federal land.
g. Filed Pursuant to: Rule 602 of the Commission's Rules of
Practice and Procedure, 18 CFR 385.602.
h. Applicant Contact: John Ragonese, FERC License Manager, Great
River Hydro, LLC, 40 Pleasant Street, Suite 202, Portsmouth, NH 03801;
(603) 498-2851 or [email protected].
i. FERC Contact: Steve Kartalia, (202) 502-6131 or
[email protected].
j. Deadline for filing comments: September 2, 2022. Reply comments
due September 17, 2022.
The Commission strongly encourages electronic filing. Please file
comments using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to
6,000 characters,
[[Page 48658]]
without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and
contact information at the end of your comments. For assistance, please
contact FERC Online Support at [email protected], (866) 208-
3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic
filing, you may submit a paper copy. Submissions sent via the U.S.
Postal Service must be addressed to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street NE, Room 1A,
Washington, DC 20426. Submissions sent via any other carrier must be
addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first
page of any filing should include docket numbers P-1892-030, P-1855-
050, and P-1904-078.
The Commission's Rules of Practice require all intervenors filing
documents with the Commission to serve a copy of that document on each
person on the official service list for the project. Further, if an
intervenor files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency.
k. Great River filed the Settlement Agreement on behalf of itself,
the U.S. Fish and Wildlife Service, the New Hampshire Fish and Game
Department, and the Vermont Fish and Wildlife Department. The purpose
of the Settlement Agreement is to resolve, among the signatories,
issues related to fish passage associated with the issuance of any new
licenses and fishway prescriptions under Section 18 of the FPA for the
projects. Specifically, the Settlement Agreement includes proposed
upstream and downstream fish passage facilities, fish passage studies,
and fish passage operational measures. Great River requests that the
Commission consider the Settlement Agreement in its environmental
analyses of the proposed relicense applications, and incorporate the
proposed measures into any new licenses issued.
l. A copy of the settlement agreement may be viewed on the
Commission's website at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number, excluding the last three digits, in the
docket number field to access the document (i.e., P-1892, P-1855, and
P-1904). At this time, the Commission has suspended access to the
Commission's Public Reference Room, due to the proclamation declaring a
National Emergency concerning the Novel Coronavirus Disease (COVID-19),
issued by the President on March 13, 2020. For assistance, contact FERC
Online Support.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
Dated: August 4, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-17152 Filed 8-9-22; 8:45 am]
BILLING CODE 6717-01-P