Village of Enosburg Falls, Vermont; Notice of Intent To Prepare an Environmental Assessment, 50078 [2022-17496]
Download as PDF
50078
Federal Register / Vol. 87, No. 156 / Monday, August 15, 2022 / Notices
Service Agreement Nos. 48 & 49 to be
effective 8/5/2022.
Filed Date: 8/9/22.
Accession Number: 20220809–5054.
Comment Date: 5 p.m. ET 8/30/22.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: August 9, 2022.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2022–17488 Filed 8–12–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2905–035]
Village of Enosburg Falls, Vermont;
Notice of Intent To Prepare an
Environmental Assessment
On April 30, 2021, the Village of
Enosburg Falls, Vermont (Village) filed
a relicense application for the 975kilowatt Enosburg Falls Hydroelectric
Project No. 2905 (project). The project is
located on the Missisquoi River in
Franklin County, Vermont. The project
does not occupy federal land.
In accordance with the Commission’s
regulations, on June 2, 2022,
Commission staff issued a notice that
the project was ready for environmental
analysis (REA Notice). Based on the
information in the record, including
comments filed on the REA Notice, staff
does not anticipate that licensing the
project would constitute a major federal
action significantly affecting the quality
of the human environment. Therefore,
staff intends to prepare an
Environmental Assessment (EA) on the
application to relicense the project.
The EA will be issued and circulated
for review by all interested parties. All
comments filed on the EA will be
analyzed by staff and considered in the
Commission’s final licensing decision.
The application will be processed
according to the following schedule.
Revisions to the schedule may be made
as appropriate.
Milestone
Target date
Commission issues EA ................................................................................................................................................................
Comments on EA .........................................................................................................................................................................
This is a supplemental notice in the
above-referenced proceeding of
Chaparral Springs, LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is August 29,
2022.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
may mail similar pleadings to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426. Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
1 The Council on Environmental Quality’s (CEQ)
regulations under 40 CFR 1501.10(b)(1) require that
EAs be completed within 1 year of the federal
action agency’s decision to prepare an EA. This
notice establishes the Commission’s intent to
prepare an EA for the Enosburg Falls Hydroelectric
Project. Therefore, in accordance with CEQ’s
regulations, the EA must be issued within 1 year of
the issuance date of this notice.
Any questions regarding this notice
may be directed to John Baummer at
(202) 502–6837 or john.baummer@
ferc.gov.
Dated: August 9, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022–17496 Filed 8–12–22; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER22–2622–000]
Chaparral Springs, LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
khammond on DSKJM1Z7X2PROD with NOTICES
February 2023.1
March 2023.
VerDate Sep<11>2014
17:24 Aug 12, 2022
Jkt 256001
PO 00000
Frm 00011
Fmt 4703
Sfmt 4703
E:\FR\FM\15AUN1.SGM
15AUN1
Agencies
[Federal Register Volume 87, Number 156 (Monday, August 15, 2022)]
[Notices]
[Page 50078]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2022-17496]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2905-035]
Village of Enosburg Falls, Vermont; Notice of Intent To Prepare
an Environmental Assessment
On April 30, 2021, the Village of Enosburg Falls, Vermont (Village)
filed a relicense application for the 975-kilowatt Enosburg Falls
Hydroelectric Project No. 2905 (project). The project is located on the
Missisquoi River in Franklin County, Vermont. The project does not
occupy federal land.
In accordance with the Commission's regulations, on June 2, 2022,
Commission staff issued a notice that the project was ready for
environmental analysis (REA Notice). Based on the information in the
record, including comments filed on the REA Notice, staff does not
anticipate that licensing the project would constitute a major federal
action significantly affecting the quality of the human environment.
Therefore, staff intends to prepare an Environmental Assessment (EA) on
the application to relicense the project.
The EA will be issued and circulated for review by all interested
parties. All comments filed on the EA will be analyzed by staff and
considered in the Commission's final licensing decision.
The application will be processed according to the following
schedule. Revisions to the schedule may be made as appropriate.
---------------------------------------------------------------------------
\1\ The Council on Environmental Quality's (CEQ) regulations
under 40 CFR 1501.10(b)(1) require that EAs be completed within 1
year of the federal action agency's decision to prepare an EA. This
notice establishes the Commission's intent to prepare an EA for the
Enosburg Falls Hydroelectric Project. Therefore, in accordance with
CEQ's regulations, the EA must be issued within 1 year of the
issuance date of this notice.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Commission issues EA........................ February 2023.\1\
Comments on EA.............................. March 2023.
------------------------------------------------------------------------
Any questions regarding this notice may be directed to John Baummer
at (202) 502-6837 or [email protected].
Dated: August 9, 2022.
Kimberly D. Bose,
Secretary.
[FR Doc. 2022-17496 Filed 8-12-22; 8:45 am]
BILLING CODE 6717-01-P