Results 151 - 200 of 6,900
Sorted by Date | Sort by Relevance
Kram Hydro 3, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications
Document Number: 2024-00335
Type: Notice
Date: 2024-01-10
Agency: Department of Energy, Federal Energy Regulatory Commission
. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners' express permission. The proposed Emmett Sanders Lock and Dam Hydroelectric
Burlington Electric Department; Notice of Intent To File License Application, Filing of Pre-Application Document (Pad), Commencement of Pre-Filing Process, and Scoping; Request for Comments on the Pad and Scoping Document, and Identification of Issues and Associated Study Requests
Document Number: 2024-00031
Type: Notice
Date: 2024-01-05
Agency: Department of Energy, Federal Energy Regulatory Commission
-filing Process. b. Project No.: 2756-066. c. Date Filed: October 31, 2023. d. Submitted By: Burlington Electric Department (Burlington). e. Name of Project: Chace Mill Hydroelectric Project (Chace Mill Project). f. Location: The project
Appalachian Power Company; Notice of Intent To Prepare an Environmental Assessment
Document Number: 2023-28758
Type: Notice
Date: 2023-12-29
Agency: Department of Energy, Federal Energy Regulatory Commission
Power Company filed an application for a new major license for the 26.1-megawatt, two-development Byllesby-Buck Hydroelectric Project (Byllesby-Buck Project or project; FERC No. 2514). The Byllesby-Buck Project is located on the New River, near
Georgia Power Company; Notice of Intent To Prepare an Environmental Assessment
Document Number: 2023-28698
Type: Notice
Date: 2023-12-28
Agency: Department of Energy, Federal Energy Regulatory Commission
on May 24, 2019, September 6, 2022, September 8, 2022, and November 1, 2023, Georgia Power Company (Georgia Power) filed an application to surrender, decommission, and remove the Langdale Hydroelectric Project No. 2341 and the Riverview Hydroelectric
Central Hudson Gas & Electric Corporation; Notice of Availability of Navigability Report for the Walkill River, Request for Comments, and Notice of Pending Jurisdictional Inquiry
Document Number: 2023-28695
Type: Notice
Date: 2023-12-28
Agency: Department of Energy, Federal Energy Regulatory Commission
determination for the unlicensed Sturgeon Pool and Dashville Hydroelectric Projects. The projects are located on the Wallkill River in Ulster County, New York. In response to FWS's request, Commission staff is investigating the jurisdictional status
Jeffersonville Hydroelectric Co.; Notice of Application for Surrender of Exemption, Soliciting Comments, Motions To Intervene, and Protests and Notice of Effectiveness of Withdrawal of Application To Surrender Exemption
Document Number: 2023-28540
Type: Notice
Date: 2023-12-27
Agency: Department of Energy, Federal Energy Regulatory Commission
.gpo.gov] [FR Doc No: 2023-28540] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 6055-006, 6055-007, 6055-008] Jeffersonville Hydroelectric Co.; Notice of Application for Surrender of Exemption, Soliciting Comments, Motions
KC Brighton LLC; Notice of Application for Surrender of License Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests
Document Number: 2023-28539
Type: Notice
Date: 2023-12-27
Agency: Department of Energy, Federal Energy Regulatory Commission
, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Surrender of License. b. Project No: 3633-044. c. Date Filed: December 29
Cube Yadkin Generation, LLC; Notice of Application for a Non-Capacity Amendment of License Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests
Document Number: 2023-28537
Type: Notice
Date: 2023-12-27
Agency: Department of Energy, Federal Energy Regulatory Commission
, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Non-Capacity Amendment of License. b. Project
Up Property 2, LLC; Notice of Application for Surrender of Exemption Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests
Document Number: 2023-28535
Type: Notice
Date: 2023-12-27
Agency: Department of Energy, Federal Energy Regulatory Commission
, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Application for surrender of exemption. b. Project No: P-7987-016. c. Date
FirstLight CT Housatonic LLC; Notice of Effectiveness of Withdrawal of Application for Amendment of License
Document Number: 2023-28437
Type: Notice
Date: 2023-12-26
Agency: Department of Energy, Federal Energy Regulatory Commission
Light CT Housatonic LLC (licensee) filed an application for non-capacity amendment of the license for the 114.9- megawatt Housatonic River Hydroelectric Project No. 2576. On November 30, 2023, the licensee filed a notice of withdrawal of the amendment
Moretown Hydroelectric, LLC; Notice of Availability of Final Environmental Assessment
Document Number: 2023-28436
Type: Notice
Date: 2023-12-26
Agency: Department of Energy, Federal Energy Regulatory Commission
Doc No: 2023-28436] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 5944-024] Moretown Hydroelectric, LLC; Notice of Availability of Final Environmental Assessment In accordance with the National Environmental
Santa Clara Valley Water District; Notice of Reservoir Drawdown and Operations Plan Amendment Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
Document Number: 2023-28260
Type: Notice
Date: 2023-12-22
Agency: Department of Energy, Federal Energy Regulatory Commission
, Motions To Intervene, and Protests Take notice that the following hydroelectric plan has been filed with the Commission and is available for public inspection: a. Filing Type: Amendment to Reservoir Drawdown and Operations Plan. b. Project
Endangered and Threatened Wildlife and Plants; Threatened Species Status for Coal Darter With Section 4(d) Rule
Document Number: 2023-27873
Type: Proposed Rule
Date: 2023-12-21
Agency: Fish and Wildlife Service, Department of the Interior
or removal of sand and gravel bars (Mettee 2019, pp. 10- 22). Impoundments in the Coosa River Systems for hydroelectric power production were constructed by Alabama Power between the 1920s and 1960s. These impoundments are still in place today
Northern States Power Company; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and Deadline for Submission of Final Amendments
Document Number: 2023-27986
Type: Notice
Date: 2023-12-20
Agency: Department of Energy, Federal Energy Regulatory Commission
and Establishing Procedural Schedule for Relicensing and Deadline for Submission of Final Amendments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type
Appalachian Power Company; Notice of Intent To Prepare an Environmental Assessment
Document Number: 2023-27984
Type: Notice
Date: 2023-12-20
Agency: Department of Energy, Federal Energy Regulatory Commission
(Appalachian) filed an application for a new major license for the 2.4-megawatt Niagara Hydroelectric Project (Niagara Project; FERC No. 2466). The Niagara Project is located on the Roanoke River, in Roanoke County, Virginia. The project is adjacent
Northern States Power Company; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and Deadline for Submission of Final Amendments
Document Number: 2023-27983
Type: Notice
Date: 2023-12-20
Agency: Department of Energy, Federal Energy Regulatory Commission
and Establishing Procedural Schedule for Relicensing and Deadline for Submission of Final Amendments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type
Willimantic Power Corporation; Notice Soliciting Applications
Document Number: 2023-27982
Type: Notice
Date: 2023-12-20
Agency: Department of Energy, Federal Energy Regulatory Commission
), a subsidiary of Enel Green Power North America filed a Notice of Intent (NOI) to file an application for a subsequent license for its Willimantic #2 Hydroelectric Project, No. 8047, pursuant to section 16.19(b)(3) of the [[Page 88060]] Commission
Willimantic Power Corporation; Notice Soliciting Applications
Document Number: 2023-27981
Type: Notice
Date: 2023-12-20
Agency: Department of Energy, Federal Energy Regulatory Commission
), a subsidiary of Enel Green Power North America filed a Notice of Intent (NOI) to file an application for a subsequent license for its Willimantic #1 Hydroelectric Project No. 8051, pursuant to section 16.19(b)(3) of the Commission's regulations.\1
Andrew Peklo III; Notice of Availability of Environmental Assessment
Document Number: 2023-27980
Type: Notice
Date: 2023-12-20
Agency: Department of Energy, Federal Energy Regulatory Commission
of 1969 and the Federal Energy Regulatory Commission's (Commission or FERC) regulations, 18 CFR part 380, Commission staff reviewed Andrew Peklo III's (licensee) application for an amendment of the project license for the Pomperaug Hydroelectric
LinkPast Solutions, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications
Document Number: 2023-27979
Type: Notice
Date: 2023-12-20
Agency: Department of Energy, Federal Energy Regulatory Commission
York. The proposed project would operate with flows below the minimum and above the maximum hydraulic capacities of Erie Boulevard Hydropower, L.P.'s Sewalls Development of the Black River Hydroelectric Project No. P-2569 (Sewalls Development
Eagle Creek Racine Hydro, LLC; Notice of Authorization for Continued Project Operation
Document Number: 2023-27882
Type: Notice
Date: 2023-12-20
Agency: Department of Energy, Federal Energy Regulatory Commission
.gpo.gov] [FR Doc No: 2023-27882] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2570-000] Eagle Creek Racine Hydro, LLC; Notice of Authorization for Continued Project Operation The license for the Racine Hydroelectric
Alabama Power Company; Notice of Authorization for Continued Project Operation
Document Number: 2023-27881
Type: Notice
Date: 2023-12-20
Agency: Department of Energy, Federal Energy Regulatory Commission
.gpo.gov] [FR Doc No: 2023-27881] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2628-000] Alabama Power Company; Notice of Authorization for Continued Project Operation The license for the R.L. Harris Hydroelectric Project
Northern States Power Company; Notice of Authorization for Continued Project Operation
Document Number: 2023-27880
Type: Notice
Date: 2023-12-20
Agency: Department of Energy, Federal Energy Regulatory Commission
.gpo.gov] [FR Doc No: 2023-27880] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2639-000] Northern States Power Company; Notice of Authorization for Continued Project Operation The license for the Cornell Hydroelectric
Alice Falls Hydro, LLC; Notice of Revised Procedural Schedule for Environmental Assessment for the Proposed Project Relicense
Document Number: 2023-27878
Type: Notice
Date: 2023-12-20
Agency: Department of Energy, Federal Energy Regulatory Commission
On September 29, 2021, Alice Falls Hydro, LLC filed an application for a [[Page 88062]] new license to continue to operate and maintain the 2.1-megawatt Alice Falls Hydroelectric Project No. 5867 (Alice Falls Project). On April 24, 2023, Commission staff
Green Mountain Power Corporation; Notice of Revised Procedural Schedule for Environmental Assessment for the Proposed Project Relicense
Document Number: 2023-27992
Type: Notice
Date: 2023-12-20
Agency: Department of Energy, Federal Energy Regulatory Commission
On December 23, 2021, Green Mountain Power Corporation filed an application for a subsequent license to continue to operate and maintain the 275-kilowatt Center Rutland Hydroelectric Project No. 2445 (Center Rutland Project). On April 28, 2023, Commission
Brown Bear II Hydro, Inc.; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments
Document Number: 2023-27750
Type: Notice
Date: 2023-12-18
Agency: Department of Energy, Federal Energy Regulatory Commission
for Licensing and Deadline for Submission of Final Amendments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: New Major License. b. Project
Fiske Hydro, Inc.; Notice Soliciting Pre-Application Documents and Notices of Intent To File a Subsequent License Application
Document Number: 2023-27520
Type: Notice
Date: 2023-12-15
Agency: Federal Energy Regulatory Commission, Department of Energy
Hydro, Inc. (Fiske Hydro), the current licensee for the Fiske Mill Hydroelectric Project No. 8615 (project), filed a Notice of Intent (NOI) to file an application for an exemption from licensing for the project.\1\ The existing license for the project
Presumpscot Hydro LLC and Dichotomy Power Maine LLC; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
Document Number: 2023-27338
Type: Notice
Date: 2023-12-13
Agency: Department of Energy, Federal Energy Regulatory Commission
To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Non-capacity Amendment of License. b. Project Nos: 2942
SV Hydro LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications
Document Number: 2023-27337
Type: Notice
Date: 2023-12-13
Agency: Department of Energy, Federal Energy Regulatory Commission
term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners' express permission. The proposed Coffeeville Hydroelectric
Notice of Inventory Completion: U.S. Department of Agriculture, Forest Service, Sierra National Forest, Clovis, CA
Document Number: 2023-27363
Type: Notice
Date: 2023-12-13
Agency: Department of the Interior, National Park Service
), and CA-FRE-747 (1) on the Sierra National Forest in Fresno County, CA, by Don Wren of Fresno City College (FCC) as part of planning for a proposed hydroelectric project. Sites CA-FRE-613, CA-FRE-682, CA-FRE- 741, and CA-FRE-747 lie in the Sierra Nevada
JBS Rentals, LLC, 5J's LLC; Notice of Transfer of Exemption
Document Number: 2023-27220
Type: Notice
Date: 2023-12-12
Agency: Department of Energy, Federal Energy Regulatory Commission
for the 30-kilowatt Biber Spellenberg Hydroelectric Project No. 6550 from JBS Rentals, LLC to 5J's LLC. The exemption from licensing was originally issued on February 14, 1983.\1\ The project is located on Bidden Creek, Trinity County, California
Indiana Michigan Power Company; Notice of Availability of Environmental Assessment
Document Number: 2023-27228
Type: Notice
Date: 2023-12-12
Agency: Department of Energy, Federal Energy Regulatory Commission
Hydroelectric Project (project). The project is located on the St. Joseph River, in the Village of Constantine, in St. Joseph County, Michigan. Commission staff has prepared an Environmental Assessment (EA) for the project. The EA contains the staff
T.A. Keck III and H.S. Keck; Notice of Authorization for Continued Project Operation
Document Number: 2023-27227
Type: Notice
Date: 2023-12-12
Agency: Department of Energy, Federal Energy Regulatory Commission
Doc No: 2023-27227] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 11426-000] T.A. Keck III and H.S. Keck; Notice of Authorization for Continued Project Operation The license for the Blackstone Mill Hydroelectric
Briar Hydro Associates, LLC; Notice Soliciting Scoping Comments
Document Number: 2023-27226
Type: Notice
Date: 2023-12-12
Agency: Department of Energy, Federal Energy Regulatory Commission
that the following hydroelectric applications have been filed with the Commission and is available for public inspection. a. Type of Applications: New License. b. Project Nos.: P-3240-040, P-6689-018, and P-3342-025. c. Date Filed: November 30, 2022
Endangered and Threatened Wildlife; 90-Day Finding on a Petition To List Chinook Salmon on the Washington Coast as Threatened or Endangered Under the Endangered Species Act
Document Number: 2023-26852
Type: Proposed Rule
Date: 2023-12-07
Agency: Department of Commerce, National Oceanic and Atmospheric Administration
by Tacoma Power for hydroelectric energy in 1994. A FERC permit was issued for the dam in 1987, at which time there were no federally listed species. Tacoma Power operates a fish collection facility downstream, but the Petitioners assert
Town of Rollinsford, New Hampshire; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
Document Number: 2023-26646
Type: Notice
Date: 2023-12-05
Agency: Department of Energy, Federal Energy Regulatory Commission
, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Non-Capacity License Amendment. b. Project No: 3777-019. c. Date Filed: June
Fall River Rural Electric Cooperative, Inc.; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests
Document Number: 2023-26645
Type: Notice
Date: 2023-12-05
Agency: Department of Energy, Federal Energy Regulatory Commission
Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: New Major License. b. Project No.: 5089-027. c. Date Filed: August 31, 2021. d
Sam Rayburn Dam Power Rate
Document Number: 2023-26629
Type: Notice
Date: 2023-12-05
Agency: Department of Energy, Southwestern Power Administration
with investments and replacements in the Corps hydroelectric generating facility. Southwestern prepared a 2023 Revised Power Repayment Study to address the revenue shortfall and inform development of the proposed rate schedule. The 2023 Revised Power Repayment
SOLIA 1 Hydroelectric LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications
Document Number: 2023-26386
Type: Notice
Date: 2023-12-01
Agency: Department of Energy, Federal Energy Regulatory Commission
No: 2023-26386] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 15328-000] SOLIA 1 Hydroelectric LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing
Yuba County Water Agency; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments
Document Number: 2023-26461
Type: Notice
Date: 2023-12-01
Agency: Department of Energy, Federal Energy Regulatory Commission
Schedule for Licensing and Deadline for Submission of Final Amendments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: New Major License
Georgia Power Company; Notice of Availability of Environmental Assessment
Document Number: 2023-26240
Type: Notice
Date: 2023-11-29
Agency: Department of Energy, Federal Energy Regulatory Commission
of 1969 and the Federal Energy Regulatory Commission's (Commission) regulations, 18 CFR part 380, the Office of Energy Projects has reviewed the application for a new license to continue to operate and maintain the Lloyd Shoals Hydroelectric Project
City of Nashua, New Hampshire; Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions
Document Number: 2023-26165
Type: Notice
Date: 2023-11-28
Agency: Department of Energy, Federal Energy Regulatory Commission
30, 2021. d. Applicant: City of Nashua (Nashua). e. Name of Project: Mine Falls Hydroelectric Project. f. Location: The existing project is located on the Nashua River in Hillsborough County, New Hampshire. The project does not affect
Notice of Lodging of Proposed Consent Decree Under the Clean Water Act
Document Number: 2023-26150
Type: Notice
Date: 2023-11-28
Agency: Department of Justice
from Electron Hydro, LLC's, and Thom A. Fischer's (``Defendants'') construction activity at a hydroelectric facility on the Puyallup River in Pierce County, Washington, including illegal discharges into waters of the United States and violations of U
Salt Lake City Area Integrated Projects and Colorado River Storage Project-Rate Order No. WAPA-206
Document Number: 2023-26049
Type: Notice
Date: 2023-11-27
Agency: Department of Energy, Western Area Power Administration
rate in excess of reasonably anticipated levels of Sustainable Hydroelectric Power (``SHP''), DSA, and the CROD, over portions of the forecast period thus restricting the transmission capacity from being offered to others to enable renewable
Andro Hydro, LLC; Notice of Application for Amendment of License, Soliciting Comments, Motions To Intervene, and Protests
Document Number: 2023-25974
Type: Notice
Date: 2023-11-24
Agency: Department of Energy, Federal Energy Regulatory Commission
that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Application for non-capacity amendment of license. b. Project No.: 2375-124. c. Date Filed: June 20, 2023. d
Tallassee Shoals, LLC; Notice of Authorization for Continued Project Operation
Document Number: 2023-25972
Type: Notice
Date: 2023-11-24
Agency: Department of Energy, Federal Energy Regulatory Commission
Doc No: 2023-25972] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 6951-000] Tallassee Shoals, LLC; Notice of Authorization for Continued Project Operation The license for the Tallassee Shoals Hydroelectric Project
Indiana Michigan Power Company; Notice of Authorization for Continued Project Operation
Document Number: 2023-25970
Type: Notice
Date: 2023-11-24
Agency: Department of Energy, Federal Energy Regulatory Commission
Hydroelectric Project No. 10661 was issued for a period ending September 30, 2023. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the Commission, at the expiration of a license term, to issue from year-to- year an annual license
Alice Falls Hydro, LLC; Notice of Authorization for Continued Project Operation
Document Number: 2023-25966
Type: Notice
Date: 2023-11-24
Agency: Department of Energy, Federal Energy Regulatory Commission
Doc No: 2023-25966] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 5867-000] Alice Falls Hydro, LLC; Notice of Authorization for Continued Project Operation The license for the Alice Falls Hydroelectric Project
Ampersand Christine Falls Hydro, LLC; Notice of Authorization for Continued Project Operation
Document Number: 2023-25963
Type: Notice
Date: 2023-11-24
Agency: Department of Energy, Federal Energy Regulatory Commission
Hydroelectric Project No. 4639 was issued for a period ending September 30, 2023. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the Commission, at the expiration of a license term, to issue from year-to- year an annual license
KEI (Maine) Power Management (II) LLC; Notice of Authorization for Continued Project Operation
Document Number: 2023-25961
Type: Notice
Date: 2023-11-24
Agency: Department of Energy, Federal Energy Regulatory Commission
Hydroelectric Project No. 4202 was issued for a period ending September 30, 2023. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the Commission, at the expiration of a license term, to issue from year-to- year an annual license
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.