SOLIA 1 Hydroelectric LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 83932 [2023-26386]
Download as PDF
83932
Federal Register / Vol. 88, No. 230 / Friday, December 1, 2023 / Notices
r. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Dated: November 27, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–26461 Filed 11–30–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 15328–000]
lotter on DSK11XQN23PROD with NOTICES1
SOLIA 1 Hydroelectric LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On October 18, 2023, SOLIA 1
Hydroelectric LLC., filed an application
for a preliminary permit, pursuant to
section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility
of hydropower project located to be
located at the U.S. Army Corps of
Engineers’ (Corps) A.I. Selden Lock and
Dam near the City of Eutaw, Greene
County, Alabama. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed A.I. Selden
Hydroelectric Project would consist of
the following: (1) a headrace channel
and intake structure with four, 31-footwide, 39-foot-high trash racks with 8.3inch bar spacing; (2) a 93-foot-long, 158foot-wide, 83-foot-high concrete
powerhouse located on the south west
bank of the river at the existing Corps
dam’s right abutment containing four
Kaplan bulb turbine-generator units
with a total capacity of 22.4 megawatts;
(3) four, 70-foot-long, 198-foot-wide, 73foot-high draft tubes that would convey
water from the turbines to the tailrace;
(4) a 495-foot-long, 495-foot-wide riprap
lined tailrace; (5) a 100-foot-long, 100foot-wide switchyard; and (6) a 2.2mile-long, 115 kilovolt transmission
line. The proposed project would have
an estimated annual generation of 145.5
megawatt-hours.
Applicant Contact: Douglas
Spaulding, Nelson Energy, 1030 Tyrol
VerDate Sep<11>2014
18:47 Nov 30, 2023
Jkt 262001
Trail, Suite 101, Minneapolis, MN
55416; phone: (612) 599–8493.
FERC Contact: Michael Spencer;
phone: (202) 502–6093, or by email at
michael.spencer@ferc.gov.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
ferconline.ferc.gov/eFiling.aspx.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://ferconline.ferc.gov/
QuickComment.aspx. You must include
your name and contact information at
the end of your comments. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, you may submit a
paper copy. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852. The first page of any filing
should include docket number
P–15328–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s website at
https://elibrary.ferc.gov/eLibrary/search.
Enter the docket number (P–15328) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: November 24, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–26386 Filed 11–30–23; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP24–17–000]
Columbia Gas Transmission, LLC;
Notice of Request Under Blanket
Authorization and Establishing
Intervention and Protest Deadline
Take notice that on November 16,
2023, Columbia Gas Transmission, LLC
(Columbia), 700 Louisiana Street, Suite
1300, Houston, Texas 77002–2700, filed
in the above referenced docket, a prior
notice request pursuant to sections
157.205, 157.208, and 157.216 of the
Commission’s regulations under the
Natural Gas Act (NGA), and Columbia’s
blanket certificate issued in Docket No.
CP83–76–000, for authorization to
modify the existing Line D322 pipeline
at various locations, including the
installation of two bi-directional
launching and receiving stations for inline inspection devices, and abandoning
approximately 8 miles of its 12-inch
diameter Line D322. All of the above
facilities are located in Morrow, Marion,
Hardin, and Allen Counties, Ohio (Line
D322 West ILI Project). The project will
allow Columbia to perform installations
and activities to enable bi-directional inline inspection, or pigging, as well as
abandon a section of its Line D322. The
estimated cost for the project is 28.7
million, all as more fully set forth in the
request which is on file with the
Commission and open to public
inspection.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page
(www.ferc.gov) using the ‘‘eLibrary’’
link. Enter the docket number excluding
the last three digits in the docket
number field to access the document. At
this time, the Commission has
suspended access to the Commission’s
Public Reference Room. For assistance,
contact the Federal Energy Regulatory
Commission at FercOnlineSupport@
ferc.gov or call toll-free, (886) 208–3676
or TTY (202) 502–8659.
Any questions concerning this request
should be directed to David A. Alonzo,
Manager, Project Authorizations,
Columbia Gas Transmission, LLC, 700
Louisiana Street, Suite 1300, Houston,
Texas 77002–2700, at (832) 320–5477 or
david_alonzo@tcenergy.com.
E:\FR\FM\01DEN1.SGM
01DEN1
Agencies
[Federal Register Volume 88, Number 230 (Friday, December 1, 2023)]
[Notices]
[Page 83932]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-26386]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 15328-000]
SOLIA 1 Hydroelectric LLC; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
On October 18, 2023, SOLIA 1 Hydroelectric LLC., filed an
application for a preliminary permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to study the feasibility of
hydropower project located to be located at the U.S. Army Corps of
Engineers' (Corps) A.I. Selden Lock and Dam near the City of Eutaw,
Greene County, Alabama. The sole purpose of a preliminary permit, if
issued, is to grant the permit holder priority to file a license
application during the permit term. A preliminary permit does not
authorize the permit holder to perform any land-disturbing activities
or otherwise enter upon lands or waters owned by others without the
owners' express permission.
The proposed A.I. Selden Hydroelectric Project would consist of the
following: (1) a headrace channel and intake structure with four, 31-
foot-wide, 39-foot-high trash racks with 8.3-inch bar spacing; (2) a
93-foot-long, 158-foot-wide, 83-foot-high concrete powerhouse located
on the south west bank of the river at the existing Corps dam's right
abutment containing four Kaplan bulb turbine-generator units with a
total capacity of 22.4 megawatts; (3) four, 70-foot-long, 198-foot-
wide, 73-foot-high draft tubes that would convey water from the
turbines to the tailrace; (4) a 495-foot-long, 495-foot-wide riprap
lined tailrace; (5) a 100-foot-long, 100-foot-wide switchyard; and (6)
a 2.2-mile-long, 115 kilovolt transmission line. The proposed project
would have an estimated annual generation of 145.5 megawatt-hours.
Applicant Contact: Douglas Spaulding, Nelson Energy, 1030 Tyrol
Trail, Suite 101, Minneapolis, MN 55416; phone: (612) 599-8493.
FERC Contact: Michael Spencer; phone: (202) 502-6093, or by email
at [email protected].
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://ferconline.ferc.gov/eFiling.aspx. Commenters can submit brief comments
up to 6,000 characters, without prior registration, using the eComment
system at https://ferconline.ferc.gov/QuickComment.aspx. You must
include your name and contact information at the end of your comments.
For assistance, please contact FERC Online Support at
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, you may submit a paper copy.
Submissions sent via the U.S. Postal Service must be addressed to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington, DC 20426. Submissions sent via
any other carrier must be addressed to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville,
Maryland 20852. The first page of any filing should include docket
number P-15328-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of the
Commission's website at https://elibrary.ferc.gov/eLibrary/search.
Enter the docket number (P-15328) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: November 24, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-26386 Filed 11-30-23; 8:45 am]