ALLETE, Inc.; Notice of Waiver of Water Quality Certification
Document Number: 2024-03168
Type: Notice
Date: 2024-02-15
Agency: Department of Energy, Federal Energy Regulatory Commission
for a license for the Grand Rapids Hydroelectric Project in the above captioned docket. On December 14, 2022, Minnesota Pollution Control Agency received a complete request for a Clean Water Act section 401(a)(1) water quality certification from ALLETE
Erie Boulevard Hydropower, L.P.; Notice of Settlement Agreement and Soliciting Comments
Document Number: 2024-03053
Type: Notice
Date: 2024-02-14
Agency: Department of Energy, Federal Energy Regulatory Commission
). e. Name of Project: West Canada Creek Hydroelectric Project (West Canada Creek Project). f. Location: The existing project is located on West Canada Creek, a tributary of the Mohawk River, in the counties of Oneida and Herkimer, New York
Idaho Power Company; Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions
Document Number: 2024-02921
Type: Notice
Date: 2024-02-13
Agency: Department of Energy, Federal Energy Regulatory Commission
and Conditions, and Prescriptions Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: New Major License. b. Project No.: 2736-046. c. Date
Marlow Hydro, LLC; Notice of Intent To File License Application and Setting Deadline To File Final License Application
Document Number: 2024-02814
Type: Notice
Date: 2024-02-12
Agency: Department of Energy, Federal Energy Regulatory Commission
Dam Hydroelectric Project (Nash Mill Project). f. Location: On the Ashuelot River, near the town of Marlow, Cheshire County, New Hampshire. g. Filed Pursuant to: 18 CFR 5.5 and 385.216 of the Commission's regulations. Marlow Hydro filed
City of Aspen, Colorado; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process
Document Number: 2024-02718
Type: Notice
Date: 2024-02-09
Agency: Department of Energy, Federal Energy Regulatory Commission
of Aspen, Colorado. e. Name of Project: Maroon Creek Hydroelectric Project. f. Location: On Maroon Creek in Pitkin County, Colorado. g. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations. h. Potential Applicant Contact: Phil
City of Portland; Notice of Intent To File License Application, Filing of Pre-Application Document (PAD), Commencement of ILP Pre-Filing Process, and Scoping; Request for Comments on the PAD and Scoping Document, and Identification of Issues and Associated Study Requests
Document Number: 2024-02717
Type: Notice
Date: 2024-02-09
Agency: Department of Energy, Federal Energy Regulatory Commission
-filing Licensing Process. b. Project No.: 2821-014. c. Dated Filed: December 8, 2023. d. Submitted By: City of Portland, Portland Water Bureau. e. Name of Project: Portland Hydroelectric Project. f. Location: The project is located on the Bull
Combined Notice of Filings #1
Document Number: 2024-02608
Type: Notice
Date: 2024-02-08
Agency: Department of Energy, Federal Energy Regulatory Commission
, Jackpot Holdings, LLC, Ledyard Windpower, LLC, AM Wind Repower LLC, TerraForm IWG Acquisition Holdings II, LLC, Mesa Wind Power LLC, Evolugen Trading and Marketing LP, Bitter Ridge Wind Farm, LLC, Catalyst Old River Hydroelectric Limited Partnership
Eagle Creek Schoolfield Hydro, LLC, City of Danville; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests
Document Number: 2024-02605
Type: Notice
Date: 2024-02-08
Agency: Department of Energy, Federal Energy Regulatory Commission
and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: New Major License. b. Project No.: 2411-030. c. Date filed: July 29, 2022
Beaver Falls Municipal Authority; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests
Document Number: 2024-02465
Type: Notice
Date: 2024-02-07
Agency: Department of Energy, Federal Energy Regulatory Commission
notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: New Major License. b. Project No.: 3451-047. c. Date filed: August 1, 2022.\1\ \1
Combined Notice of Filings #2
Document Number: 2024-02380
Type: Notice
Date: 2024-02-06
Agency: Department of Energy, Federal Energy Regulatory Commission
Numbers: ER24-1097-000. Applicants: Catalyst Old River Hydroelectric Limited Partnership. Description: Compliance filing: Revised Market-Based Rate Tariff to be effective 2/1/2024. Filed Date: 1/31/24. Accession Number: 20240131
Southern California Edison Company; Notice of Intent To Prepare an Environmental Assessment
Document Number: 2024-02194
Type: Notice
Date: 2024-02-05
Agency: Department of Energy, Federal Energy Regulatory Commission
16, 2023, Southern California Edison Company (SCE or licensee) filed an application to surrender its license and decommission the Borel Hydroelectric Project No. 382. The project is located on the Kern River, in the City of Bodfish in Kern County
PacifiCorp; Notice of Intent To Prepare an Environmental Assessment
Document Number: 2024-02193
Type: Notice
Date: 2024-02-05
Agency: Department of Energy, Federal Energy Regulatory Commission
an application for a non-capacity amendment for the Weber Hydroelectric Project No. 1744. The project is located on the Weber River in Davis, Morgan and Weber Counties, Utah. The project occupies Federal lands managed by the U.S. Forest Service, administered
Seattle City Light; Notice of Intent To Prepare an Environmental Assessment and Notice of Revised Schedule
Document Number: 2024-02192
Type: Notice
Date: 2024-02-05
Agency: Department of Energy, Federal Energy Regulatory Commission
, and supplemented on February 14 and December 12, 2022, and April 10 and October 24, 2023, Seattle City Light filed an application for surrender of license for the Newhalem Creek Hydroelectric Project No. 2705. The project is located on Newhalem Creek in Whatcom
STS Hydropower, LLC; Notice of Intent To Prepare an Environmental Assessment
Document Number: 2024-02099
Type: Notice
Date: 2024-02-02
Agency: Department of Energy, Federal Energy Regulatory Commission
, 2023, STS Hydropower, LLC (licensee) filed an application to surrender its license for the Kanaka Hydroelectric Project No. 7242. The project is located on Sucker Run Creek, in Butte County, California. The project does not occupy any federal lands
Town of South Hill, Virginia; Notice of Intent To Prepare an Environmental Assessment
Document Number: 2024-02098
Type: Notice
Date: 2024-02-02
Agency: Department of Energy, Federal Energy Regulatory Commission
(exemptee) filed an application to surrender its exemption from licensing for the Whittles Mill Dam Hydroelectric Project No. 7630. The project is located on the Meherrin River in the Town of South Hill in Mecklenburg County, Virginia. The project does
Pacific Gas & Electric Company; Notice of Intent To Prepare an Environmental Assessment
Document Number: 2024-02103
Type: Notice
Date: 2024-02-02
Agency: Department of Energy, Federal Energy Regulatory Commission
on October 2, 2023, and December 1, 2023, Pacific Gas & Electric Company (PG&E or licensee) filed an application for a non-capacity amendment for the Battle Creek Hydroelectric Project No. 1121. The project is located on the mainstem Battle Creek
Lakeport Hydroelectric One, LLC and New Hampshire Department of Environmental Services; Notice of Intent To Prepare an Environmental Assessment
Document Number: 2024-02100
Type: Notice
Date: 2024-02-02
Agency: Department of Energy, Federal Energy Regulatory Commission
No: 2024-02100] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 6440-010] Lakeport Hydroelectric One, LLC and New Hampshire Department of Environmental Services; Notice of Intent To Prepare an Environmental Assessment
Dominion Energy South Carolina, Inc.; Notice of Availability of Final Environmental Assessment
Document Number: 2024-02029
Type: Notice
Date: 2024-02-01
Agency: Department of Energy, Federal Energy Regulatory Commission
of Project Lands and Waters of the Saluda Hydroelectric Project No. 516 and have prepared an Environmental Assessment (EA) for a proposed water withdraw. The licensee proposes to allow the City of West Columbia, South Carolina (City), the use of Saluda
York Haven Power Company, LLC; Notice of Intent To Prepare an Environmental Assessment
Document Number: 2024-02028
Type: Notice
Date: 2024-02-01
Agency: Department of Energy, Federal Energy Regulatory Commission
and 20, 2023, York Haven Power Company, LLC filed an application for a non-capacity amendment for the York Haven Hydroelectric Project No. 1888. The project is located on the Susquehanna River in Lancaster and York counties, Pennsylvania. The project
Energy Stream, LLC; Notice of Intent To Prepare an Environmental Assessment
Document Number: 2024-02027
Type: Notice
Date: 2024-02-01
Agency: Department of Energy, Federal Energy Regulatory Commission
an application for a subsequent license for the 512-kilowatt M.S.C. Hydroelectric Project (M.S.C. Project or project; FERC No. 5679). The M.S.C. Project is located on the Quinebaug River, in Windham County, Connecticut. In accordance with the Commission
PE Hydro Generation, LLC; Notice of Application for Amendment of License Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests
Document Number: 2024-01842
Type: Notice
Date: 2024-01-31
Agency: Department of Energy, Federal Energy Regulatory Commission
, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Temporary amendment under Article 403 and water quality certification condition
PacifiCorp; Notice of Intent To Prepare an Environmental Assessment
Document Number: 2024-01840
Type: Notice
Date: 2024-01-31
Agency: Department of Energy, Federal Energy Regulatory Commission
for a non- capacity amendment for the Bear River Hydroelectric Project No. 20 and an application for surrender of the conduit exemption for the Paris Hydroelectric Project No. 703. The Bear River Project is located on Bear River in Franklin and Caribou
Consolidated Hydro New York, LLC; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests
Document Number: 2024-01837
Type: Notice
Date: 2024-01-31
Agency: Department of Energy, Federal Energy Regulatory Commission
notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: New Major License. b. Project No.: 7153-018. c. Date filed: April 29, 2022. d
Woodland Pulp, LLC; Notice of Application for Surrender of License Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests
Document Number: 2024-01903
Type: Notice
Date: 2024-01-31
Agency: Department of Energy, Federal Energy Regulatory Commission
, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Surrender of License. b. Project No: 2660-038. c. Date Filed: October 31
Consumers Energy Company; Notice of Intent To Prepare an Environmental Assessment
Document Number: 2024-01731
Type: Notice
Date: 2024-01-30
Agency: Department of Energy, Federal Energy Regulatory Commission
, March 17, 2023, and August 8, 2023, Consumers Energy Company (licensee), licensee for the Hardy Hydroelectric Project No. 2452 (project) filed an application for a non-capacity license amendment. The project is located on the Muskegon River in Newago
Empire District Electric Company; Notice of Intent To Prepare an Environmental Assessment
Document Number: 2024-01638
Type: Notice
Date: 2024-01-29
Agency: Department of Energy, Federal Energy Regulatory Commission
Company (Empire District) filed an application for a new major license to continue operating the existing, 16-megawatt Ozark Beach Hydroelectric Project No. 2221 (Ozark Beach Project). Empire District filed an amended application on August 28, 2020
Georgia Power Company; Notice of Authorization for Continued Project Operation
Document Number: 2024-01637
Type: Notice
Date: 2024-01-29
Agency: Department of Energy, Federal Energy Regulatory Commission
No: 2024-01637] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2341-000] Georgia Power Company; Notice of Authorization for Continued Project Operation The license for the Langdale Hydroelectric Project No. 2341
Georgia Power Company; Notice of Authorization for Continued Project Operation
Document Number: 2024-01636
Type: Notice
Date: 2024-01-29
Agency: Department of Energy, Federal Energy Regulatory Commission
No: 2024-01636] [[Page 5527]] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2350-000] Georgia Power Company; Notice of Authorization for Continued Project Operation The license for the Riverview Hydroelectric Project
Brainerd Public Utilities; Notice of Availability of Environmental Assessment
Document Number: 2024-01635
Type: Notice
Date: 2024-01-29
Agency: Department of Energy, Federal Energy Regulatory Commission
and the Federal Energy Regulatory Commission's (Commission) regulations, 18 CFR part 380, the Office of Energy Projects has reviewed the application for a new license to continue to operate and maintain the Brainerd Hydroelectric Project (project). The project
Falcon and Amistad Projects-Rate Order No. WAPA-216
Document Number: 2024-01587
Type: Notice
Date: 2024-01-26
Agency: Department of Energy, Western Area Power Administration
.wapa.gov/about-wapa/regions/crsp/rates/amistad-history. The formula rate calculates the amount WAPA must annually repay to the Department of the Treasury for the United States' investment in the Falcon and Amistad hydroelectric facilities, with interest, as well as associated operation, maintenance
Briar Hydro Associates, LLC; Notice of Waiver Period for Water Quality Certification Application
Document Number: 2024-01469
Type: Notice
Date: 2024-01-25
Agency: Department of Energy, Federal Energy Regulatory Commission
Doc No: 2024-01469] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 3240-040New Hampshire Rolfe Canal Hydroelectric Project; Project No. 6689-018New Hampshire Penacook Upper Falls Hydroelectric Project; Project No. 3342
Tallassee Shoals, LLC; Notice of Availability of Environmental Assessment
Document Number: 2024-01468
Type: Notice
Date: 2024-01-25
Agency: Department of Energy, Federal Energy Regulatory Commission
of 1969 and the Federal Energy Regulatory Commission's (Commission) regulations, 18 CFR part 380, the Office of Energy Projects has reviewed the application for a new license to continue to operate and maintain the Tallassee Shoals Hydroelectric
ALLETE, Inc.; Notice of Availability of Environmental Assessment
Document Number: 2024-01144
Type: Notice
Date: 2024-01-23
Agency: Department of Energy, Federal Energy Regulatory Commission
Energy Regulatory Commission's (Commission) regulations, 18 CFR part 380, the Office of Energy Projects has reviewed the application for a subsequent license to continue to operate and maintain the Prairie River Hydroelectric Project (project
ALLETE, Inc.; Notice of Availability of Environmental Assessment
Document Number: 2024-01143
Type: Notice
Date: 2024-01-23
Agency: Department of Energy, Federal Energy Regulatory Commission
and the Federal Energy Regulatory Commission's (Commission) regulations, 18 CFR part 380, the Office of Energy Projects has reviewed the application for a new license to continue to operate and maintain the Grand Rapids Hydroelectric Project (project
PE Hydro Generation, LLC; Notice of Authorization for Continued Project Operation
Document Number: 2024-01142
Type: Notice
Date: 2024-01-23
Agency: Department of Energy, Federal Energy Regulatory Commission
No: 2024-01142] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2391-000] PE Hydro Generation, LLC; Notice of Authorization for Continued Project Operation The license for the Warren Hydroelectric Project No. 2391
PE Hydro Generation, LLC; Notice of Authorization for Continued Project Operation
Document Number: 2024-01141
Type: Notice
Date: 2024-01-23
Agency: Department of Energy, Federal Energy Regulatory Commission
.gpo.gov] [FR Doc No: 2024-01141] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2425-000] PE Hydro Generation, LLC; Notice of Authorization for Continued Project Operation The license for the Luray and Newport Hydroelectric
PE Hydro Generation, LLC; Notice of Authorization for Continued Project Operation
Document Number: 2024-01140
Type: Notice
Date: 2024-01-23
Agency: Department of Energy, Federal Energy Regulatory Commission
No: 2024-01140] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2509-000] PE Hydro Generation, LLC; Notice of Authorization for Continued Project Operation The license for the Shenandoah Hydroelectric Project No. 2509
Kaukauna Utilities; Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions
Document Number: 2024-01139
Type: Notice
Date: 2024-01-23
Agency: Department of Energy, Federal Energy Regulatory Commission
, and Prescriptions Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: New Major License. b. Project No.: 2715-026. c. Date Filed: July 22, 2022
Hydro Technology, Inc.; Notice of Intent To Prepare an Environmental Assessment
Document Number: 2024-01262
Type: Notice
Date: 2024-01-23
Agency: Department of Energy, Federal Energy Regulatory Commission
an application for a subsequent license to continue operating the existing 1,200- kilowatt Meyers Falls Hydroelectric Project No. 2544 (Meyers Falls Project or project). The project is located on the Colville River in Stevens County, Washington. The project
NorthWestern Energy; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments
Document Number: 2024-01037
Type: Notice
Date: 2024-01-19
Agency: Department of Energy, Federal Energy Regulatory Commission
and Deadline for Submission of Final Amendments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: New Major License. b. Project No.: 1869
Triton Power Company; Notice Soliciting Applications
Document Number: 2024-01036
Type: Notice
Date: 2024-01-19
Agency: Department of Energy, Federal Energy Regulatory Commission
Hydroelectric Project No. 5698 (project), filed a Notice of Intent (NOI) to file an application for a new license for the project pursuant to section 15(b)(1) of the Federal Power Act (FPA).\1\ On February 26, 2021, Commission staff issued public notice
PacifiCorp; Notice of Availability of Executed Programmatic Agreement for the Weber Hydroelectric Project
Document Number: 2024-01035
Type: Notice
Date: 2024-01-19
Agency: Department of Energy, Federal Energy Regulatory Commission
Doc No: 2024-01035] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 1744-041] PacifiCorp; Notice of Availability of Executed Programmatic Agreement for the Weber Hydroelectric Project Take notice that on November 2
Green Mountain Power Corporation; Notice of Authorization for Continued Project Operation
Document Number: 2024-00769
Type: Notice
Date: 2024-01-17
Agency: Department of Energy, Federal Energy Regulatory Commission
Hydroelectric Project No. 2445 was issued for a period ending December 31, 2023. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the Commission, at the expiration of a license term, to issue from year-to- year an annual license
South Sutter Water District; Notice of Material Amendment of License Application, Soliciting Comments and Associated Study Requests
Document Number: 2024-00768
Type: Notice
Date: 2024-01-17
Agency: Department of Energy, Federal Energy Regulatory Commission
On July 1, 2019, South Sutter Water District (SSWD) filed, pursuant to sections 4(e) and 15 of the Federal Power Act, an application for a new major license to continue operating the Camp Far West Hydroelectric Project No. 2997 (Camp Far West Project
Grand River Dam Authority; Notice of Availability of Environmental Assessment
Document Number: 2024-00597
Type: Notice
Date: 2024-01-16
Agency: Department of Energy, Federal Energy Regulatory Commission
Hydroelectric Project No. 1494 and have prepared an Environmental Assessment (EA) for the proposed amendment. GRDA proposes to acquire, develop, and manage a 540-acre tract of land known as the Coal Creek Wildlife Management Area (WMA) and include these lands
ALLETE, Inc; Notice of Authorization for Continued Project Operation
Document Number: 2024-00604
Type: Notice
Date: 2024-01-16
Agency: Department of Energy, Federal Energy Regulatory Commission
No: 2024-00604] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2361-000] ALLETE, Inc; Notice of Authorization for Continued Project Operation The license for the Prairie River Hydroelectric Project No. 2361 was issued
ALLETE, Inc.; Notice of Authorization for Continued Project Operation
Document Number: 2024-00603
Type: Notice
Date: 2024-01-16
Agency: Department of Energy, Federal Energy Regulatory Commission
.gpo.gov] [FR Doc No: 2024-00603] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2362-000] ALLETE, Inc.; Notice of Authorization for Continued Project Operation The license for the Grand Rapids Hydroelectric Project No. 2362
Ketchikan Public Utilities; Notice of Intent To Prepare an Environmental Assessment
Document Number: 2024-00421
Type: Notice
Date: 2024-01-11
Agency: Department of Energy, Federal Energy Regulatory Commission
(KPU) filed an application for a new major license for the 7.1-megawatt Beaver Falls Hydroelectric Project (Beaver Falls Project; FERC No. 1922). The Beaver Falls Project is located on Beaver Falls Creek in Ketchikan Gateway Borough, Alaska
Georgia Power Company; Notice of Authorization for Continued Project Operation
Document Number: 2024-00420
Type: Notice
Date: 2024-01-11
Agency: Department of Energy, Federal Energy Regulatory Commission
.gpo.gov] [FR Doc No: 2024-00420] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2336-000] Georgia Power Company; Notice of Authorization for Continued Project Operation The license for the Lloyd Shoals Hydroelectric Project
Hydro Technology Systems; Notice of Authorization for Continued Project Operation
Document Number: 2024-00337
Type: Notice
Date: 2024-01-10
Agency: Department of Energy, Federal Energy Regulatory Commission
.gpo.gov] [FR Doc No: 2024-00337] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2544-000] Hydro Technology Systems; Notice of Authorization for Continued Project Operation The license for the Meyers Falls Hydroelectric
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.