Results 351 - 400 of 6,884
Sorted by Date | Sort by Relevance
Boott Hydropower, LLC; Notice of Authorization for Continued Project Operation
-11242]
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2790-000]
Boott Hydropower, LLC; Notice of Authorization for Continued
Project Operation
The license for the Lowell Hydroelectric Project No. 2790 was
issued for a period ending
Town of Bedford, Virginia; Notice of Authorization for Continued Project Operation
-11238]
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 5596-000]
Town of Bedford, Virginia; Notice of Authorization for Continued
Project Operation
The license for the Bedford Hydroelectric Project No. 5596 was
issued for a period
Credit Assistance and Related Fees for Water Resources Infrastructure Projects
appropriated $553,600,000 until expended for EPAct 2005 Section 247:
Maintaining and Enhancing Hydroelectricity Incentives to the US
Department of Energy (DOE) for making incentive payments to owners and
authorized operators of qualified hydroelectric
Solar and Battery Programmatic Environmental Impact Statement
of this
mission is the generation, transmission, and sale of reliable and
affordable electric energy. As part of its diversified energy strategy,
TVA produces or obtains electricity from a diverse portfolio of energy
sources, including solar, hydroelectric
Pumped Storage Hydro Programmatic Environmental Impact Statement
review can then be relied upon when
agencies make decisions based on the programmatic EIS, as well as
decisions based on a subsequent (also known as tiered) NEPA review.
Background
PSH is a type of hydroelectric energy storage that consists of two
Integrated Resource Plan and Environmental Impact Statement
of the power it
distributes with three nuclear plants, five coal-fired plants, nine
simple-cycle combustion turbine plants, eight combined-cycle combustion
turbine plants, 29 hydroelectric dams, a pumped-storage facility, a
diesel-fired facility, and 13
Pipeline Safety: Gas Pipeline Leak Detection and Repair
of the Interior`s Bureau of Reclamation proposed
significant cuts to water allocations from the Colorado River to
Arizona, Nevada, and Mexico in order to ensure continued operation of
hydroelectric generation facilities.\33\ In late June and early July of
2021
Kaukauna Utilities; Notice Soliciting Scoping Comments
Doc No: 2023-10514]
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2715-026]
Kaukauna Utilities; Notice Soliciting Scoping Comments
Take notice that the following hydroelectric application has been
filed
Village of Enosburg Falls, Vermont; Notice of Authorization for Continued Project Operation
Hydroelectric Project No. 2905
was issued for a period ending April 30, 2023.
Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the
Commission, at the expiration of a license term, to issue from year-to-
year an annual license to the then licensee
Kaukauna Utilities; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests
hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: P-2715-026.
c. Date filed: July 22, 2022.
d. Applicant: Kaukauna Utilities (Kaukauna
Seattle City Light; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments
for Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 553-244.
c. Date
Notice of Funding Opportunity for the Empowering Rural America (New ERA) Program
), geothermal, hydroelectric, or energy sources
that are naturally replenished and do not run out; or (2) hydrogen
derived from renewable biomass or water using an energy source
described in subparagraph (1).
Renewable Energy Systems. For purposes
Tivis Branch Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications
Applications
On January 3, 2023, Tivis Branch Hydro, LLC, filed an application
for a preliminary permit, pursuant to section 4(f) of the Federal Power
Act (FPA), proposing to study the feasibility of the Flannagan
Hydroelectric Project to be located
Endangered and Threatened Species: Designation of Nonessential Experimental Populations of Chinook Salmon Upstream of Shasta Dam, Authorization for Release, and Adoption of Limited Protective Regulations Under the Endangered Species Act Sections 10(j) and 4(s)
Regulatory Commission (FERC), pursuant to the
Federal Power Act (FPA) and the U.S. Department of Energy Organization
Act, is authorized to issue licenses for up to 50 years for the
construction and operation of non-Federal hydroelectric developments
Green Mountain Power Corporation; Notice Soliciting Scoping Comments
No: 2023-10065]
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2490-031]
Green Mountain Power Corporation; Notice Soliciting Scoping
Comments
Take notice that the following hydroelectric application has been
filed
Erie Boulevard Hydropower, L.P.; Notice Soliciting Scoping Comments
No: 2023-10064]
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 15000-003]
Erie Boulevard Hydropower, L.P.; Notice Soliciting Scoping
Comments
Take notice that the following hydroelectric application has been
filed
Blue Earth County; Notice of Application for Surrender of Exemption, Soliciting Comments, Motions To Intervene, and Protests
that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Application for surrender of exemption.
b. Project No.: P-3071-008.
c. Date Filed: April 14, 2023.
d
Marquette Board of Light and Power; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Non-Capacity Amendment of License to Revise
Article 403.
b. Project No.: 2589-088.
c. Date
Union Falls Hydropower, L.P.; Notice Soliciting Scoping Comments
No: 2023-10058]
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 4472-031]
Union Falls Hydropower, L.P.; Notice Soliciting Scoping Comments
Take notice that the following hydroelectric application has been
filed
Dashields Hydropower Corporation; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications
Hydroelectric Project to be located at the
existing U.S. Army Corps of Engineers' (Corps) Pittsburgh District
Dashields Locks and Dam located on the Ohio River at Coraopolis,
Allegheny County, Pennsylvania. The sole purpose of a preliminary
permit, if issued
Green Mountain Power Corporation; Notice of Intent To Prepare an Environmental Assessment
application for the 275-kilowatt Center Rutland Hydroelectric
Project No. 2445 (project). The project is located on Otter Creek in
Rutland County, Vermont.
In accordance with the Commission's regulations, on February 17,
2023, Commission staff issued
Boott Hydropower, LLC; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Non-capacity Amendment of License.
b. Project No: 2790-076.
c. Date Filed: April 21, 2023.\1\
\1\ The April
Green Mountain Power Corporation; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests
that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Subsequent Minor License.
b. Project No.: 2489-049.
c. Date filed: October 31, 2022.
d. Applicant: Green
Appalachian Power Company; Notice of Intent to Prepare an Environmental Assessment
for a new major license for the 2.4-megawatt Niagara
Hydroelectric Project (Niagara Project; FERC No. 2466). The Niagara
Project is located on the Roanoke River, in Roanoke County, Virginia.
The project is adjacent to and partially within the Blue Ridge
Montana Department of Natural Resources and Conservation; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests
To Intervene
and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 2853-073.
c. Date Filed
Ketchikan Public Utilities; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests
that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Subsequent License.
b. Project No.: 1922-052.
c. Date Filed: October 27, 2022.
d. Applicant: Ketchikan
Alice Falls Hydro, LLC; Notice of Intent To Prepare an Environmental Assessment
for a new major license for the 2.1-megawatt Alice Falls Hydroelectric
Project (Alice Falls Project or project; FERC No. 5867). The Alice
Falls Project is located on the Ausable River, in the Town of
Chesterfield, Clinton and Essex counties, New York
Boyne USA, Inc.; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Temporary variance of license requirement.
b. Project No.: 3409-036.
c. Date Filed: April 17, 2023.
d
City of Nashua, New Hampshire; Notice Soliciting Scoping Comments
with the
Commission and is available for public inspection.
a. Type of Application: Subsequent License.
b. Project No.: P-3442-029.
c. Date filed: July 30, 2021.
d. Applicant: City of Nashua (the City).
e. Name of Project: Mine Falls Hydroelectric
Revision to Power Marketing Policy Cumberland System of Projects
proposes to revise the Power Marketing Policy for the
System to include the following additional provisions for RECs
associated with hydroelectric generation:
Renewable Energy Certificates: The M-RETS Tracking System creates
and tracks certificates
PacifiCorp; Notice of Availability of Environmental Assessment
Energy Regulatory Commission's (Commission or FERC)
regulations, 18 CFR part 380, Commission staff reviewed PacifiCorp's
application for an amendment to the license of the North Umpqua
Hydroelectric Project No. 1927 and have prepared an Environmental
York Haven Power Company, LLC; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Application for Non-Capacity Amendment of
License.
b. Project No: 1888-043.
c. Date
PE Hydro Generation, LLC; Notice of Scoping Meetings and Environmental Site Reviews and Soliciting Scoping Comments
Scoping Comments
Take notice that the following hydroelectric applications have been
filed with the Commission and is available for public inspection.
a. Type of Applications: Subsequent Minor, New Major License,
Subsequent Minor.
b. Project
Androscoggin Reservoir Company; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments
for
Licensing and Deadline for Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project
Northern States Power Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Adequacy of Aesthetic Flows Over St. Anthony
Falls Report.
b. Project No: 2056-055.
c. Date
Union Falls Hydropower, L.P.; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests
that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 4472-031.
c. Date filed: June 30, 2022.
d. Applicant: Union Falls
Erie Boulevard Hydropower, L.P.; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests
that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 15000-003.
c. Date filed: June 30, 2022.
d. Applicant: Erie Boulevard
Idaho Power Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Non-Capacity Amendment of License.
b. Project No.: 1971-135.
[[Page 23027]]
c. Date Filed: October 6 and 7
Notice of Settlement Agreement and Soliciting Comments; FirstLight MA Hydro LLC; Northfield Mountain LLC
.
d. Applicant: FirstLight MA Hydro LLC and Northfield Mountain LLC
(collectively FirstLight).
e. Name of Projects: Turners Falls Hydroelectric Project and
Northfield Mountain Pumped Storage Project (collectively, projects).
f. Location
Petroleum-Equivalent Fuel Economy Calculation
The U.S. Department of Energy (``DOE'') proposes to revise its regulations regarding procedures for calculating a value for the petroleum-equivalent fuel economy of electric vehicles (or ``EVs'') for use in the Corporate Average Fuel Economy (CAFE) program administered by the Department of Transportation (DOT). This Notice of proposed rulemaking (``NOPR'') also grants a petition for rulemaking submitted by the Natural Resources Defense Council (NRDC) and Sierra Club and responds to comments submitted on that petition.
Notice of Availability of Guidance and Application for Hydroelectric Production Incentives; Correction
No: 2023-07455]
DEPARTMENT OF ENERGY
Notice of Availability of Guidance and Application for
Hydroelectric Production Incentives; Correction
AGENCY: Hydroelectric Incentives Program, Grid Deployment Office,
Department of Energy.
ACTION: Notice
Renewable World Energies, LLC, Grenfell, LLC; Notice of Transfer of Exemption
for the
280-kilowatt Belding Dam Hydroelectric Project No. 9379, filed a letter
notifying the Commission that the project was transferred from
Renewable World Energies, LLC to Grenfell, LLC. The exemption from
licensing was originally issued on March 17
Heard County Pumped Storage Project; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications
, and Competing Applications
On January 31, 2023, BOST1 Hydroelectric, LLC., filed an
application for a preliminary permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to study the feasibility of a pumped
storage hydropower project
New England Hydropower Company, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process
Hydropower Company, LLC (NEHC).
e. Name of Project: Ashton Dam Hydroelectric Project (project).
f. Location: On the Blackstone River in Providence County, Rhode
Island. No federal lands are occupied by the project works or located
within the project
City of Pasadena Water and Power Department; Notice of Teleconference for Section 106 of the National Historic Preservation Act Consultation Meeting
Consultation Meeting
a. Project Name and Numbers: Azusa Project and Azusa Powerhouse
Hydroelectric Project Nos. 1250 and 14836.
b. Project licensee: City of Pasadena Water and Power Department.
c. Date and Time of Teleconference: Tuesday, April 25
Brookfield White Pine Hydro, LLC, Errol Hydro Co., LLC; Notice of Availability of Environmental Assessment
Hydroelectric Project. The project is located on the
Androscoggin River and Umbagog Lake, near the Town of Errol, and
Township of Cambridge, in Coos County, New Hampshire, and the Towns of
Magalloway Plantation and Upton in Oxford County, Maine. Commission
Alabama Power Company; Notice of Intent To Prepare an Environmental Impact Statement
an application
for a new major license to operate its 137.5-megawatt (MW) \1\ R.L.
Harris Hydroelectric Project (Harris Project; FERC No. 2628). The
project is located on the Tallapoosa River near the City of Lineville
in Randolph, Clay, and Cleburne Counties
Wisconsin River Power Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Non-Capacity Amendment of License.
b. Project No.: 1984-265.
c. Date Filed: December
Kings River Conservation District; Notice of Availability of Environmental Assessment
of the Pine Flat Hydroelectric Project No.
2741 and have prepared an Environmental Assessment (EA). The licensee
proposes to add a fourth generating unit (Unit 4) to the project that
will utilize flows from the bypass system. The new Unit 4 would utilize
Integrated System Power Rates
: Originally established by Order 1865,
Secretary of the Interior, dated August 31, 1943 and effective
September 1, 1943 (8 FR 12142 (Sept. 3, 1943)), Southwestern is
authorized by Congress to market the hydroelectric power and energy
from Federal dams
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.