Results 51 - 100 of 6,880
Sorted by Date | Sort by Relevance
Georgia Power Company; Notice of Application for Non-Capacity Amendment of License Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Non-capacity Amendment of License.
b. Project No: 2177-113.
c
Appalachian Power Company; Notice of Authorization for Continued Project Operation
No: 2024-04907]
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2466-000]
Appalachian Power Company; Notice of Authorization for Continued
Project Operation
The license for the Niagara Hydroelectric Project No. 2466
Alice Falls Hydro, LLC; Notice of Availability of Environmental Assessment
of 1969
and the Federal Energy Regulatory Commission's (Commission)
regulations, 18 CFR part 380, the Office of Energy Projects has
reviewed the application for a new license to continue to operate and
maintain the Alice Falls Hydroelectric Project
Pacific Gas and Electric Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Application for Temporary Variance of Flow
Requirements.
b. Project No: 77-320.
c
Union Falls Hydropower, L.P.; Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions
and Conditions, and Prescriptions
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 4472-031.
c. Date
Agency Information Collection Extension
supporting materials from
applicants as required to receive payments for hydroelectric incentive
programs.
DATES: Comments regarding this proposed information collection must be
received before on or before April 5, 2024. If you anticipate that you
Endangered and Threatened Species: Expiration of Nonessential Experimental Population Designation for Middle Columbia River Steelhead Upstream of Round Butte Dam, Deschutes River Basin, Oregon
in
eastern Oregon and eastern Washington. The Deschutes River in central
Oregon is one of six major river basins supporting steelhead in this
distinct population segment. Since about 1968, the Pelton Round Butte
Hydroelectric Project (Pelton Round Butte
American Climate Partners; Notice of Application for Surrender of Exemption Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests
To
Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Surrender of Exemption.
b. Project No: P-8402-004.
c. Date
Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions; Great River Hydro, LLC
Comments, Recommendations, Preliminary Terms and Conditions,
and Preliminary Fishway Prescriptions; Great River Hydro, LLC
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public
Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions; FirstLight MA Hydro LLC
Comments, Recommendations, Preliminary Terms and Conditions,
and Preliminary Fishway Prescriptions; FirstLight MA Hydro LLC
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public
Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions; Great River Hydro, LLC
Comments, Recommendations, Preliminary Terms and Conditions,
and Preliminary Fishway Prescriptions; Great River Hydro, LLC
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public
Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions; Great River Hydro, LLC
Comments, Recommendations, Preliminary Terms and Conditions,
and Preliminary Fishway Prescriptions; Great River Hydro, LLC
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public
Notice of Availability of Draft Environmental Assessment; Rumford Falls Hydro LLC
Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's (Commission)
regulations, 18 CFR part 380, the Office of Energy Projects has
reviewed the application for license for the Rumford Falls
Hydroelectric Project, located
Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Preliminary Terms and Conditions, and Preliminary Fishway Prescriptions; Northfield Mountain LLC
Comments, Recommendations, Preliminary Terms and Conditions,
and Preliminary Fishway Prescriptions; Northfield Mountain LLC
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public
Endangered and Threatened Species; Take of Anadromous Fish
Klamath Hydroelectric
Project No. 14803.''
The secondary purpose of the Fall Creek Hatchery coho salmon
program is to provide adult coho salmon that could disperse to newly
accessible habitat (76 miles or 122 kilometers) made available
following
Public Utility District No. 1 of Chelan County, Washington; Notice of Application for Approval of Contract for the Sale of Power Under Section 22 of the Federal Power Act
of power from its
licensed Rock Island Hydroelectric Project No. 943 for a period beyond
the expiration of its existing license for the project. The project is
located on the Columbia River in Chelan and Douglas Counties,
Washington.
Section 22
Constellation Energy Generation; Safe Harbor Water Power Corporation; BIF III Holtwood, LLC; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
Accepted for
Filing and Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Temporary
PE Hydro Generation, LLC; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests
that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 2425-057.
c. Date filed: January 3, 2022.
d. Applicant: PE Hydro
Consumers Energy Company; Notice of Availability of Environmental Assessment
for the Hardy Hydroelectric Project No. 2452
(project) and have prepared an Environmental Assessment (EA). The
licensee proposes amending the license to upgrade project features and
improve dam safety. As proposed, the licensee would improve dam safety
PE Hydro Generation, LLC; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Subsequent Minor License.
b. Project No.: 2509-051.
c. Date filed: January 3, 2022
PE Hydro Generation, LLC; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests
that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Subsequent Minor License.
b. Project No.: 2391-053.
c. Date filed: January 3, 2022.
d. Applicant: PE Hydro
Lock 47 Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications
activities or otherwise enter upon lands or waters owned by
others without the owners' express permission.
The proposed Chain Dam Hydroelectric Project would consist of the
following: (1) an existing 700-foot-long, 20-foot-high concrete gravity
dam (i
Spencer Mountain Hydropower, LLC; Notice Soliciting Scoping Comments
.gpo.gov]
[FR Doc No: 2024-03492]
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2607-016]
Spencer Mountain Hydropower, LLC; Notice Soliciting Scoping
Comments
Take notice that the following hydroelectric application has
Public Utility District No. 1 of Chelan County; Notice of Intent To File License Application, Filing of Pre-Application Document (Pad), Commencement of Pre-Filing Process, and Scoping; Request for Comments on the Pad and Scoping Document, and Identification of Issues and Associated Study Requests
and Commencing Pre-filing Process.
b. Project No.: 943-144.
c. Dated Filed: December 15, 2023.
d. Submitted By: Public Utility District No. 1 of Chelan County.
e. Name of Project: Rock Island Hydroelectric Project.
f. Location: On the Columbia
Alabama Power Company; Notice of Application for Temporary Variance of Article 407 Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests
To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Request for Temporary Variance of Minimum Flow
Requirement Pursuant
City of Nashua, New Hampshire; Notice of Intent To Prepare an Environmental Assessment
) filed an application for
a new license for the 3-megawatt Mine Falls Hydroelectric Project No.
3442 (project).
[[Page 13077]]
The project is located on the Nashua River in Hillsborough County, New
Hampshire.
In accordance with the Commission
Battenkill Hydro Associates; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments
Requests and
Establishing Procedural Schedule for Relicensing and a Deadline for
Submission of Final Amendments
Take notice that the following hydroelectric applications have been
filed with the Commission and are available for public inspection
Kram Hydro 1, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications
.
The proposed Joe Hardin Lock and Dam Hydroelectric Project would
consist of the following: (1) a 90-foot-wide, 200-350-foot-long armored
intake channel, upstream of the powerhouse; (2) a 180-foot-long, 100-
foot-wide concrete powerhouse located downstream
Northbrook Carolina Hydro II, LLC; Notice of Application for Surrender of License Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests
To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Surrender of License.
b. Project No: P-2601-077.
c. Date Filed
ALLETE, Inc.; Notice of Waiver of Water Quality Certification
for a license for the Prairie River Hydroelectric Project in the above
captioned docket. On December 14, 2022, Minnesota Pollution Control
Agency received a complete request for
[[Page 11826]]
a Clean Water Act section 401(a)(1) water quality certification
ALLETE, Inc.; Notice of Waiver of Water Quality Certification
for a license for the Grand Rapids Hydroelectric Project in the above
captioned docket. On December 14, 2022, Minnesota Pollution Control
Agency received a complete request for a Clean Water Act section
401(a)(1) water quality certification from ALLETE
Erie Boulevard Hydropower, L.P.; Notice of Settlement Agreement and Soliciting Comments
).
e. Name of Project: West Canada Creek Hydroelectric Project (West
Canada Creek Project).
f. Location: The existing project is located on West Canada Creek,
a tributary of the Mohawk River, in the counties of Oneida and
Herkimer, New York
Idaho Power Company; Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions
and Conditions, and Prescriptions
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 2736-046.
c. Date
Marlow Hydro, LLC; Notice of Intent To File License Application and Setting Deadline To File Final License Application
Dam Hydroelectric Project (Nash Mill
Project).
f. Location: On the Ashuelot River, near the town of Marlow,
Cheshire County, New Hampshire.
g. Filed Pursuant to: 18 CFR 5.5 and 385.216 of the Commission's
regulations. Marlow Hydro filed
City of Aspen, Colorado; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process
of Aspen, Colorado.
e. Name of Project: Maroon Creek Hydroelectric Project.
f. Location: On Maroon Creek in Pitkin County, Colorado.
g. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations.
h. Potential Applicant Contact: Phil
City of Portland; Notice of Intent To File License Application, Filing of Pre-Application Document (PAD), Commencement of ILP Pre-Filing Process, and Scoping; Request for Comments on the PAD and Scoping Document, and Identification of Issues and Associated Study Requests
-filing Licensing Process.
b. Project No.: 2821-014.
c. Dated Filed: December 8, 2023.
d. Submitted By: City of Portland, Portland Water Bureau.
e. Name of Project: Portland Hydroelectric Project.
f. Location: The project is located on the Bull
Combined Notice of Filings #1
, Jackpot Holdings, LLC, Ledyard Windpower, LLC, AM
Wind Repower LLC, TerraForm IWG Acquisition Holdings II, LLC, Mesa Wind
Power LLC, Evolugen Trading and Marketing LP, Bitter Ridge Wind Farm,
LLC, Catalyst Old River Hydroelectric Limited Partnership
Eagle Creek Schoolfield Hydro, LLC, City of Danville; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests
and
Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 2411-030.
c. Date filed: July 29, 2022
Beaver Falls Municipal Authority; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests
notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 3451-047.
c. Date filed: August 1, 2022.\1\
\1
Combined Notice of Filings #2
Numbers: ER24-1097-000.
Applicants: Catalyst Old River Hydroelectric Limited Partnership.
Description: Compliance filing: Revised Market-Based Rate Tariff to
be effective 2/1/2024.
Filed Date: 1/31/24.
Accession Number: 20240131
Southern California Edison Company; Notice of Intent To Prepare an Environmental Assessment
16, 2023, Southern
California Edison Company (SCE or licensee) filed an application to
surrender its license and decommission the Borel Hydroelectric Project
No. 382. The project is located on the Kern River, in the City of
Bodfish in Kern County
PacifiCorp; Notice of Intent To Prepare an Environmental Assessment
an application for a non-capacity amendment for the Weber
Hydroelectric Project No. 1744. The project is located on the Weber
River in Davis, Morgan and Weber Counties, Utah. The project occupies
Federal lands managed by the U.S. Forest Service, administered
Seattle City Light; Notice of Intent To Prepare an Environmental Assessment and Notice of Revised Schedule
, and supplemented on February 14 and December
12, 2022, and April 10 and October 24, 2023, Seattle City Light filed
an application for surrender of license for the Newhalem Creek
Hydroelectric Project No. 2705. The project is located on Newhalem
Creek in Whatcom
STS Hydropower, LLC; Notice of Intent To Prepare an Environmental Assessment
, 2023, STS Hydropower, LLC (licensee) filed an application to
surrender its license for the Kanaka Hydroelectric Project No. 7242.
The project is located on Sucker Run Creek, in Butte County,
California. The project does not occupy any federal lands
Town of South Hill, Virginia; Notice of Intent To Prepare an Environmental Assessment
(exemptee)
filed an application to surrender its exemption from licensing for the
Whittles Mill Dam Hydroelectric Project No. 7630. The project is
located on the Meherrin River in the Town of South Hill in Mecklenburg
County, Virginia. The project does
Pacific Gas & Electric Company; Notice of Intent To Prepare an Environmental Assessment
on October 2, 2023, and
December 1, 2023, Pacific Gas & Electric Company (PG&E or licensee)
filed an application for a non-capacity amendment for the Battle Creek
Hydroelectric Project No. 1121. The project is located on the mainstem
Battle Creek
Lakeport Hydroelectric One, LLC and New Hampshire Department of Environmental Services; Notice of Intent To Prepare an Environmental Assessment
No: 2024-02100]
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 6440-010]
Lakeport Hydroelectric One, LLC and New Hampshire Department of
Environmental Services; Notice of Intent To Prepare an Environmental
Assessment
Dominion Energy South Carolina, Inc.; Notice of Availability of Final Environmental Assessment
of Project Lands and Waters of the
Saluda Hydroelectric Project No. 516 and have prepared an Environmental
Assessment (EA) for a proposed water withdraw. The licensee proposes to
allow the City of West Columbia, South Carolina (City), the use of
Saluda
York Haven Power Company, LLC; Notice of Intent To Prepare an Environmental Assessment
and 20, 2023,
York Haven Power Company, LLC filed an application for a non-capacity
amendment for the York Haven Hydroelectric Project No. 1888. The
project is located on the Susquehanna River in Lancaster and York
counties, Pennsylvania. The project
Energy Stream, LLC; Notice of Intent To Prepare an Environmental Assessment
an application for a
subsequent license for the 512-kilowatt M.S.C. Hydroelectric Project
(M.S.C. Project or project; FERC No. 5679). The M.S.C. Project is
located on the Quinebaug River, in Windham County, Connecticut.
In accordance with the Commission
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.