Andrew Peklo III; Notice of Availability of Environmental Assessment, 88059 [2023-27980]
Download as PDF
Federal Register / Vol. 88, No. 243 / Wednesday, December 20, 2023 / Notices
13, 2024, so that the comments may be
made available to the EWAB members
prior to this meeting for their
consideration. Please note that because
EWAB operates under the provisions of
FACA, all public comments and related
materials will be treated as public
documents and will be made available
for public inspection, including being
posted on the EWAB website.
Minutes: The minutes of this meeting
will be available on the 21st Century
Energy Workforce Advisory Board
website at https://www.energy.gov/
policy/21st-century-energy-workforceadvisory-board-ewab or by contacting
Piper O’Keefe at EWAB@hq.doe.gov.
Signed in Washington, DC, on December
14, 2023.
LaTanya Butler,
Deputy Committee Management Officer.
[FR Doc. 2023–27977 Filed 12–19–23; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12790–015]
ddrumheller on DSK120RN23PROD with NOTICES1
Andrew Peklo III; Notice of Availability
of Environmental Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission or FERC)
regulations, 18 CFR part 380,
Commission staff reviewed Andrew
Peklo III’s (licensee) application for an
amendment of the project license for the
Pomperaug Hydroelectric Project No.
12790 and have prepared an
Environmental Assessment (EA) for the
proposed amendment. The licensee
proposes to install two 45 kilowatt (kW)
turbines (for a total generating capacity
of 90 kW) instead of the single 76 kW
turbine authorized in the project
license. The Pomperaug Project is
unconstructed and would consist of a
powerhouse located adjacent to the
existing Pomperaug Dam on the
Pomperaug River in the town of
Woodbury, Litchfield County,
Connecticut, and is not located on
Federal lands.
The final EA contains Commission
staff’s analysis of the potential
environmental effects of the proposed
two-turbine installation and supporting
activities, alternatives to the proposed
action, and concludes that the proposed
installation, with appropriate
environmental protective measures,
would not constitute a major Federal
action that would significantly affect the
quality of the human environment.
VerDate Sep<11>2014
18:02 Dec 19, 2023
Jkt 262001
The final EA may be viewed on the
Commission’s website at https://
www.ferc.gov using the ‘‘elibrary’’ link.
Enter the docket number (P–12790–015)
in the docket number field to access the
document. For assistance, contact FERC
Online Support at FERCOnline
Support@ferc.gov or toll-free at 1–866–
208–3676, or for TTY, (202) 502–8659.
You may also register online at https://
www.ferc.gov/docs-filing/esubscription.
asp to be notified via email of new
filings and issuances related to this or
other pending projects. For assistance,
contact FERC Online Support.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
For further information, contact Zeena
Aljibury at 202–502–6065 or
zeena.aljibury@ferc.gov.
Dated: December 14, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–27980 Filed 12–19–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2628–000]
Alabama Power Company; Notice of
Authorization for Continued Project
Operation
The license for the R.L. Harris
Hydroelectric Project No. 2628 was
issued for a period ending November 30,
2023.
Section 15(a)(1) of the FPA, 16 U.S.C.
808(a)(1), requires the Commission, at
the expiration of a license term, to issue
from year-to-year an annual license to
the then licensee(s) under the terms and
conditions of the prior license until a
new license is issued, or the project is
otherwise disposed of as provided in
section 15 or any other applicable
section of the FPA. If the project’s prior
license waived the applicability of
section 15 of the FPA, then, based on
section 9(b) of the Administrative
Procedure Act, 5 U.S.C. 558(c), and as
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
88059
set forth at 18 CFR 16.21(a), if the
licensee of such project has filed an
application for a subsequent license, the
licensee may continue to operate the
project in accordance with the terms
and conditions of the license after the
minor or minor part license expires,
until the Commission acts on its
application. If the licensee of such a
project has not filed an application for
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 2628
is issued to Alabama Power Company
for a period effective December 1, 2023,
through November 30, 2024, or until the
issuance of a new license for the project
or other disposition under the FPA,
whichever comes first. If issuance of a
new license (or other disposition) does
not take place on or before November
30, 2024, notice is hereby given that,
pursuant to 18 CFR 16.18(c), an annual
license under section 15(a)(1) of the
FPA is renewed automatically without
further order or notice by the
Commission, unless the Commission
orders otherwise.
If the project is not subject to section
15 of the FPA, notice is hereby given
that Alabama Power Company is
authorized to continue operation of the
R.L. Harris Hydroelectric Project under
the terms and conditions of the prior
license until the issuance of a
subsequent license for the project or
other disposition under the FPA,
whichever comes first.
Dated: December 13, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–27881 Filed 12–19–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 8047–015]
Willimantic Power Corporation; Notice
Soliciting Applications
On August 31, 2020, Willimantic
Power Corporation (licensee), a
subsidiary of Enel Green Power North
America filed a Notice of Intent (NOI) to
file an application for a subsequent
license for its Willimantic #2
Hydroelectric Project, No. 8047,
pursuant to section 16.19(b)(3) of the
E:\FR\FM\20DEN1.SGM
20DEN1
Agencies
[Federal Register Volume 88, Number 243 (Wednesday, December 20, 2023)]
[Notices]
[Page 88059]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-27980]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12790-015]
Andrew Peklo III; Notice of Availability of Environmental
Assessment
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's (Commission or FERC)
regulations, 18 CFR part 380, Commission staff reviewed Andrew Peklo
III's (licensee) application for an amendment of the project license
for the Pomperaug Hydroelectric Project No. 12790 and have prepared an
Environmental Assessment (EA) for the proposed amendment. The licensee
proposes to install two 45 kilowatt (kW) turbines (for a total
generating capacity of 90 kW) instead of the single 76 kW turbine
authorized in the project license. The Pomperaug Project is
unconstructed and would consist of a powerhouse located adjacent to the
existing Pomperaug Dam on the Pomperaug River in the town of Woodbury,
Litchfield County, Connecticut, and is not located on Federal lands.
The final EA contains Commission staff's analysis of the potential
environmental effects of the proposed two-turbine installation and
supporting activities, alternatives to the proposed action, and
concludes that the proposed installation, with appropriate
environmental protective measures, would not constitute a major Federal
action that would significantly affect the quality of the human
environment.
The final EA may be viewed on the Commission's website at https://www.ferc.gov using the ``elibrary'' link. Enter the docket number (P-
12790-015) in the docket number field to access the document. For
assistance, contact FERC Online Support at [email protected]
or toll-free at 1-866-208-3676, or for TTY, (202) 502-8659.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
For further information, contact Zeena Aljibury at 202-502-6065 or
[email protected].
Dated: December 14, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-27980 Filed 12-19-23; 8:45 am]
BILLING CODE 6717-01-P