Kram Hydro 3, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 1569 [2024-00335]

Download as PDF 1569 Federal Register / Vol. 89, No. 7 / Wednesday, January 10, 2024 / Notices field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. Docket Nos. File date Prohibited: 1. CP22–2–000 ...................................................................................................................... Exempt: None. Dated: January 4, 2024. Debbie-Anne A. Reese, Acting Secretary. [FR Doc. 2024–00332 Filed 1–9–24; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 15330–000] lotter on DSK11XQN23PROD with NOTICES1 Kram Hydro 3, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On October 27, 2023, Kram Hydro 3, LLC, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of hydropower project to be located at the U.S. Army Corps of Engineers’ (Corps) Emmett Sanders Lock and Dam near the City of Pine Bluff, Jefferson County, Arkansas. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed Emmett Sanders Lock and Dam Hydroelectric Project would consist of the following: (1) a 90-footwide, 200–350-foot-long armored intake channel, upstream of the powerhouse; (2) a 100-foot-long, 180-foot-wide concrete powerhouse located downstream of the existing Corps dam on the northeast bank, housing two identical Kaplan turbine-generator units with a combined generating capacity of 20.0 megawatts; (3) a 200-foot-long, 100foot wide unlined tailrace; (4) a 300foot-long concrete retaining wall to be constructed downstream of the powerhouse; and (5) a 7-mile-long, 115 kilovolt transmission line. The proposed project would have an estimated annual generation of 90,300 megawatt-hours. Applicant Contact: Kristen Fan, Kram Hydro 3, 12333 Sowden Rd., Suite B, PMB 50808, Houston, TX 77080; phone: (772) 418–2705. FERC Contact: Prabharanjani Madduri; phone: (202) 502–8017, or by email at prabharanjani.madduri@ ferc.gov. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission’s eFiling system at https:// ferconline.ferc.gov/eFiling.aspx. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://ferconline.ferc.gov/ QuickComment.aspx. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Debbie-Anne Reese, Acting Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Debbie-Anne Reese, Acting Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include docket number P–15330–000. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help 12–20–2023 16:40 Jan 09, 2024 Jkt 262001 PO 00000 Frm 00061 Fmt 4703 Sfmt 4703 FERC Staff.1 members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. More information about this project, including a copy of the application, can be viewed, or printed on the ‘‘eLibrary’’ link of the Commission’s website at https://elibrary.ferc.gov/eLibrary/search. Enter the docket number (P–15330) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: January 4, 2024. Debbie-Anne A. Reese, Acting Secretary. [FR Doc. 2024–00335 Filed 1–9–24; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Effectiveness of Exempt Wholesale Generator and Foreign Utility Company Status Docket Nos. Nova Power, LLC .......................... Crow Creek Solar, LLC ................. Inertia Energy Storage, LLC ......... Torrecillas Energy Storage, LLC ... Ben Milam Solar 1 LLC ................. Ben Milam Solar 3 LLC ................. Salt Creek Township Solar, LLC ... BCD 2024 Fund 1 Lessee, LLC .... South Cheyenne Solar, LLC ......... Sunlight Storage II, LLC ................ Willowbrook Solar I, LLC ............... Cedar Creek Wind, LLC ................ St. Gall Energy Storage I, LLC ..... Silver Peak Energy, LLC ............... Wild Springs Solar, LLC ................ Skysol, LLC ................................... Beaumont ESS, LLC ..................... Placerita ESS, LLC ....................... Poblano Energy Storage, LLC ...... 1 Emailed comments from Nancy Shimeall and 10 other individuals. VerDate Sep<11>2014 Presenter or requester E:\FR\FM\10JAN1.SGM 10JAN1 EG24–1–000 EG24–2–000 EG24–3–000 EG24–4–000 EG24–5–000 EG24–6–000 EG24–7–000 EG24–8–000 EG24–9–000 EG24–10–000 EG24–11–000 EG24–12–000 EG24–13–000 EG24–14–000 EG24–15–000 EG24–16–000 EG24–17–000 EG24–18–000 EG24–19–000

Agencies

[Federal Register Volume 89, Number 7 (Wednesday, January 10, 2024)]
[Notices]
[Page 1569]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2024-00335]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 15330-000]


Kram Hydro 3, LLC; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions To Intervene, and 
Competing Applications

    On October 27, 2023, Kram Hydro 3, LLC, filed an application for a 
preliminary permit, pursuant to section 4(f) of the Federal Power Act 
(FPA), proposing to study the feasibility of hydropower project to be 
located at the U.S. Army Corps of Engineers' (Corps) Emmett Sanders 
Lock and Dam near the City of Pine Bluff, Jefferson County, Arkansas. 
The sole purpose of a preliminary permit, if issued, is to grant the 
permit holder priority to file a license application during the permit 
term. A preliminary permit does not authorize the permit holder to 
perform any land-disturbing activities or otherwise enter upon lands or 
waters owned by others without the owners' express permission.
    The proposed Emmett Sanders Lock and Dam Hydroelectric Project 
would consist of the following: (1) a 90-foot-wide, 200-350-foot-long 
armored intake channel, upstream of the powerhouse; (2) a 100-foot-
long, 180-foot-wide concrete powerhouse located downstream of the 
existing Corps dam on the northeast bank, housing two identical Kaplan 
turbine-generator units with a combined generating capacity of 20.0 
megawatts; (3) a 200-foot-long, 100-foot wide unlined tailrace; (4) a 
300-foot-long concrete retaining wall to be constructed downstream of 
the powerhouse; and (5) a 7-mile-long, 115 kilovolt transmission line. 
The proposed project would have an estimated annual generation of 
90,300 megawatt-hours.
    Applicant Contact: Kristen Fan, Kram Hydro 3, 12333 Sowden Rd., 
Suite B, PMB 50808, Houston, TX 77080; phone: (772) 418-2705.
    FERC Contact: Prabharanjani Madduri; phone: (202) 502-8017, or by 
email at [email protected].
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at https://ferconline.ferc.gov/eFiling.aspx. Commenters can submit brief comments 
up to 6,000 characters, without prior registration, using the eComment 
system at https://ferconline.ferc.gov/QuickComment.aspx. You must 
include your name and contact information at the end of your comments. 
For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, you may submit a paper copy. 
Submissions sent via the U.S. Postal Service must be addressed to: 
Debbie-Anne Reese, Acting Secretary, Federal Energy Regulatory 
Commission, 888 First Street NE, Room 1A, Washington, DC 20426. 
Submissions sent via any other carrier must be addressed to: Debbie-
Anne Reese, Acting Secretary, Federal Energy Regulatory Commission, 
12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any 
filing should include docket number P-15330-000.
    The Commission's Office of Public Participation (OPP) supports 
meaningful public engagement and participation in Commission 
proceedings. OPP can help members of the public, including landowners, 
environmental justice communities, Tribal members and others, access 
publicly available information and navigate Commission processes. For 
public inquiries and assistance with making filings such as 
interventions, comments, or requests for rehearing, the public is 
encouraged to contact OPP at (202) 502-6595 or [email protected].
    More information about this project, including a copy of the 
application, can be viewed, or printed on the ``eLibrary'' link of the 
Commission's website at https://elibrary.ferc.gov/eLibrary/search. 
Enter the docket number (P-15330) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: January 4, 2024.
Debbie-Anne A. Reese,
Acting Secretary.
[FR Doc. 2024-00335 Filed 1-9-24; 8:45 am]
BILLING CODE 6717-01-P