Cube Yadkin Generation, LLC; Notice of Application for a Non-Capacity Amendment of License Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests, 89443-89444 [2023-28537]

Download as PDF ddrumheller on DSK120RN23PROD with NOTICES1 Federal Register / Vol. 88, No. 247 / Wednesday, December 27, 2023 / Notices Comment Date: 5 p.m. ET 12/26/23. Docket Numbers: ER24–706–000. Applicants: Northern Orchard Solar PV, LLC. Description: Baseline eTariff Filing: Market Based Rate to be effective 12/19/ 2023. Filed Date: 12/19/23. Accession Number: 20231219–5223. Comment Date: 5 p.m. ET 1/9/24. Docket Numbers: ER24–707–000. Applicants: Quartz Solar, LLC. Description: Baseline eTariff Filing: Market Based Rate to be effective 2/19/ 2024. Filed Date: 12/20/23. Accession Number: 20231220–5000. Comment Date: 5 p.m. ET 1/10/24. Docket Numbers: ER24–708–000. Applicants: Transource Oklahoma, LLC, Southwest Power Pool, Inc. Description: Compliance filing: Transource Oklahoma, LLC submits tariff filing per 35: AEP on behalf of affilate Transource Oklahoma Order 864 Compliance Filing to be effective 2/20/ 2024. Filed Date: 12/20/23. Accession Number: 20231220–5069. Comment Date: 5 p.m. ET 1/10/24. Docket Numbers: ER24–709–000. Applicants: Duke Energy Carolinas, LLC. Description: § 205(d) Rate Filing: Joint OATT Ministerial Clean-up Filing (2023) to be effective 11/17/2021. Filed Date: 12/20/23. Accession Number: 20231220–5115. Comment Date: 5 p.m. ET 1/10/24. Docket Numbers: ER24–710–000. Applicants: New York Independent System Operator, Inc. Description: § 205(d) Rate Filing: NYISO 205: NYISO Ravenswood Fuel Oil Implementation Agreement, SA2827 to be effective 1/1/2024. Filed Date: 12/20/23. Accession Number: 20231220–5117. Comment Date: 5 p.m. ET 1/10/24. Docket Numbers: ER24–711–000. Applicants: Valley Electric Association, Inc. Description: § 205(d) Rate Filing: Annual TRBAA Filing for 2024 to be effective 1/1/2024. Filed Date: 12/20/23. Accession Number: 20231220–5145. Comment Date: 5 p.m. ET 1/10/24. Docket Numbers: ER24–712–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Amendment to ISA, Service Agreement No. 5979; Queue No. AD2–085/AE2– 247/AF1–017 to be effective 2/19/2024. Filed Date: 12/20/23. Accession Number: 20231220–5161. VerDate Sep<11>2014 19:00 Dec 26, 2023 Jkt 262001 Comment Date: 5 p.m. ET 1/10/24. Docket Numbers: ER24–713–000. Applicants: Alabama Power Company, Georgia Power Company, Mississippi Power Company. Description: § 205(d) Rate Filing: Alabama Power Company submits tariff filing per 35.13(a)(2)(iii: Pinewood Solar LGIA Filing to be effective 12/9/2023. Filed Date: 12/20/23. Accession Number: 20231220–5166. Comment Date: 5 p.m. ET 1/10/24. Docket Numbers: ER24–714–000. Applicants: Alabama Power Company, Georgia Power Company, Mississippi Power Company. Description: § 205(d) Rate Filing: Alabama Power Company submits tariff filing per 35.13(a)(2)(iii: Zurisol (Rockdale Storage) LGIA Filing to be effective 12/8/2023. Filed Date: 12/20/23. Accession Number: 20231220–5167. Comment Date: 5 p.m. ET 1/10/24. Docket Numbers: ER24–715–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) Rate Filing: 2023–12–20_SA 4218 Union ElectricGrain Belt TCA (H104 H105) to be effective 2/19/2024. Filed Date: 12/20/23. Accession Number: 20231220–5202. Comment Date: 5 p.m. ET 1/10/24. Docket Numbers: ER24–716–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Amendment to ISA, Service Agreement No. 6232; Queue No. AE1–071 to be effective 2/19/2024. Filed Date: 12/20/23. Accession Number: 20231220–5207. Comment Date: 5 p.m. ET 1/10/24. Docket Numbers: ER24–717–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Amendment to ISA, Service Agreement No. 6220; Queue No. AB2–037 to be effective 2/19/2024. Filed Date: 12/20/23. Accession Number: 20231220–5238. Comment Date: 5 p.m. ET 1/10/24. Docket Numbers: ER24–718–000. Applicants: Oklahoma Gas and Electric Company. Description: § 205(d) Rate Filing: Normal filing 2023 Dec to be effective 11/12/2010. Filed Date: 12/20/23. Accession Number: 20231220–5245. Comment Date: 5 p.m. ET 1/10/24.pm The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. PO 00000 Frm 00082 Fmt 4703 Sfmt 4703 89443 Any person desiring to intervene, to protest, or to answer a complaint in any of the above proceedings must file in accordance with Rules 211, 214, or 206 of the Commission’s Regulations (18 CFR 385.211, 385.214, or 385.206) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. Dated: December 20, 2023. Kimberly D. Bose, Secretary. [FR Doc. 2023–28544 Filed 12–26–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2197–144] Cube Yadkin Generation, LLC; Notice of Application for a Non-Capacity Amendment of License Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Non-Capacity Amendment of License. b. Project No.: 2197–144. c. Date Filed: June 20, 2023, and supplemented on August 18, 2023, and December 1, 2023. d. Applicant: Cube Yadkin Generation, LLC. e. Name of Project: Yadkin Hydroelectric Project. f. Location: The project is located on the Yadkin River in Davie, Davidson, E:\FR\FM\27DEN1.SGM 27DEN1 ddrumheller on DSK120RN23PROD with NOTICES1 89444 Federal Register / Vol. 88, No. 247 / Wednesday, December 27, 2023 / Notices Montgomery, Rowan, and Stanly counties, North Carolina. The project does not include Federal lands. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Jody Smet, Vice President, Engineering and Regulatory Affairs, 7315 Wisconsin Avenue, Suite 1100W, Bethesda, Maryland 20814, (240) 482–2700, Jody.Smet@ eaglecreekre.com. i. FERC Contact: Aneela Mousam, (202) 502–8357, aneela.mousam@ ferc.gov. j. Cooperating agencies: With this notice, the Commission is inviting Federal, State, local, and Tribal agencies with jurisdiction and/or special expertise with respect to environmental issues affected by the proposal, that wish to cooperate in the preparation of any environmental document, if applicable, to follow the instructions for filing such requests described in item m below. Cooperating agencies should note the Commission’s policy that agencies that cooperate in the preparation of any environmental document cannot also intervene. See 94 FERC ¶ 61,076 (2001). k. Water Quality Certification: The applicant must file no later than 60 days following the date of issuance of this notice: (1) a copy of the water quality certification; (2) a copy of the request for certification, including proof of the date on which the certifying agency received the request; or (3) evidence of waiver of water quality certification.’’ m. Deadline for filing comments, motions to intervene, and protests: January 19, 2024. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, VerDate Sep<11>2014 19:00 Dec 26, 2023 Jkt 262001 Rockville, Maryland 20852. The first page of any filing should include the docket number P–2197–144. Comments emailed to Commission staff are not considered part of the Commission record. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. l. Description of Request: Cube Yadkin Generation, LLC (licensee) requests Commission approval to replace the Unit 1 turbine-generator at the Falls Development. The new turbine-generator unit would be placed in the same location as the existing turbine-generator unit. The proposed upgrades would increase the Falls Development’s installed capacity from 31.13 megawatt (MW) to 35.56 MW. The maximum hydraulic capacity would increase from 8,855 cubic feet per second (cfs) to 9,270 cfs (4.7% increase). The licensee does not anticipate any adverse effect to environmental resources as a result of the proposed amendment. m. Locations of the Application: This filing may be viewed on the Commission’s website at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. Agencies may obtain copies of the application directly from the applicant. n. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. o. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214, respectively. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in PO 00000 Frm 00083 Fmt 4703 Sfmt 4703 accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. p. Filing and Service of Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person commenting, protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. Any filing made by an intervenor must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010. q. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. Dated: December 20, 2023. Kimberly D. Bose, Secretary. [FR Doc. 2023–28537 Filed 12–26–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 6055–006, 6055–007, 6055– 008] Jeffersonville Hydroelectric Co.; Notice of Application for Surrender of Exemption, Soliciting Comments, Motions To Intervene, and Protests and Notice of Effectiveness of Withdrawal of Application To Surrender Exemption Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: E:\FR\FM\27DEN1.SGM 27DEN1

Agencies

[Federal Register Volume 88, Number 247 (Wednesday, December 27, 2023)]
[Notices]
[Pages 89443-89444]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-28537]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2197-144]


Cube Yadkin Generation, LLC; Notice of Application for a Non-
Capacity Amendment of License Accepted for Filing, Soliciting Comments, 
Motions To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Application Type: Non-Capacity Amendment of License.
    b. Project No.: 2197-144.
    c. Date Filed: June 20, 2023, and supplemented on August 18, 2023, 
and December 1, 2023.
    d. Applicant: Cube Yadkin Generation, LLC.
    e. Name of Project: Yadkin Hydroelectric Project.
    f. Location: The project is located on the Yadkin River in Davie, 
Davidson,

[[Page 89444]]

Montgomery, Rowan, and Stanly counties, North Carolina. The project 
does not include Federal lands.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: Jody Smet, Vice President, Engineering and 
Regulatory Affairs, 7315 Wisconsin Avenue, Suite 1100W, Bethesda, 
Maryland 20814, (240) 482-2700, [email protected].
    i. FERC Contact: Aneela Mousam, (202) 502-8357, 
[email protected].
    j. Cooperating agencies: With this notice, the Commission is 
inviting Federal, State, local, and Tribal agencies with jurisdiction 
and/or special expertise with respect to environmental issues affected 
by the proposal, that wish to cooperate in the preparation of any 
environmental document, if applicable, to follow the instructions for 
filing such requests described in item m below. Cooperating agencies 
should note the Commission's policy that agencies that cooperate in the 
preparation of any environmental document cannot also intervene. See 94 
FERC ] 61,076 (2001).
    k. Water Quality Certification: The applicant must file no later 
than 60 days following the date of issuance of this notice: (1) a copy 
of the water quality certification; (2) a copy of the request for 
certification, including proof of the date on which the certifying 
agency received the request; or (3) evidence of waiver of water quality 
certification.''
    m. Deadline for filing comments, motions to intervene, and 
protests: January 19, 2024.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, and protests using the Commission's 
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. 
Commenters can submit brief comments up to 6,000 characters, without 
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact 
information at the end of your comments. For assistance, please contact 
FERC Online Support at [email protected], (866) 208-3676 (toll 
free), or (202) 502-8659 (TTY). In lieu of electronic filing, you may 
submit a paper copy. Submissions sent via the U.S. Postal Service must 
be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory 
Commission, 888 First Street NE, Room 1A, Washington, DC 20426. 
Submissions sent via any other carrier must be addressed to: Kimberly 
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins 
Avenue, Rockville, Maryland 20852. The first page of any filing should 
include the docket number P-2197-144. Comments emailed to Commission 
staff are not considered part of the Commission record.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person whose name appears on the official service 
list for the project. Further, if an intervenor files comments or 
documents with the Commission relating to the merits of an issue that 
may affect the responsibilities of a particular resource agency, they 
must also serve a copy of the document on that resource agency.
    l. Description of Request: Cube Yadkin Generation, LLC (licensee) 
requests Commission approval to replace the Unit 1 turbine-generator at 
the Falls Development. The new turbine-generator unit would be placed 
in the same location as the existing turbine-generator unit. The 
proposed upgrades would increase the Falls Development's installed 
capacity from 31.13 megawatt (MW) to 35.56 MW. The maximum hydraulic 
capacity would increase from 8,855 cubic feet per second (cfs) to 9,270 
cfs (4.7% increase). The licensee does not anticipate any adverse 
effect to environmental resources as a result of the proposed 
amendment.
    m. Locations of the Application: This filing may be viewed on the 
Commission's website at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. You may also register 
online at https://www.ferc.gov/docs-filing/esubscription.asp to be 
notified via email of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208-3676 or email 
[email protected], for TTY, call (202) 502-8659. Agencies may 
obtain copies of the application directly from the applicant.
    n. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    o. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214, respectively. In determining the appropriate action to take, the 
Commission will consider all protests or other comments filed, but only 
those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any comments, 
protests, or motions to intervene must be received on or before the 
specified comment date for the particular application.
    p. Filing and Service of Documents: Any filing must (1) bear in all 
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO 
INTERVENE'' as applicable; (2) set forth in the heading the name of the 
applicant and the project number of the application to which the filing 
responds; (3) furnish the name, address, and telephone number of the 
person commenting, protesting or intervening; and (4) otherwise comply 
with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis. Any filing made by an intervenor must be accompanied 
by proof of service on all persons listed in the service list prepared 
by the Commission in this proceeding, in accordance with 18 CFR 
385.2010.
    q. The Commission's Office of Public Participation (OPP) supports 
meaningful public engagement and participation in Commission 
proceedings. OPP can help members of the public, including landowners, 
environmental justice communities, Tribal members and others, access 
publicly available information and navigate Commission processes. For 
public inquiries and assistance with making filings such as 
interventions, comments, or requests for rehearing, the public is 
encouraged to contact OPP at (202) 502-6595 or [email protected].

    Dated: December 20, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-28537 Filed 12-26-23; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.