Cube Yadkin Generation, LLC; Notice of Application for a Non-Capacity Amendment of License Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests, 89443-89444 [2023-28537]
Download as PDF
ddrumheller on DSK120RN23PROD with NOTICES1
Federal Register / Vol. 88, No. 247 / Wednesday, December 27, 2023 / Notices
Comment Date: 5 p.m. ET 12/26/23.
Docket Numbers: ER24–706–000.
Applicants: Northern Orchard Solar
PV, LLC.
Description: Baseline eTariff Filing:
Market Based Rate to be effective 12/19/
2023.
Filed Date: 12/19/23.
Accession Number: 20231219–5223.
Comment Date: 5 p.m. ET 1/9/24.
Docket Numbers: ER24–707–000.
Applicants: Quartz Solar, LLC.
Description: Baseline eTariff Filing:
Market Based Rate to be effective 2/19/
2024.
Filed Date: 12/20/23.
Accession Number: 20231220–5000.
Comment Date: 5 p.m. ET 1/10/24.
Docket Numbers: ER24–708–000.
Applicants: Transource Oklahoma,
LLC, Southwest Power Pool, Inc.
Description: Compliance filing:
Transource Oklahoma, LLC submits
tariff filing per 35: AEP on behalf of
affilate Transource Oklahoma Order 864
Compliance Filing to be effective 2/20/
2024.
Filed Date: 12/20/23.
Accession Number: 20231220–5069.
Comment Date: 5 p.m. ET 1/10/24.
Docket Numbers: ER24–709–000.
Applicants: Duke Energy Carolinas,
LLC.
Description: § 205(d) Rate Filing: Joint
OATT Ministerial Clean-up Filing
(2023) to be effective 11/17/2021.
Filed Date: 12/20/23.
Accession Number: 20231220–5115.
Comment Date: 5 p.m. ET 1/10/24.
Docket Numbers: ER24–710–000.
Applicants: New York Independent
System Operator, Inc.
Description: § 205(d) Rate Filing:
NYISO 205: NYISO Ravenswood Fuel
Oil Implementation Agreement, SA2827
to be effective 1/1/2024.
Filed Date: 12/20/23.
Accession Number: 20231220–5117.
Comment Date: 5 p.m. ET 1/10/24.
Docket Numbers: ER24–711–000.
Applicants: Valley Electric
Association, Inc.
Description: § 205(d) Rate Filing:
Annual TRBAA Filing for 2024 to be
effective 1/1/2024.
Filed Date: 12/20/23.
Accession Number: 20231220–5145.
Comment Date: 5 p.m. ET 1/10/24.
Docket Numbers: ER24–712–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to ISA, Service Agreement
No. 5979; Queue No. AD2–085/AE2–
247/AF1–017 to be effective 2/19/2024.
Filed Date: 12/20/23.
Accession Number: 20231220–5161.
VerDate Sep<11>2014
19:00 Dec 26, 2023
Jkt 262001
Comment Date: 5 p.m. ET 1/10/24.
Docket Numbers: ER24–713–000.
Applicants: Alabama Power
Company, Georgia Power Company,
Mississippi Power Company.
Description: § 205(d) Rate Filing:
Alabama Power Company submits tariff
filing per 35.13(a)(2)(iii: Pinewood Solar
LGIA Filing to be effective 12/9/2023.
Filed Date: 12/20/23.
Accession Number: 20231220–5166.
Comment Date: 5 p.m. ET 1/10/24.
Docket Numbers: ER24–714–000.
Applicants: Alabama Power
Company, Georgia Power Company,
Mississippi Power Company.
Description: § 205(d) Rate Filing:
Alabama Power Company submits tariff
filing per 35.13(a)(2)(iii: Zurisol
(Rockdale Storage) LGIA Filing to be
effective 12/8/2023.
Filed Date: 12/20/23.
Accession Number: 20231220–5167.
Comment Date: 5 p.m. ET 1/10/24.
Docket Numbers: ER24–715–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2023–12–20_SA 4218 Union ElectricGrain Belt TCA (H104 H105) to be
effective 2/19/2024.
Filed Date: 12/20/23.
Accession Number: 20231220–5202.
Comment Date: 5 p.m. ET 1/10/24.
Docket Numbers: ER24–716–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to ISA, Service Agreement
No. 6232; Queue No. AE1–071 to be
effective 2/19/2024.
Filed Date: 12/20/23.
Accession Number: 20231220–5207.
Comment Date: 5 p.m. ET 1/10/24.
Docket Numbers: ER24–717–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Amendment to ISA, Service Agreement
No. 6220; Queue No. AB2–037 to be
effective 2/19/2024.
Filed Date: 12/20/23.
Accession Number: 20231220–5238.
Comment Date: 5 p.m. ET 1/10/24.
Docket Numbers: ER24–718–000.
Applicants: Oklahoma Gas and
Electric Company.
Description: § 205(d) Rate Filing:
Normal filing 2023 Dec to be effective
11/12/2010.
Filed Date: 12/20/23.
Accession Number: 20231220–5245.
Comment Date: 5 p.m. ET 1/10/24.pm
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
PO 00000
Frm 00082
Fmt 4703
Sfmt 4703
89443
Any person desiring to intervene, to
protest, or to answer a complaint in any
of the above proceedings must file in
accordance with Rules 211, 214, or 206
of the Commission’s Regulations (18
CFR 385.211, 385.214, or 385.206) on or
before 5:00 p.m. Eastern time on the
specified comment date. Protests may be
considered, but intervention is
necessary to become a party to the
proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: December 20, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–28544 Filed 12–26–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2197–144]
Cube Yadkin Generation, LLC; Notice
of Application for a Non-Capacity
Amendment of License Accepted for
Filing, Soliciting Comments, Motions
To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Non-Capacity
Amendment of License.
b. Project No.: 2197–144.
c. Date Filed: June 20, 2023, and
supplemented on August 18, 2023, and
December 1, 2023.
d. Applicant: Cube Yadkin
Generation, LLC.
e. Name of Project: Yadkin
Hydroelectric Project.
f. Location: The project is located on
the Yadkin River in Davie, Davidson,
E:\FR\FM\27DEN1.SGM
27DEN1
ddrumheller on DSK120RN23PROD with NOTICES1
89444
Federal Register / Vol. 88, No. 247 / Wednesday, December 27, 2023 / Notices
Montgomery, Rowan, and Stanly
counties, North Carolina. The project
does not include Federal lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Jody Smet, Vice
President, Engineering and Regulatory
Affairs, 7315 Wisconsin Avenue, Suite
1100W, Bethesda, Maryland 20814,
(240) 482–2700, Jody.Smet@
eaglecreekre.com.
i. FERC Contact: Aneela Mousam,
(202) 502–8357, aneela.mousam@
ferc.gov.
j. Cooperating agencies: With this
notice, the Commission is inviting
Federal, State, local, and Tribal agencies
with jurisdiction and/or special
expertise with respect to environmental
issues affected by the proposal, that
wish to cooperate in the preparation of
any environmental document, if
applicable, to follow the instructions for
filing such requests described in item m
below. Cooperating agencies should
note the Commission’s policy that
agencies that cooperate in the
preparation of any environmental
document cannot also intervene. See 94
FERC ¶ 61,076 (2001).
k. Water Quality Certification: The
applicant must file no later than 60 days
following the date of issuance of this
notice: (1) a copy of the water quality
certification; (2) a copy of the request for
certification, including proof of the date
on which the certifying agency received
the request; or (3) evidence of waiver of
water quality certification.’’
m. Deadline for filing comments,
motions to intervene, and protests:
January 19, 2024.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
VerDate Sep<11>2014
19:00 Dec 26, 2023
Jkt 262001
Rockville, Maryland 20852. The first
page of any filing should include the
docket number P–2197–144. Comments
emailed to Commission staff are not
considered part of the Commission
record.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
l. Description of Request: Cube
Yadkin Generation, LLC (licensee)
requests Commission approval to
replace the Unit 1 turbine-generator at
the Falls Development. The new
turbine-generator unit would be placed
in the same location as the existing
turbine-generator unit. The proposed
upgrades would increase the Falls
Development’s installed capacity from
31.13 megawatt (MW) to 35.56 MW. The
maximum hydraulic capacity would
increase from 8,855 cubic feet per
second (cfs) to 9,270 cfs (4.7% increase).
The licensee does not anticipate any
adverse effect to environmental
resources as a result of the proposed
amendment.
m. Locations of the Application: This
filing may be viewed on the
Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. Agencies may
obtain copies of the application directly
from the applicant.
n. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
o. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
PO 00000
Frm 00083
Fmt 4703
Sfmt 4703
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
p. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
q. The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: December 20, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–28537 Filed 12–26–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos. 6055–006, 6055–007, 6055–
008]
Jeffersonville Hydroelectric Co.; Notice
of Application for Surrender of
Exemption, Soliciting Comments,
Motions To Intervene, and Protests
and Notice of Effectiveness of
Withdrawal of Application To
Surrender Exemption
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
E:\FR\FM\27DEN1.SGM
27DEN1
Agencies
[Federal Register Volume 88, Number 247 (Wednesday, December 27, 2023)]
[Notices]
[Pages 89443-89444]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-28537]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2197-144]
Cube Yadkin Generation, LLC; Notice of Application for a Non-
Capacity Amendment of License Accepted for Filing, Soliciting Comments,
Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Non-Capacity Amendment of License.
b. Project No.: 2197-144.
c. Date Filed: June 20, 2023, and supplemented on August 18, 2023,
and December 1, 2023.
d. Applicant: Cube Yadkin Generation, LLC.
e. Name of Project: Yadkin Hydroelectric Project.
f. Location: The project is located on the Yadkin River in Davie,
Davidson,
[[Page 89444]]
Montgomery, Rowan, and Stanly counties, North Carolina. The project
does not include Federal lands.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Jody Smet, Vice President, Engineering and
Regulatory Affairs, 7315 Wisconsin Avenue, Suite 1100W, Bethesda,
Maryland 20814, (240) 482-2700, [email protected].
i. FERC Contact: Aneela Mousam, (202) 502-8357,
[email protected].
j. Cooperating agencies: With this notice, the Commission is
inviting Federal, State, local, and Tribal agencies with jurisdiction
and/or special expertise with respect to environmental issues affected
by the proposal, that wish to cooperate in the preparation of any
environmental document, if applicable, to follow the instructions for
filing such requests described in item m below. Cooperating agencies
should note the Commission's policy that agencies that cooperate in the
preparation of any environmental document cannot also intervene. See 94
FERC ] 61,076 (2001).
k. Water Quality Certification: The applicant must file no later
than 60 days following the date of issuance of this notice: (1) a copy
of the water quality certification; (2) a copy of the request for
certification, including proof of the date on which the certifying
agency received the request; or (3) evidence of waiver of water quality
certification.''
m. Deadline for filing comments, motions to intervene, and
protests: January 19, 2024.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, and protests using the Commission's
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments up to 6,000 characters, without
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact
information at the end of your comments. For assistance, please contact
FERC Online Support at [email protected], (866) 208-3676 (toll
free), or (202) 502-8659 (TTY). In lieu of electronic filing, you may
submit a paper copy. Submissions sent via the U.S. Postal Service must
be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier must be addressed to: Kimberly
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852. The first page of any filing should
include the docket number P-2197-144. Comments emailed to Commission
staff are not considered part of the Commission record.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency.
l. Description of Request: Cube Yadkin Generation, LLC (licensee)
requests Commission approval to replace the Unit 1 turbine-generator at
the Falls Development. The new turbine-generator unit would be placed
in the same location as the existing turbine-generator unit. The
proposed upgrades would increase the Falls Development's installed
capacity from 31.13 megawatt (MW) to 35.56 MW. The maximum hydraulic
capacity would increase from 8,855 cubic feet per second (cfs) to 9,270
cfs (4.7% increase). The licensee does not anticipate any adverse
effect to environmental resources as a result of the proposed
amendment.
m. Locations of the Application: This filing may be viewed on the
Commission's website at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. You may also register
online at https://www.ferc.gov/docs-filing/esubscription.asp to be
notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or email
[email protected], for TTY, call (202) 502-8659. Agencies may
obtain copies of the application directly from the applicant.
n. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
o. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214, respectively. In determining the appropriate action to take, the
Commission will consider all protests or other comments filed, but only
those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular application.
p. Filing and Service of Documents: Any filing must (1) bear in all
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO
INTERVENE'' as applicable; (2) set forth in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person commenting, protesting or intervening; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis. Any filing made by an intervenor must be accompanied
by proof of service on all persons listed in the service list prepared
by the Commission in this proceeding, in accordance with 18 CFR
385.2010.
q. The Commission's Office of Public Participation (OPP) supports
meaningful public engagement and participation in Commission
proceedings. OPP can help members of the public, including landowners,
environmental justice communities, Tribal members and others, access
publicly available information and navigate Commission processes. For
public inquiries and assistance with making filings such as
interventions, comments, or requests for rehearing, the public is
encouraged to contact OPP at (202) 502-6595 or [email protected].
Dated: December 20, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-28537 Filed 12-26-23; 8:45 am]
BILLING CODE 6717-01-P