Brown Bear II Hydro, Inc.; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments, 87420-87421 [2023-27750]
Download as PDF
87420
Federal Register / Vol. 88, No. 241 / Monday, December 18, 2023 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER24–619–000]
khammond on DSKJM1Z7X2PROD with NOTICES
MS Solar 5, LLC; Supplemental Notice
That Initial Market-Based Rate Filing
Includes Request for Blanket Section
204 Authorization
This is a supplemental notice in the
above-referenced proceeding of MS
Solar 5, LLC’s application for marketbased rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is January 2,
2024.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
may mail similar pleadings to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426. Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
VerDate Sep<11>2014
17:41 Dec 15, 2023
Jkt 262001
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
Dated: December 12, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–27749 Filed 12–15–23; 8:45 am]
BILLING CODE 6717–01–P
eLibrary link. Click on the eLibrary link,
click on ‘‘General Search’’ and enter the
docket number, excluding the last three
digits in the Docket Number field (i.e.,
AD18–6). Be sure you have selected an
appropriate date range. The Commission
also offers a free service called
eSubscription which allows you to keep
track of all formal issuances and
submittals in specific dockets. This can
reduce the amount of time you spend
researching proceedings by
automatically providing you with
electronic notification of these filings
and direct links to the documents. Go to
the Commission’s website
(www.ferc.gov), select the FERC Online
option from the left-hand column, and
click on eSubscription. Users must be
registered in order to use eSubscription.
The revised version of Chapter 11 is
also available on the Commission’s
Division of Dam Safety and Inspections
website at: Engineering Guidelines for
the Evaluation of Hydropower Projects |
Federal Energy Regulatory Commission
(ferc.gov).
For assistance with any of the
Commission’s online systems, please
contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
at (866) 208–3676, or for TTY, contact
(202) 502–8258.
Dated: December 12, 2023.
Kimberly D. Bose,
Secretary.
DEPARTMENT OF ENERGY
[FR Doc. 2023–27751 Filed 12–15–23; 8:45 am]
Federal Energy Regulatory
Commission
BILLING CODE 6717–01–P
[Docket No. AD18–6–000]
DEPARTMENT OF ENERGY
Notice of Availability of Revised Final
Engineering Guidelines for the
Evaluation of Hydropower Projects:
Chapter 11—Arch Dams
Federal Energy Regulatory
Commission
On March 14, 2018, the Federal
Energy Regulatory Commission issued a
Notice of Availability of Final
Engineering Guidelines for the
Evaluation of Hydropower Projects:
Chapter 11—Arch Dams. Appendix 11A
provides an approach to estimate
erosion of rock downstream of arch
dams and is applicable to similar
evaluations at other types of dams.
Commission staff recently became aware
of errors in several equations and one
table in Appendix 11A; this notice
provides a revised version of Chapter 11
correcting those errors.
All information related to ‘‘Chapter
11—Arch Dams,’’ including the draft
chapter, all submitted comments, the
final chapter, and the revised final
chapter incorporating the revisions to
Appendix A, can be found on the FERC
website (www.ferc.gov) using the
Brown Bear II Hydro, Inc.; Notice of
Application Tendered for Filing With
the Commission and Establishing
Procedural Schedule for Licensing and
Deadline for Submission of Final
Amendments
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
[Project No. 3428–205]
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 3428–2050.
c. Date Filed: November 29, 2023.
d. Applicant: Brown Bear II Hydro,
Inc.
e. Name of Project: Worumbo
Hydroelectric Project.
f. Location: On the Androscoggin
River, in Androscoggin County, Maine.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
E:\FR\FM\18DEN1.SGM
18DEN1
Federal Register / Vol. 88, No. 241 / Monday, December 18, 2023 / Notices
h. Applicant Contact: Matthew Nini,
Brown Bear II Hydro Inc., (973) 998–
8171 or email at matthew.nini@
eaglecreekre.com.
i. FERC Contact: Ryan Hansen at (202)
502–8074 or email at ryan.hansen@
ferc.gov. j. The application is not ready
for environmental analysis at this time.
k. Project Description: The project
consists of the following existing
facilities: (1) an 870-foot-long concrete
gravity dam with an 116-foot-long flood
spillway containing four 18-foot-wide
and 26-foot-high vertical lift gates and
three flashboard sections including
(from left to right facing downstream) a
233-foot-long ogee spillway topped by
38 2-foot-high hinged steel flashboard
panels, a 167-foot-long concrete gravity
section topped by 21 2-foot-high steel
flashboard panels controlled by
inflatable air bags, and a 349-foot-long
concrete gravity section topped by 26
steel flashboard panels ranging in height
from 1.5 to 1.9-foot-high controlled by
inflatable air bags; (2) a reservoir with
a gross storage capacity of 2,000 acrefeet and a surface area of 240 acres at
the normal full-pond elevation of 98.5
feet; (3) a 337-foot-long concrete
retaining wall with a top elevation of
108 feet leading to the intake structure;
(4) a concrete intake structure integral
with the powerhouse, containing two
vertical slide gates each 33-foot-wide
and 40- foot-high which are normally
fully open and protected by trash racks;
(5) a 105-foot-wide, 145-foot-long
reinforced concrete powerhouse
containing two Kaplan bulb turbines
each with a generating capacity of 10.5
MW at 28.5 feet net head; (6) an
approximately 30-foot-high vertical fishlift, four vertical attraction pumps, an
eight-foot-long and 8-foot-wide hopper
lift tank, and a viewing room; (7) an
upstream eel passage system consisting
of two two-foot-wide, seven-foot-long
bristled ramps, and an eel trap; (8) a
downstream fish passage system
consisting of three entry way gates with
trashracks, a 36-inch-diameter
downstream passage pipe, and a 30-footwide, 20-foot-long, 10-foot-deep plunge
pool; (9) an 850-foot-long,
approximately 80-foot wide, tailrace
excavated from the downstream
powerhouse wall to the State Route 125
(Canal Street) bridge, flanked by a 200foot-long concrete retaining wall on the
left and a 230-foot-long concrete
training wall on the right; (10) a 3,540foot-long, 34.5-kilovolt (kV)
transmission line leading to the Central
Maine Power Company’s Lisbon Falls
substation; and (11) appurtenant
facilities. Brown Bear Hydro II Hydro,
LLC has not proposed any new
construction at the project. The project
is operated in a run-of-river mode and
average annual generation from the
project is 83,911 megawatt-hours.
l. Location of the Application: In
addition to publishing the full text of
this notice in the Federal Register, the
Commission provides all interested
persons an opportunity to view and/or
print the contents of this notice, as well
as other documents in the proceeding
(e.g., license application) via the
internet through the Commission’s
Home Page (https://www.ferc.gov) using
the ‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document (P–3428). For assistance,
contact FERC at FERCOnlineSupport@
ferc.gov or call toll-free, (866) 208–3676
or (202) 502–8659 (TTY).
m. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Procedural Schedule: The
application will be processed according
to the following preliminary Hydro
Licensing Schedule. The need for
additional tagging and cfd modeling
studies will influence the schedule
below. Revisions to the schedule may be
made as appropriate.
Milestone
Target date
Issue Deficiency Letter (if necessary) ............................................................................................................................................
Issue Additional Information Request (if necessary) ......................................................................................................................
Issue Study Modification Determination .........................................................................................................................................
Notice of Acceptance/Notice of Ready for Environmental Analysis (if no studies are needed) ....................................................
Filing of recommendations, preliminary terms and conditions, and fishway prescriptions ............................................................
o. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Dated: December 12, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–27750 Filed 12–15–23; 8:45 am]
BILLING CODE 6717–01–P
khammond on DSKJM1Z7X2PROD with NOTICES
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC24–24–000.
Applicants: Georgia Power Company.
VerDate Sep<11>2014
17:41 Dec 15, 2023
Jkt 262001
Description: Application for
Authorization Under Section 203 of the
Federal Power Act of Georgia Power
Company.
Filed Date: 12/12/23.
Accession Number: 20231212–5177.
Comment Date: 5 p.m. ET 1/2/24.
Take notice that the Commission
received the following Complaints and
Compliance filings in EL Dockets:
Docket Numbers: EL24–40–000.
Applicants: City of Tacoma,
Department of Public Utilities, Light
Division Tacoma Power v. California
Independent System Operator
Corporation.
Description: Complaint of City of
Tacoma, Department of Public Utilities,
Light Division d/b/a Tacoma Power, v.
California Independent System Operator
Corporation.
Filed Date: 12/12/23.
Accession Number: 20231212–5029.
Comment Date: 5 p.m. ET 1/2/24.
PO 00000
Frm 00037
Fmt 4703
87421
Sfmt 4703
December 2023.
January 2024.
February 2024.
March 2024.
June 2024.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–2732–022;
ER10–2733–022; ER10–2734–022;
ER10–2736–022; ER10–2737–022;
ER10–2741–022; ER10–2749–023;
ER10–2752–022; ER12–2492–018;
ER12–2493–018; ER12–2494–018;
ER12–2495–018; ER12–2496–018;
ER16–2455–012; ER16–2456–012;
ER16–2457–012; ER16–2459–012;
ER18–1404–008; ER19–2096–005.
Applicants: Emera Energy LNG, LLC,
NS Power Energy Marketing Inc., Emera
Energy Services Subsidiary No. 15 LLC,
Emera Energy Services Subsidiary No.
13 LLC, Emera Energy Services
Subsidiary No. 12 LLC, Emera Energy
Services Subsidiary No. 11 LLC, Emera
Energy Services Subsidiary No. 10 LLC,
Emera Energy Services Subsidiary No. 9
LLC, Emera Energy Services Subsidiary
No. 8 LLC, Emera Energy Services
E:\FR\FM\18DEN1.SGM
18DEN1
Agencies
[Federal Register Volume 88, Number 241 (Monday, December 18, 2023)]
[Notices]
[Pages 87420-87421]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-27750]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 3428-205]
Brown Bear II Hydro, Inc.; Notice of Application Tendered for
Filing With the Commission and Establishing Procedural Schedule for
Licensing and Deadline for Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 3428-2050.
c. Date Filed: November 29, 2023.
d. Applicant: Brown Bear II Hydro, Inc.
e. Name of Project: Worumbo Hydroelectric Project.
f. Location: On the Androscoggin River, in Androscoggin County,
Maine.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
[[Page 87421]]
h. Applicant Contact: Matthew Nini, Brown Bear II Hydro Inc., (973)
998-8171 or email at [email protected].
i. FERC Contact: Ryan Hansen at (202) 502-8074 or email at
[email protected]. j. The application is not ready for environmental
analysis at this time.
k. Project Description: The project consists of the following
existing facilities: (1) an 870-foot-long concrete gravity dam with an
116-foot-long flood spillway containing four 18-foot-wide and 26-foot-
high vertical lift gates and three flashboard sections including (from
left to right facing downstream) a 233-foot-long ogee spillway topped
by 38 2-foot-high hinged steel flashboard panels, a 167-foot-long
concrete gravity section topped by 21 2-foot-high steel flashboard
panels controlled by inflatable air bags, and a 349-foot-long concrete
gravity section topped by 26 steel flashboard panels ranging in height
from 1.5 to 1.9-foot-high controlled by inflatable air bags; (2) a
reservoir with a gross storage capacity of 2,000 acre-feet and a
surface area of 240 acres at the normal full-pond elevation of 98.5
feet; (3) a 337-foot-long concrete retaining wall with a top elevation
of 108 feet leading to the intake structure; (4) a concrete intake
structure integral with the powerhouse, containing two vertical slide
gates each 33-foot-wide and 40- foot-high which are normally fully open
and protected by trash racks; (5) a 105-foot-wide, 145-foot-long
reinforced concrete powerhouse containing two Kaplan bulb turbines each
with a generating capacity of 10.5 MW at 28.5 feet net head; (6) an
approximately 30-foot-high vertical fish-lift, four vertical attraction
pumps, an eight-foot-long and 8-foot-wide hopper lift tank, and a
viewing room; (7) an upstream eel passage system consisting of two two-
foot-wide, seven-foot-long bristled ramps, and an eel trap; (8) a
downstream fish passage system consisting of three entry way gates with
trashracks, a 36-inch-diameter downstream passage pipe, and a 30-foot-
wide, 20-foot-long, 10-foot-deep plunge pool; (9) an 850-foot-long,
approximately 80-foot wide, tailrace excavated from the downstream
powerhouse wall to the State Route 125 (Canal Street) bridge, flanked
by a 200-foot-long concrete retaining wall on the left and a 230-foot-
long concrete training wall on the right; (10) a 3,540-foot-long, 34.5-
kilovolt (kV) transmission line leading to the Central Maine Power
Company's Lisbon Falls substation; and (11) appurtenant facilities.
Brown Bear Hydro II Hydro, LLC has not proposed any new construction at
the project. The project is operated in a run-of-river mode and average
annual generation from the project is 83,911 megawatt-hours.
l. Location of the Application: In addition to publishing the full
text of this notice in the Federal Register, the Commission provides
all interested persons an opportunity to view and/or print the contents
of this notice, as well as other documents in the proceeding (e.g.,
license application) via the internet through the Commission's Home
Page (https://www.ferc.gov) using the ``eLibrary'' link. Enter the
docket number excluding the last three digits in the docket number
field to access the document (P-3428). For assistance, contact FERC at
[email protected] or call toll-free, (866) 208-3676 or (202)
502-8659 (TTY).
m. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
n. Procedural Schedule: The application will be processed according
to the following preliminary Hydro Licensing Schedule. The need for
additional tagging and cfd modeling studies will influence the schedule
below. Revisions to the schedule may be made as appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Issue Deficiency Letter (if necessary).. December 2023.
Issue Additional Information Request (if January 2024.
necessary).
Issue Study Modification Determination.. February 2024.
Notice of Acceptance/Notice of Ready for March 2024.
Environmental Analysis (if no studies
are needed).
Filing of recommendations, preliminary June 2024.
terms and conditions, and fishway
prescriptions.
------------------------------------------------------------------------
o. Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: December 12, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-27750 Filed 12-15-23; 8:45 am]