Pike Island Hydropower Corporation, Pike Island Hydropower Project, LLC; Notice of Competing Preliminary Permit Applications Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 67040-67041 [2021-25622]
Download as PDF
67040
Federal Register / Vol. 86, No. 224 / Wednesday, November 24, 2021 / Notices
Affairs, (202) 502–8004,
Sarah.Mckinley@ferc.gov.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Dated: November 17, 2021.
Kimberly D. Bose,
Secretary.
[Docket No. RM21–17–000]
[FR Doc. 2021–25619 Filed 11–23–21; 8:45 am]
khammond on DSKJM1Z7X2PROD with NOTICES
Building for the Future Through
Electric Regional Transmission
Planning and Cost Allocation and
Generator Interconnection; Notice
Inviting Post-Technical Conference
Comments
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
On November 15, 2021, the Federal
Energy Regulatory Commission
(Commission) staff convened a technical
conference to discuss potential reforms
related to regional transmission
planning processes.
All interested persons are invited to
file post-technical conference comments
to address the issues raised during that
event on or before November 30, 2021.
Commenters are encouraged to include
such comments with any reply
comments that they are filing to the
Advance Notice of Proposed
Rulemaking (ANOPR) in this docket. To
the extent that commenters combine
their technical conference and reply
comments into one filing, commenters
should clearly identify which comments
are being raised in response to the
technical conference.
Comments may be filed electronically
via the internet.1 Instructions are
available on the Commission’s website
https://www.ferc.gov/docs-filing/
efiling.asp. For assistance, please
contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, submissions
sent via the U.S. Postal Service must be
addressed to: Federal Energy Regulatory
Commission, Office of the Secretary,
888 First Street NE, Washington, DC
20426. Submissions sent via any other
carrier must be addressed to: Federal
Energy Regulatory Commission, Office
of the Secretary, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
For more information about this
Notice, please contact:
David Tobenkin (Technical
Information), Office of Energy Policy
and Innovation, (202) 502–6445,
David.Tobenkin@ferc.gov
Lina Naik (Legal Information), Office of
the General Counsel, (202) 502–8882,
Lina.Naik@ferc.gov
Sarah McKinley (Logistical
Information), Office of External
1 See
18 CFR 385.2001(a)(1)(iii) (2020).
VerDate Sep<11>2014
17:05 Nov 23, 2021
Jkt 256001
Federal Energy Regulatory
Commission
[Project Nos. 15230–000, 15231–000]
Pike Island Hydropower Corporation,
Pike Island Hydropower Project, LLC;
Notice of Competing Preliminary
Permit Applications Accepted for
Filing and Soliciting Comments,
Motions To Intervene, and Competing
Applications
On August 2, 2021, Pike Island
Hydropower Corporation filed a
preliminary permit application,
pursuant to section 4(f) of the Federal
Power Act, proposing to study the
feasibility of a hydropower project at the
U.S. Army Corps of Engineers’ (Corps)
Pike Island Lock and Dam, located on
the Ohio River near the City of
Wheeling, West Virginia. On August 13,
2021, Pike Island Hydropower Project,
LLC filed a preliminary permit
application to study the feasibility of a
hydropower project, at same site and
location, on the same river, near
Wheeling, West Virginia. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
Pike Island Hydropower Corporation’s
Pike Island Locks and Dam
Hydroelectric Project (Project No.
15230–000) would consist of: (1) 160foot-wide by 100 to 200-foot-long intake
section containing trashracks; (2) a new
160-foot-wide by 160-foot-long concrete
powerhouse containing two, three, or
four identical Kaplan pit turbinegenerators with a combined net power
capacity of 20 megawatts (MW); (3) a
new 160-foot-wide, 300-foot-long
tailrace channel downstream of the
powerhouse. The height of the proposed
powerhouse and intake structure would
be 658 feet above mean sea level (msl);
(4) a new 200-foot-wide by 200-foot-long
substation; (5) a new 1.4-mile-long, 69
kilovolt (kV), three phase overhead
transmission line connecting the project
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
substation with an existing substation in
Tiltonsville, OH; and (6) appurtenant
facilities. The estimated average annual
energy production is 151 Gigawatthours (‘‘GWh’’).
Applicant Contact: Mr. Joel Herm,
Pike Island Hydropower Corporation,
P.O. Box 224, Rhinebeck, NY 12572–
0224; Telephone: 917–244–3607.
Pike Island Hydropower Project,
LLC’s proposed Pike Island
Hydroelectric Project (Project No.
15231–000) would consist of: (1) 225foot-wide by 50-foot-long intake section
containing trashracks, sluice gates,
intake gates; (2) a new 160-foot-wide by
140-foot-long concrete powerhouse
containing three new pit-type Kaplan
turbines rated at 15 MW each; (3) a new
200-foot wide, 500-foot-long tailrace
channel downstream of the powerhouse.
The height of the proposed powerhouse
and intake structure is 654 feet above
msl; (4) a new 80-foot-wide by 120-footlong, substation; (5) a new 1.288-milelong, 138 kV, three phase overhead
transmission line connecting the new
project substation with an existing
utility substation located in Yorkville,
Ohio; and (6) appurtenant facilities. The
estimated average annual energy
production is 225 GWh.
Applicant Contact: Mr. Erik Steimle,
Rye Development, LLC, One Beacon
Street, 15th Floor, Boston, MA 02108;
Telephone: (503) 998–0230.
FERC Contact: Tyrone A. Williams,
tyrone.williams@ferc.gov or (202) 502–
6331.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file the
requested information using the
Commission’s eFiling system at https://
ferconline.ferc.gov/FERCOnline.aspx.
For assistance, please contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper request.
Submissions sent via the U.S. Postal
Service must be addressed to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Room 1A, Washington, DC 20426.
New Submissions sent via any other
carrier must be addressed to: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852.
The first page of any filing should
E:\FR\FM\24NON1.SGM
24NON1
Federal Register / Vol. 86, No. 224 / Wednesday, November 24, 2021 / Notices
include docket number P–15320–000 or
P–15321–000.
More information about the projects,
including a copy of the applications,
can be viewed or printed on the
‘‘eLibrary’’ link of Commission’s
website at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (P–15320 or P–15321) in the
docket number field to access the
documents. For assistance, contact
FERC Online Support.
Dated: November 17, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–25622 Filed 11–23–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
khammond on DSKJM1Z7X2PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG22–25–000.
Applicants: Gruver Wind
Interconnection, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Gruver Wind
Interconnection, LLC.
Filed Date: 11/18/21.
Accession Number: 20211118–5064.
Comment Date: 5 p.m. ET 12/9/21.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER20–1736–003.
Applicants: Emera Maine.
Description: Compliance filing:
Versant Power submits tariff filing per
35: Joint Settlement Offer Re: Maine
Public Distr. Ord. 864 Compliance
(ER20–1736-) to be effective 6/1/2020.
Filed Date: 11/18/21.
Accession Number: 20211118–5055.
Comment Date: 5 p.m. ET 12/9/21.
Docket Numbers: ER21–2438–002.
Applicants: Southwest Power Pool,
Inc.
Description: Tariff Amendment:
3630SR1 Maverick Wind Project GIA—
Deficiency Response to be effective
6/29/2021.
Filed Date: 11/18/21.
Accession Number: 20211118–5142.
Comment Date: 5 p.m. ET 12/9/21.
Docket Numbers: ER21–2916–000;
ER21–2917–000.
Applicants: Milford Wind Corridor
Phase II, LLC, Milford Wind Corridor
Phase I, LLC.
Description: Supplement to Notice of
Change in Category Seller Status for
VerDate Sep<11>2014
17:05 Nov 23, 2021
Jkt 256001
Milford Wind Corridor Phase I, LLC, et
al.
Filed Date: 11/17/21.
Accession Number: 20211117–5204.
Comment Date: 5 p.m. ET 12/8/21.
Docket Numbers: ER22–423–000.
Applicants: Columbia Utilities Power
Business LLC.
Description: Baseline eTariff Filing:
Tariffs and Agreements to be effective
1/17/2022.
Filed Date: 11/18/21.
Accession Number: 20211118–5000.
Comment Date: 5 p.m. ET 12/9/21.
Docket Numbers: ER22–424–000.
Applicants: Assembly Solar III, LLC.
Description: Baseline eTariff Filing:
Reactive Power Compensation Filing to
be effective 12/31/2021.
Filed Date: 11/18/21.
Accession Number: 20211118–5033.
Comment Date: 5 p.m. ET 12/9/21.
Docket Numbers: ER22–425–000.
Applicants: Enerwise Global
Technologies, LLC.
Description: Baseline eTariff Filing:
Application for Market-Based Rate
Authorization and Request for
Exemption to be effective 11/19/2021.
Filed Date: 11/18/21.
Accession Number: 20211118–5037.
Comment Date: 5 p.m. ET 12/9/21.
Docket Numbers: ER22–427–000.
Applicants: Alabama Power
Company.
Description: Tariff Amendment: AL
Solar C (Cusseta Solar & Storage) LGIA
Termination Filing to be effective
11/18/2021.
Filed Date: 11/18/21.
Accession Number: 20211118–5116.
Comment Date: 5 p.m. ET 12/9/21.
Docket Numbers: ER22–428–000.
Applicants: Alabama Power
Company.
Description: Tariff Amendment:
Hancock County Solar Project LGIA
Termination Filing to be effective
11/18/2021.
Filed Date: 11/18/21.
Accession Number: 20211118–5120.
Comment Date: 5 p.m. ET 12/9/21.
Docket Numbers: ER22–429–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) Rate Filing:
Revisions to OATT and OA Definitions
No-load Cost and Incremental Energy
Offer to be effective 1/18/2022.
Filed Date: 11/18/21.
Accession Number: 20211118–5147.
Comment Date: 5 p.m. ET 12/9/21.
Docket Numbers: ER22–430–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2021–11–18_SA 3740 Entergy
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
67041
Louisiana-Willis Pond GIA (J1421) to be
effective 1/18/2022.
Filed Date: 11/18/21.
Accession Number: 20211118–5151.
Comment Date: 5 p.m. ET 12/9/21.
Docket Numbers: ER22–431–000.
Applicants: Pacific Gas and Electric
Company.
Description: § 205(d) Rate Filing:
CCSF Sunol Golf Course Project filing
(SA 275) to be effective 1/18/2022.
Filed Date: 11/18/21.
Accession Number: 20211118–5161.
Comment Date: 5 p.m. ET 12/9/21.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: November 18, 2021.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2021–25681 Filed 11–23–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER22–399–000]
Meadow Lake Solar Park LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of Meadow
Lake Solar Park LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
E:\FR\FM\24NON1.SGM
24NON1
Agencies
[Federal Register Volume 86, Number 224 (Wednesday, November 24, 2021)]
[Notices]
[Pages 67040-67041]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-25622]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project Nos. 15230-000, 15231-000]
Pike Island Hydropower Corporation, Pike Island Hydropower
Project, LLC; Notice of Competing Preliminary Permit Applications
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
On August 2, 2021, Pike Island Hydropower Corporation filed a
preliminary permit application, pursuant to section 4(f) of the Federal
Power Act, proposing to study the feasibility of a hydropower project
at the U.S. Army Corps of Engineers' (Corps) Pike Island Lock and Dam,
located on the Ohio River near the City of Wheeling, West Virginia. On
August 13, 2021, Pike Island Hydropower Project, LLC filed a
preliminary permit application to study the feasibility of a hydropower
project, at same site and location, on the same river, near Wheeling,
West Virginia. The sole purpose of a preliminary permit, if issued, is
to grant the permit holder priority to file a license application
during the permit term. A preliminary permit does not authorize the
permit holder to perform any land-disturbing activities or otherwise
enter upon lands or waters owned by others without the owners' express
permission.
Pike Island Hydropower Corporation's Pike Island Locks and Dam
Hydroelectric Project (Project No. 15230-000) would consist of: (1)
160-foot-wide by 100 to 200-foot-long intake section containing
trashracks; (2) a new 160-foot-wide by 160-foot-long concrete
powerhouse containing two, three, or four identical Kaplan pit turbine-
generators with a combined net power capacity of 20 megawatts (MW); (3)
a new 160-foot-wide, 300-foot-long tailrace channel downstream of the
powerhouse. The height of the proposed powerhouse and intake structure
would be 658 feet above mean sea level (msl); (4) a new 200-foot-wide
by 200-foot-long substation; (5) a new 1.4-mile-long, 69 kilovolt (kV),
three phase overhead transmission line connecting the project
substation with an existing substation in Tiltonsville, OH; and (6)
appurtenant facilities. The estimated average annual energy production
is 151 Gigawatt-hours (``GWh'').
Applicant Contact: Mr. Joel Herm, Pike Island Hydropower
Corporation, P.O. Box 224, Rhinebeck, NY 12572-0224; Telephone: 917-
244-3607.
Pike Island Hydropower Project, LLC's proposed Pike Island
Hydroelectric Project (Project No. 15231-000) would consist of: (1)
225-foot-wide by 50-foot-long intake section containing trashracks,
sluice gates, intake gates; (2) a new 160-foot-wide by 140-foot-long
concrete powerhouse containing three new pit-type Kaplan turbines rated
at 15 MW each; (3) a new 200-foot wide, 500-foot-long tailrace channel
downstream of the powerhouse. The height of the proposed powerhouse and
intake structure is 654 feet above msl; (4) a new 80-foot-wide by 120-
foot-long, substation; (5) a new 1.288-mile-long, 138 kV, three phase
overhead transmission line connecting the new project substation with
an existing utility substation located in Yorkville, Ohio; and (6)
appurtenant facilities. The estimated average annual energy production
is 225 GWh.
Applicant Contact: Mr. Erik Steimle, Rye Development, LLC, One
Beacon Street, 15th Floor, Boston, MA 02108; Telephone: (503) 998-0230.
FERC Contact: Tyrone A. Williams, [email protected] or (202)
502-6331.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
the requested information using the Commission's eFiling system at
https://ferconline.ferc.gov/FERCOnline.aspx. For assistance, please
contact FERC Online Support at [email protected], (866) 208-
3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic
filing, you may submit a paper request. Submissions sent via the U.S.
Postal Service must be addressed to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street NE, Room 1A,
Washington, DC 20426. New Submissions sent via any other carrier must
be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first
page of any filing should
[[Page 67041]]
include docket number P-15320-000 or P-15321-000.
More information about the projects, including a copy of the
applications, can be viewed or printed on the ``eLibrary'' link of
Commission's website at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-15320 or P-15321) in the docket number field
to access the documents. For assistance, contact FERC Online Support.
Dated: November 17, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-25622 Filed 11-23-21; 8:45 am]
BILLING CODE 6717-01-P