ECOsponsible, LLC; Notice of Termination of License (Major Project) by Implied Surrender and Soliciting Comments, Protests, and Motions To Intervene, 64197-64198 [2021-25077]
Download as PDF
Federal Register / Vol. 86, No. 219 / Wednesday, November 17, 2021 / Notices
potentially affected by the proposed
project Amendment.
If you need to make changes to your
name/address, or if you would like to
remove your name from the mailing list,
please complete one of the following
steps:
(1) Send an email to
GasProjectAddressChange@ferc.gov
stating your request. You must include
the docket number CP14–517–001 in
your request. If you are requesting a
change to your address, please be sure
to include your name and the correct
address. If you are requesting to delete
your address from the mailing list,
please include your name and address
as it appeared on this notice. This email
address is unable to accept comments.
OR
(2) Return the attached ‘‘Mailing List
Update Form’’ (appendix 2).
Additional Information
Additional information about the
project Amendment is available from
the Commission’s Office of External
Affairs, at (866) 208–FERC, or on the
FERC website at www.ferc.gov using the
eLibrary link. Click on the eLibrary link,
click on ‘‘General Search’’ and enter the
docket number in the ‘‘Docket Number’’
field. Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or (866)
208–3676, or for TTY, contact (202)
502–8659. The eLibrary link also
provides access to the texts of all formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
Public sessions or site visits will be
posted on the Commission’s calendar
located at https://www.ferc.gov/newsevents/events along with other related
information.
Dated: November 10, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–25080 Filed 11–16–21; 8:45 am]
khammond on DSKJM1Z7X2PROD with NOTICES
BILLING CODE 6717–01–P
VerDate Sep<11>2014
17:11 Nov 16, 2021
Jkt 256001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 9709–070]
ECOsponsible, LLC; Notice of
Termination of License (Major Project)
by Implied Surrender and Soliciting
Comments, Protests, and Motions To
Intervene
Take notice that the following
hydroelectric proceeding has been
initiated by the Commission:
a. Application Type: Termination of
License by Implied Surrender.
b. Project No: 9709–070.
c. Date Initiated: November 8, 2021.
d. Licensee: ECOsponsible, LLC.
e. Name of Project: Herkimer
Hydroelectric Project.
f. Location: The Herkimer
Hydroelectric Project is located on the
West Canada Creek, Herkimer County,
New York.
g. Filed Pursuant to: Standard Article
26.
h. Applicant Contact: Mr. Dennis
Ryan, ECOsponsible, LLC, 469 Snyder
Road, East Aurora, New York 14052–
9710.
i. FERC Contact: David Rudisail, (202)
502–6376, david.rudisail@ferc.gov.
j. Deadline for filing comments,
motions to intervene and protests:
December 27, 2021.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include docket
numbers P–9709–070. Comments
emailed to Commission staff are not
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
64197
considered part of the Commission
record.
k. Description of Project Facilities:
The project works include: A timber
crib dam with a 9-foot-high, 95-foot-long
section reaching a crest elevation of 420
feet mean sea level (msl) and 12-foothigh, 145-foot-long section reaching a
crest elevation of 419.2 feet msl; a
reservoir with a surface area of 19 acres,
storage capacity of 163 acre-feet, and
normal water surface elevation of 420.5
feet msl; timber flashboards; an intake
structure; a reinforced concrete and
steel powerhouse containing four
generating units with a capacity of 400
kilowatts (kW) each and an 80-kW
minimum flow generator at the base of
the dam for a total installed capacity of
1,680 kW; a 50-foot-long, 13.2-kilovolt
transmission line; and appurtenant
facilities. The project has been not
operated since 2006.
l. Description of Proceeding: License
Article 26 states in part: If the licensee
shall abandon or discontinue good faith
operation of the project or refuse or
neglect to comply with the terms of the
license and the lawful orders of the
Commission mailed to the record
address of the licensee or its agent, the
Commission will deem it to be the intent
of the licensee to surrender the license.
The project has fallen into disrepair
and has not operated since 2006. The
project was transferred to the licensee
by order dated March 12, 2015 (2015
Order). The 2015 Order required the
licensee to file a plan and schedule to
restore project operation within 60 days.
Since that time, the Commission’s
Division of Dam Safety and Inspections
New York Regional Office (NYRO) has
issued eight letters requiring the
licensee to file a plan and schedule to
make the needed repairs and to restore
project operation. The licensee has
responded over the years with at least
five plans, but all have been deficient
because they lack sufficient detail for
NYRO’s review and approval. The
licensee has never filed satisfactory
plans and specifications to repair the
project. On August 26, 2021, NYRO
inspected the project and found it in
unsatisfactory condition and largely
abandoned. The licensee did not attend
the inspection and has failed to respond
to phone calls and emails since. In a
final letter to the licensee dated October
18, 2021, NYRO again required the
licensee to reply to past letters but the
licensee has stopped responding to the
Commission.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
E:\FR\FM\17NON1.SGM
17NON1
khammond on DSKJM1Z7X2PROD with NOTICES
64198
Federal Register / Vol. 86, No. 219 / Wednesday, November 17, 2021 / Notices
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Agency Comments: Federal, state,
and local agencies are invited to file
comments on the described proceeding.
If an agency does not file comments
within the time specified for filing
comments, it will be presumed to have
no comments.
p. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS,’’ ‘‘PROTEST,’’ or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001–385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis and
otherwise comply with the requirements
of 18 CFR 4.34(b). All comments,
motions to intervene, or protests should
relate to project works which are the
subject of the implied surrender. A copy
of any protest or motion to intervene
must be served upon each
representative of the applicant specified
in the particular application. If an
intervener files comments or documents
with the Commission relating to the
merits of an issue that may affect the
responsibilities of a particular resource
agency, they must also serve a copy of
the document on that resource agency.
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: November 10, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–25077 Filed 11–16–21; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
17:11 Nov 16, 2021
Jkt 256001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: PR22–4–000.
Applicants: Rocky Mountain Natural
Gas LLC.
Description: Submits tariff filing per
284.123(b),(e)/: RMNG 2021 SOC Filing
to be effective 11/1/2021.
Filed Date: 11/8/21.
Accession Number: 20211108–5096.
Comments/Protests Due: 5 p.m. ET
11/29/21.
Docket Numbers: CP22–14–000.
Applicants: Southern Natural Gas
Company, L.L.C.
Description: Application for
Authorization to Abandon Services of
Southern Natural Gas Company, L.L.C.
Filed Date: 11/09/2021.
Accession Number: 20211109–5055.
Comment Date: 5 p.m. ET 11/30/21.
Docket Numbers: RP22–202–000.
Applicants: Tres Palacios Gas Storage
LLC.
Description: Compliance filing: Tres
Palacios Gas Storage LLC Order No.
587–Z Compliance Filing to be effective
6/1/2022.
Filed Date: 11/9/21.
Accession Number: 20211109–5152.
Comment Date: 5 p.m. ET 11/22/21.
Docket Numbers: RP22–203–000.
Applicants: ANR Storage Company.
Description: Compliance filing:
Compliance to RM96–1–042—Order No.
587–Z to be effective 6/1/2022.
Filed Date: 11/9/21.
Accession Number: 20211109–5196.
Comment Date: 5 p.m. ET 11/22/21.
Docket Numbers: RP22–204–000.
Applicants: Midwestern Gas
Transmission Company.
Description: Compliance filing:
NAESB 3.2 Compliance Filing to be
effective 6/1/2022.
Filed Date: 11/9/21.
Accession Number: 20211109–5204.
Comment Date: 5 p.m. ET 11/22/21.
Docket Numbers: RP22–205–000.
Applicants: OkTex Pipeline
Company, L.L.C.
Description: Compliance filing:
NAESB 3.2 Compliance Filing to be
effective 6/1/2022.
Filed Date: 11/9/21.
Accession Number: 20211109–5207.
Comment Date: 5 p.m. ET 11/22/21.
Docket Numbers: RP22–206–000.
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
Applicants: Guardian Pipeline, L.L.C.
Description: Compliance filing:
NAESB 3.2 Compliance Filing to be
effective 6/1/2022.
Filed Date: 11/9/21.
Accession Number: 20211109–5209.
Comment Date: 5 p.m. ET 11/22/21.
Docket Numbers: RP22–207–000.
Applicants: Viking Gas Transmission
Company.
Description: Compliance filing:
NAESB 3.2 Compliance Filing to be
effective 6/1/2022.
Filed Date: 11/9/21.
Accession Number: 20211109–5210.
Comment Date: 5 p.m. ET 11/22/21.
Docket Numbers: RP22–208–000.
Applicants: Bison Pipeline LLC.
Description: Compliance filing:
Compliance to RM96–1–042—Order No.
587–Z to be effective 6/1/2022.
Filed Date: 11/10/21.
Accession Number: 20211110–5000.
Comment Date: 5 p.m. ET 11/22/21.
Docket Numbers: RP22–209–000.
Applicants: Maritimes & Northeast
Pipeline, L.L.C.
Description: Compliance filing:
MNUS Order 587–Z (Docket RM96–1–
042) Compliance Filing to be effective 6/
1/2022.
Filed Date: 11/10/21.
Accession Number: 20211110–5022.
Comment Date: 5 p.m. ET 11/22/21.
Docket Numbers: RP22–210–000.
Applicants: NEXUS Gas
Transmission, LLC.
Description: Compliance filing:
NEXUS Order 587–Z (Docket RM96–1–
042) Compliance Filing to be effective 6/
1/2022.
Filed Date: 11/10/21.
Accession Number: 20211110–5025.
Comment Date: 5 p.m. ET 11/22/21.
Docket Numbers: RP22–211–000.
Applicants: Dominion Energy Questar
Pipeline, LLC.
Description: Compliance filing: Order
No. 587–Z—NAESB 3.2 Compliance
Filing to be effective 6/1/2022.
Filed Date: 11/10/21.
Accession Number: 20211110–5035.
Comment Date: 5 p.m. ET 11/22/21.
Docket Numbers: RP22–212–000.
Applicants: Dominion Energy
Overthrust Pipeline, LLC.
Description: Compliance filing: Order
No. 587–Z—NAESB 3.2 Compliance
Filing to be effective 6/1/2022.
Filed Date: 11/10/21.
Accession Number: 20211110–5036.
Comment Date: 5 p.m. ET 11/22/21.
Docket Numbers: RP22–213–000.
Applicants: White River Hub, LLC.
Description: Compliance filing: Order
587–Z—NAESB 3.2 Compliance Filing
to be effective 6/1/2022.
E:\FR\FM\17NON1.SGM
17NON1
Agencies
[Federal Register Volume 86, Number 219 (Wednesday, November 17, 2021)]
[Notices]
[Pages 64197-64198]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-25077]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 9709-070]
ECOsponsible, LLC; Notice of Termination of License (Major
Project) by Implied Surrender and Soliciting Comments, Protests, and
Motions To Intervene
Take notice that the following hydroelectric proceeding has been
initiated by the Commission:
a. Application Type: Termination of License by Implied Surrender.
b. Project No: 9709-070.
c. Date Initiated: November 8, 2021.
d. Licensee: ECOsponsible, LLC.
e. Name of Project: Herkimer Hydroelectric Project.
f. Location: The Herkimer Hydroelectric Project is located on the
West Canada Creek, Herkimer County, New York.
g. Filed Pursuant to: Standard Article 26.
h. Applicant Contact: Mr. Dennis Ryan, ECOsponsible, LLC, 469
Snyder Road, East Aurora, New York 14052-9710.
i. FERC Contact: David Rudisail, (202) 502-6376,
[email protected].
j. Deadline for filing comments, motions to intervene and protests:
December 27, 2021.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, and protests using the Commission's
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments up to 6,000 characters, without
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact
information at the end of your comments. For assistance, please contact
FERC Online Support at [email protected], (866) 208-3676 (toll
free), or (202) 502-8659 (TTY). In lieu of electronic filing, you may
submit a paper copy. Submissions sent via the U.S. Postal Service must
be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier must be addressed to: Kimberly
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852. The first page of any filing should
include docket numbers P-9709-070. Comments emailed to Commission staff
are not considered part of the Commission record.
k. Description of Project Facilities: The project works include: A
timber crib dam with a 9-foot-high, 95-foot-long section reaching a
crest elevation of 420 feet mean sea level (msl) and 12-foot-high, 145-
foot-long section reaching a crest elevation of 419.2 feet msl; a
reservoir with a surface area of 19 acres, storage capacity of 163
acre-feet, and normal water surface elevation of 420.5 feet msl; timber
flashboards; an intake structure; a reinforced concrete and steel
powerhouse containing four generating units with a capacity of 400
kilowatts (kW) each and an 80-kW minimum flow generator at the base of
the dam for a total installed capacity of 1,680 kW; a 50-foot-long,
13.2-kilovolt transmission line; and appurtenant facilities. The
project has been not operated since 2006.
l. Description of Proceeding: License Article 26 states in part: If
the licensee shall abandon or discontinue good faith operation of the
project or refuse or neglect to comply with the terms of the license
and the lawful orders of the Commission mailed to the record address of
the licensee or its agent, the Commission will deem it to be the intent
of the licensee to surrender the license.
The project has fallen into disrepair and has not operated since
2006. The project was transferred to the licensee by order dated March
12, 2015 (2015 Order). The 2015 Order required the licensee to file a
plan and schedule to restore project operation within 60 days. Since
that time, the Commission's Division of Dam Safety and Inspections New
York Regional Office (NYRO) has issued eight letters requiring the
licensee to file a plan and schedule to make the needed repairs and to
restore project operation. The licensee has responded over the years
with at least five plans, but all have been deficient because they lack
sufficient detail for NYRO's review and approval. The licensee has
never filed satisfactory plans and specifications to repair the
project. On August 26, 2021, NYRO inspected the project and found it in
unsatisfactory condition and largely abandoned. The licensee did not
attend the inspection and has failed to respond to phone calls and
emails since. In a final letter to the licensee dated October 18, 2021,
NYRO again required the licensee to reply to past letters but the
licensee has stopped responding to the Commission.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
[[Page 64198]]
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214, respectively. In determining the appropriate action to take, the
Commission will consider all protests or other comments filed, but only
those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular application.
o. Agency Comments: Federal, state, and local agencies are invited
to file comments on the described proceeding. If an agency does not
file comments within the time specified for filing comments, it will be
presumed to have no comments.
p. Filing and Service of Responsive Documents: Any filing must (1)
bear in all capital letters the title ``COMMENTS,'' ``PROTEST,'' or
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001-385.2005. All comments,
motions to intervene, or protests must set forth their evidentiary
basis and otherwise comply with the requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or protests should relate to project
works which are the subject of the implied surrender. A copy of any
protest or motion to intervene must be served upon each representative
of the applicant specified in the particular application. If an
intervener files comments or documents with the Commission relating to
the merits of an issue that may affect the responsibilities of a
particular resource agency, they must also serve a copy of the document
on that resource agency. A copy of all other filings in reference to
this application must be accompanied by proof of service on all persons
listed in the service list prepared by the Commission in this
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
Dated: November 10, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-25077 Filed 11-16-21; 8:45 am]