City of Abbeville; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests, 69636-69637 [2021-26581]

Download as PDF 69636 Federal Register / Vol. 86, No. 233 / Wednesday, December 8, 2021 / Notices Filed Date: 12/2/21. Accession Number: 20211202–5038. Comment Date: 5 p.m. ET 12/16/21. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: December 2, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–26584 Filed 12–7–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 11286–026] jspears on DSK121TN23PROD with NOTICES1 City of Abbeville; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Application for Temporary Variance and Approval of Reservoir Drawdown Plan. b. Project No.: 11286–026. c. Date Filed: November 16, 2021, as supplemented on November 24 and December 2, 2021. d. Applicant: City of Abbeville. e. Name of Project: Abbeville Hydroelectric Project. f. Location: The project is located on the Rocky River in Abbeville and Anderson counties, South Carolina. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791a–825r. h. Applicant Contact: Mr. Tim Hall, Public Utilities Director, City of Abbeville, 306 Cambridge Street, P.O. Box 639, Abbeville, SC 29620; (864) 366–5058. VerDate Sep<11>2014 16:53 Dec 07, 2021 Jkt 256001 i. FERC Contact: Christopher Chaney, (202) 502–6778, christopher.chaney@ ferc.gov. j. Deadline for filing comments, motions to intervene, and protests is 30 days from the issuance date of this notice by the Commission. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, and protests using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, MD 20852. The first page of any filing should include the docket number P–11286–026. Comments emailed to Commission staff are not considered part of the Commission record. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, it must also serve a copy of the document on that resource agency. k. Description of Request: The City of Abbeville (licensee) requests approval to implement a temporary drawdown of the reservoir to an elevation of 528 feet mean sea level (msl). Under the licensee’s proposal, the reservoir would be drawn down 12 feet below the seasonal minimum elevation of 540 feet msl allowed under Article 401 of the project’s license. The licensee states the drawdown is necessary to conduct repairs on the penstock fill valve. As proposed in the December 2, 2021 supplement, the drawdown would begin on January 10, 2022, and the licensee would start refilling the reservoir on PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 January 28, 2022. The licensee estimates the reservoir refill would take approximately 30 days. As required under Article 403 of the project’s license, the licensee’s request includes an associated Reservoir Drawdown Plan for Commission approval. l. Locations of the Application: This filing may also be viewed on the Commission’s website at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. Agencies may obtain copies of the application directly from the applicant. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214, respectively. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person commenting, protesting, or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. Any filing made by an intervenor must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010. E:\FR\FM\08DEN1.SGM 08DEN1 Federal Register / Vol. 86, No. 233 / Wednesday, December 8, 2021 / Notices Dated: December 2, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–26581 Filed 12–7–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. EL22–13–000; EL22–14–000] jspears on DSK121TN23PROD with NOTICES1 Seneca Generation, LLC. Yards Creek Energy, LLC; Notice of Institution of Section 206 Proceedings and Refund Effective Date On December 2, 2021, the Commission issued an order in Docket Nos. EL22–13–000 and EL22–14–000, pursuant to section 206 of the Federal Power Act (FPA), 16 U.S.C. 824e, instituting an investigation into whether Seneca Generation, LLC’s and Yards Creek Energy, LLC’s Reactive Service rate schedules are unjust and unreasonable. Seneca Generation, LLC, et al., 177 FERC ¶ 61,160 (2021). The refund effective date in Docket Nos. EL22–13–000 and EL22–14–000, established pursuant to section 206(b) of the FPA, will be the date of publication of this notice in the Federal Register. Any interested person desiring to be heard in Docket Nos. EL22–13–000 and EL22–14–000 must file a notice of intervention or motion to intervene, as appropriate, with the Federal Energy Regulatory Commission, in accordance with Rule 214 of the Commission’s Rules of Practice and Procedure, 18 CFR 385.214 (2020), within 21 days of the date of issuance of the order. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission’s Home Page (https:// www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission’s Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease (COVID–19), issued by the President on March 13, 2020. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using VerDate Sep<11>2014 16:53 Dec 07, 2021 Jkt 256001 the ‘‘eFile’’ link at https://www.ferc.gov. In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. Dated: December 2, 2021. Kimberly D. Bose, Secretary. [FR Doc. 2021–26578 Filed 12–7–21; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: RP22–377–000. Applicants: Transcontinental Gas Pipe Line Company, LLC. Description: § 4(d) Rate Filing: Negotiated Rates—Cherokee AGL— Replacement Shippers—Dec 2021 to be effective 12/1/2021. Filed Date: 12/1/21. Accession Number: 20211201–5117. Comment Date: 5 p.m. ET 12/13/21. Docket Numbers: RP22–378–000. Applicants: Transcontinental Gas Pipe Line Company, LLC. Description: § 4(d) Rate Filing: List of Non-Conforming Service Agreements (Leidy South_Interim Svc_2_3) to be effective 12/1/2021. Filed Date: 12/1/21. Accession Number: 20211201–5122. Comment Date: 5 p.m. ET 12/13/21. Docket Numbers: RP22–379–000. Applicants: Rockies Express Pipeline LLC. Description: § 4(d) Rate Filing: REX 2021–11–30 Negotiated Rate Agreements to be effective 12/1/2021. Filed Date: 12/1/21. Accession Number: 20211201–5149. Comment Date: 5 p.m. ET 12/13/21. Docket Numbers: RP22–380–000. Applicants: Alliance Pipeline L.P. Description: § 4(d) Rate Filing: Negotiated Rates—Various Dec 1 Capacity Releases to be effective 12/1/ 2021. Filed Date: 12/1/21. PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 69637 Accession Number: 20211201–5155. Comment Date: 5 p.m. ET 12/13/21. Docket Numbers: RP22–381–000. Applicants: MarkWest Pioneer, L.L.C. Description: § 4(d) Rate Filing: Quarterly Fuel Adjustment Filing to be effective 1/1/2022. Filed Date: 12/1/21. Accession Number: 20211201–5169. Comment Date: 5 p.m. ET 12/13/21. Docket Numbers: RP22–382–000. Applicants: Cameron Interstate Pipeline, LLC. Description: § 4(d) Rate Filing: Cameron Interstate Pipeline, LLC Annual Adjustment of Fuel Retainage Percentage to be effective 1/1/2022. Filed Date: 12/1/21. Accession Number: 20211201–5215. Comment Date: 5 p.m. ET 12/13/21. Docket Numbers: RP22–383–000. Applicants: MoGas Pipeline LLC. Description: § 4(d) Rate Filing: MoGas Pipeline LLC Negotiated Rate Tariff Filing to be effective 1/1/2022. Filed Date: 12/1/21. Accession Number: 20211201–5224. Comment Date: 5 p.m. ET 12/13/21. Docket Numbers: RP22–384–000. Applicants: Columbia Gas Transmission, LLC. Description: § 4(d) Rate Filing: Vitol OPT30 & OPT60 Rev Share Neg Rate Agmts to be effective 12/1/2021. Filed Date: 12/1/21. Accession Number: 20211201–5237. Comment Date: 5 p.m. ET 12/13/21. Docket Numbers: RP22–385–000. Applicants: ANR Pipeline Company. Description: § 4(d) Rate Filing: Venture Global Calcasieu 133756—Neg Rate/Non-Conforming to be effective 1/ 1/2022. Filed Date: 12/1/21. Accession Number: 20211201–5238. Comment Date: 5 p.m. ET 12/13/21. Docket Numbers: RP22–386–000. Applicants: El Paso Natural Gas Company, L.L.C. Description: § 4(d) Rate Filing: Negotiated Rate Agreements Filing (Eco Energy/Red Willow/Shell) to be effective 1/1/2022. Filed Date: 12/1/21. Accession Number: 20211201–5242. Comment Date: 5 p.m. ET 12/13/21. Docket Numbers: RP22–387–000. Applicants: Natural Gas Pipeline Company of America LLC. Description: § 4(d) Rate Filing: Amendment to a Negotiated Rate Agreement—Kiowa Power Partners, LLC to be effective 12/1/2021. Filed Date: 12/1/21. Accession Number: 20211201–5266. Comment Date: 5 p.m. ET 12/13/21. Any person desiring to intervene or protest in any of the above proceedings E:\FR\FM\08DEN1.SGM 08DEN1

Agencies

[Federal Register Volume 86, Number 233 (Wednesday, December 8, 2021)]
[Notices]
[Pages 69636-69637]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-26581]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 11286-026]


City of Abbeville; Notice of Application Accepted for Filing and 
Soliciting Comments, Motions To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Application for Temporary Variance and 
Approval of Reservoir Drawdown Plan.
    b. Project No.: 11286-026.
    c. Date Filed: November 16, 2021, as supplemented on November 24 
and December 2, 2021.
    d. Applicant: City of Abbeville.
    e. Name of Project: Abbeville Hydroelectric Project.
    f. Location: The project is located on the Rocky River in Abbeville 
and Anderson counties, South Carolina.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791a-825r.
    h. Applicant Contact: Mr. Tim Hall, Public Utilities Director, City 
of Abbeville, 306 Cambridge Street, P.O. Box 639, Abbeville, SC 29620; 
(864) 366-5058.
    i. FERC Contact: Christopher Chaney, (202) 502-6778, 
[email protected].
    j. Deadline for filing comments, motions to intervene, and protests 
is 30 days from the issuance date of this notice by the Commission.
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, and protests using the Commission's 
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. 
Commenters can submit brief comments up to 6,000 characters, without 
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact 
information at the end of your comments. For assistance, please contact 
FERC Online Support at [email protected], (866) 208-3676 (toll 
free), or (202) 502-8659 (TTY). In lieu of electronic filing, you may 
submit a paper copy. Submissions sent via the U.S. Postal Service must 
be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory 
Commission, 888 First Street NE, Room 1A, Washington, DC 20426. 
Submissions sent via any other carrier must be addressed to: Kimberly 
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins 
Avenue, Rockville, MD 20852. The first page of any filing should 
include the docket number P-11286-026. Comments emailed to Commission 
staff are not considered part of the Commission record.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person whose name appears on the official service 
list for the project. Further, if an intervenor files comments or 
documents with the Commission relating to the merits of an issue that 
may affect the responsibilities of a particular resource agency, it 
must also serve a copy of the document on that resource agency.
    k. Description of Request: The City of Abbeville (licensee) 
requests approval to implement a temporary drawdown of the reservoir to 
an elevation of 528 feet mean sea level (msl). Under the licensee's 
proposal, the reservoir would be drawn down 12 feet below the seasonal 
minimum elevation of 540 feet msl allowed under Article 401 of the 
project's license. The licensee states the drawdown is necessary to 
conduct repairs on the penstock fill valve. As proposed in the December 
2, 2021 supplement, the drawdown would begin on January 10, 2022, and 
the licensee would start refilling the reservoir on January 28, 2022. 
The licensee estimates the reservoir refill would take approximately 30 
days. As required under Article 403 of the project's license, the 
licensee's request includes an associated Reservoir Drawdown Plan for 
Commission approval.
    l. Locations of the Application: This filing may also be viewed on 
the Commission's website at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. You may also register 
online at https://www.ferc.gov/docs-filing/esubscription.asp to be 
notified via email of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208-3676 or email 
[email protected], for TTY, call (202) 502-8659. Agencies may 
obtain copies of the application directly from the applicant.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214, respectively. In determining the appropriate action to take, the 
Commission will consider all protests or other comments filed, but only 
those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any comments, 
protests, or motions to intervene must be received on or before the 
specified comment date for the particular application.
    o. Filing and Service of Documents: Any filing must (1) bear in all 
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO 
INTERVENE'' as applicable; (2) set forth in the heading the name of the 
applicant and the project number of the application to which the filing 
responds; (3) furnish the name, address, and telephone number of the 
person commenting, protesting, or intervening; and (4) otherwise comply 
with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis. Any filing made by an intervenor must be accompanied 
by proof of service on all persons listed in the service list prepared 
by the Commission in this proceeding, in accordance with 18 CFR 
385.2010.


[[Page 69637]]


    Dated: December 2, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-26581 Filed 12-7-21; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.