Southern California Edison Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests, 60228-60229 [2021-23660]
Download as PDF
60228
Federal Register / Vol. 86, No. 208 / Monday, November 1, 2021 / Notices
lotter on DSK11XQN23PROD with NOTICES1
and the Regulations under the Natural
Gas Act (18 CFR 157.10).1
As a matter of practice, the
Commission itself generally acts on
requests for extensions of time to
complete construction for Natural Gas
Act facilities when such requests are
contested before order issuance. For
those extension requests that are
contested,2 the Commission will aim to
issue an order acting on the request
within 45 days.3 The Commission will
address all arguments relating to
whether the applicant has demonstrated
there is good cause to grant the
extension.4 The OEP Director, or his or
her designee, will act on all of those
extension requests that are uncontested.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFile’’ link at https://www.ferc.gov.
Persons unable to file electronically may
mail similar pleadings to the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
Comment Date: 5:00 p.m. Eastern
Time on November 10, 2021.
1 Only motions to intervene from entities that
were party to the underlying proceeding will be
accepted. Algonquin Gas Transmission, LLC, 170
FERC ¶ 61,144, at P 39 (2020).
2 Contested proceedings are those where an
intervenor disputes any material issue of the filing.
18 CFR 385.2201(c)(1) (2019).
3 Algonquin Gas Transmission, LLC, 170 FERC
¶ 61,144, at P 40 (2020).
4 Id. at P 40.
VerDate Sep<11>2014
18:03 Oct 29, 2021
Jkt 256001
Dated: October 26, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–23733 Filed 10–29–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 67–137]
Southern California Edison Company;
Notice of Application Accepted for
Filing and Soliciting Comments,
Motions To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Application for
Temporary Variance of Minimum Flow
and Minimum Pool Requirements.
b. Project No: 67–137.
c. Date Filed: October 7 and 20, 2021.
d. Applicant: Southern California
Edison Company (licensee).
e. Name of Project: Big Creek 2A, 8,
and Eastwood Hydroelectric Project.
f. Location: The project is located on
Big Creek and the South Fork San
Joaquin River in Fresno County,
California.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Ms. Stephanie
Fincher, Southern California Edison
Company, 626–302–0945,
stephanie.fincher@sce.com
i. FERC Contact: John Aedo, (415)
369–3335, john.aedo@ferc.gov
j. Deadline for filing comments,
motions to intervene, and protests:
November 19, 2021.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include the
docket number P–67–137. Comments
emailed to Commission staff are not
considered part of the Commission
record.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: The
licensee requests a temporary variance
of its minimum pool requirements in
Florence Lake and its minimum flow
requirements in the South San Joaquin
River below Florence Lake. Specifically,
the licensee requests Commission
approval to reduce Florence Lake
reservoir levels to as much as 10 percent
below the minimum pool elevation
requirement of 7232.6 feet msl. In
addition, the licensee requests
Commission approval to reduce flows
below Florence Lake below the 11 cubic
feet per second (cfs) minimum flow
requirement and/or the alternate inflow
matching requirement during inflows
less than 11 cfs. The licensee instead
proposes to approximate flow releases
with lake inflows, with occasional
departures from the minimum flow
requirement, but to maintain flows
above 3 cfs. The licensee requests the
variance as a result of low lake storage
resulting from ongoing drought
conditions at the project. Finally, the
licensee requests the variance from
November 8, 2021 through March 31,
2022.
l. Locations of the Application: This
filing may be viewed on the
Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. Agencies may
obtain copies of the application directly
from the applicant.
E:\FR\FM\01NON1.SGM
01NON1
Federal Register / Vol. 86, No. 208 / Monday, November 1, 2021 / Notices
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: October 20, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–23660 Filed 10–29–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2322–069]
lotter on DSK11XQN23PROD with NOTICES1
Brookfield White Pine Hydro LLC;
Notice of Waiver Period for Water
Quality Certification Application
On October 15, 2021, Brookfield
White Pine Hydro LLC (Brookfield)
submitted to the Federal Energy
Regulatory Commission a copy of its
application for a Clean Water Act
section 401(a)(1) water quality
certification filed with the Maine
Department of Environmental Protection
VerDate Sep<11>2014
18:03 Oct 29, 2021
Jkt 256001
(Maine DEP), in conjunction with the
above captioned project. On October 20,
2021, Brookfield filed documentation of
the date that Maine DEP received the
application. Pursuant to 40 CFR 121.6,
we hereby notify the Maine DEP of the
following:
Date of Receipt of the Certification
Request: October 18, 2021.
Reasonable Period of Time to Act on
the Certification Request: One year.
Date Waiver Occurs for Failure to Act:
October 18, 2022.
If the Maine DEP fails or refuses to act
on the water quality certification request
by the above waiver date, then the
agency’s certifying authority is deemed
waived pursuant to section 401(a)(1) of
the Clean Water Act, 33 U.S.C.
1341(a)(1).
Dated: October 26, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–23734 Filed 10–29–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2368–059]
Algonquin Northern Maine Generating
Company; Notice of Availability of
Environmental Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR part 380, the Office
of Energy Projects has reviewed the
application for a subsequent license for
the Scopan Hydroelectric Project No.
2368, located on Scopan Stream in
Aroostook County, Maine, and has
prepared an Environmental Assessment
(EA) for the project. No federal land
would be occupied by project works or
located within the project boundary.
The EA contains staff’s analysis of the
potential environmental impacts of the
project and concludes that licensing the
project, with appropriate environmental
protective measures, would not
constitute a major federal action that
would significantly affect the quality of
the human environment.
The Commission provides all
interested persons with an opportunity
to view and/or print the EA via the
internet through the Commission’s
Home Page (https://www.ferc.gov) using
the ‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits
in the docket number field, to access the
document. For assistance, contact FERC
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
60229
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY, (202)
502–8659.
You may also register online at
https://ferconline.ferc.gov/
eSubscription.aspx to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Any comments should be filed within
30 days from the date of this notice.
The Commission strongly encourages
electronic filing. Please file comments
using the Commission’s eFiling system
at https://ferconline.ferc.gov/
eFiling.aspx. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
ferconline.ferc.gov/
QuickComment.aspx. You must include
your name and contact information at
the end of your comments. For
assistance, please contact FERC Online
Support. In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include docket
number P–2368–059.
For further information, contact John
Baummer at (202) 502–6837, or at
John.Baummer@ferc.gov.
Dated: October 26, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021–23735 Filed 10–29–21; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. RM98–1–000]
Records Governing Off-the-Record
Communications; Public Notice
This constitutes notice, in accordance
with 18 CFR 385.2201(b), of the receipt
of prohibited and exempt off-the-record
communications.
Order No. 607 (64 FR 51222,
September 22, 1999) requires
Commission decisional employees, who
make or receive a prohibited or exempt
off-the-record communication relevant
E:\FR\FM\01NON1.SGM
01NON1
Agencies
[Federal Register Volume 86, Number 208 (Monday, November 1, 2021)]
[Notices]
[Pages 60228-60229]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2021-23660]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 67-137]
Southern California Edison Company; Notice of Application
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Application for Temporary Variance of Minimum
Flow and Minimum Pool Requirements.
b. Project No: 67-137.
c. Date Filed: October 7 and 20, 2021.
d. Applicant: Southern California Edison Company (licensee).
e. Name of Project: Big Creek 2A, 8, and Eastwood Hydroelectric
Project.
f. Location: The project is located on Big Creek and the South Fork
San Joaquin River in Fresno County, California.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Ms. Stephanie Fincher, Southern California
Edison Company, 626-302-0945, [email protected]
i. FERC Contact: John Aedo, (415) 369-3335, [email protected]
j. Deadline for filing comments, motions to intervene, and
protests: November 19, 2021.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, and protests using the Commission's
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments up to 6,000 characters, without
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact
information at the end of your comments. For assistance, please contact
FERC Online Support at [email protected], (866) 208-3676 (toll
free), or (202) 502-8659 (TTY). In lieu of electronic filing, you may
submit a paper copy. Submissions sent via the U.S. Postal Service must
be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier must be addressed to: Kimberly
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852. The first page of any filing should
include the docket number P-67-137. Comments emailed to Commission
staff are not considered part of the Commission record.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency.
k. Description of Request: The licensee requests a temporary
variance of its minimum pool requirements in Florence Lake and its
minimum flow requirements in the South San Joaquin River below Florence
Lake. Specifically, the licensee requests Commission approval to reduce
Florence Lake reservoir levels to as much as 10 percent below the
minimum pool elevation requirement of 7232.6 feet msl. In addition, the
licensee requests Commission approval to reduce flows below Florence
Lake below the 11 cubic feet per second (cfs) minimum flow requirement
and/or the alternate inflow matching requirement during inflows less
than 11 cfs. The licensee instead proposes to approximate flow releases
with lake inflows, with occasional departures from the minimum flow
requirement, but to maintain flows above 3 cfs. The licensee requests
the variance as a result of low lake storage resulting from ongoing
drought conditions at the project. Finally, the licensee requests the
variance from November 8, 2021 through March 31, 2022.
l. Locations of the Application: This filing may be viewed on the
Commission's website at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. You may also register
online at https://www.ferc.gov/docs-filing/esubscription.asp to be
notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or email
[email protected], for TTY, call (202) 502-8659. Agencies may
obtain copies of the application directly from the applicant.
[[Page 60229]]
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214, respectively. In determining the appropriate action to take, the
Commission will consider all protests or other comments filed, but only
those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular application.
o. Filing and Service of Documents: Any filing must (1) bear in all
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO
INTERVENE'' as applicable; (2) set forth in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person commenting, protesting or intervening; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis. Any filing made by an intervenor must be accompanied
by proof of service on all persons listed in the service list prepared
by the Commission in this proceeding, in accordance with 18 CFR
385.2010.
Dated: October 20, 2021.
Kimberly D. Bose,
Secretary.
[FR Doc. 2021-23660 Filed 10-29-21; 8:45 am]
BILLING CODE 6717-01-P