Notice of Availability of Guidance and Application for Hydroelectric Production Incentives; Correction, 21187 [2023-07455]

Download as PDF Federal Register / Vol. 88, No. 68 / Monday, April 10, 2023 / Notices DEPARTMENT OF ENERGY Environmental Management Advisory Board Office of Environmental Management, Department of Energy. ACTION: Notice for solicitation of members. AGENCY: In accordance with the Federal Advisory Committee Act, the U.S. Department of Energy is soliciting nomination for candidates to fill vacancies on the Environmental Management Advisory Board. DATES: Deadline for member nominations is May 15, 2023. ADDRESSES: The nominee’s name, resume, biography, and any letters of support must be submitted via email to: kelly.snyder@em.doe.gov. Board website: www.energy.gov/em/emab. SUPPLEMENTARY INFORMATION: The mission of the Environmental Management Advisory Board (EMAB) is to provide independent and external advice, information, and recommendations to the Assistant Secretary for Environmental Management (EM) on corporate issues relating to accelerated site cleanup and risk reduction. The Board works to identify applicable private and public sector best management practices and provides counsel on how to integrate them into the EM program. The Board works with the private sector to identify barriers to the effective execution of the Assistant Secretary’s program objectives and facilitates discussions between the department, private industry and the public for knowledge sharing. EMAB provides strategic management advice on where and how to focus the program’s resources to achieve maximum impact and greatest risk reduction. EMAB’s activities are governed by the Federal Advisory Committee Act (FACA), which was enacted to ensure that the general public has access to advisory board deliberations and recommendations. The membership of EMAB includes individuals from governmental and nongovernmental entities, private industry, and scientific and academic communities. Members are sought in all professional fields related to Environmental Management programs and specifically groundwater remediation, soil remediation, and adaptive management. Members are appointed for two-year terms. The Board typically meets twice a year in-person and as needed, virtually. Members serve on an ddrumheller on DSK120RN23PROD with NOTICES1 SUMMARY: VerDate Sep<11>2014 18:13 Apr 07, 2023 Jkt 259001 21187 uncompensated, volunteer basis. However, committee members are paid authorized travel and per diem for each meeting that requires travel. Each nominee must submit their resume and biography along with any letters of support by the deadline above. All nominees will be vetted before selection. Nominations are open to all individuals without regard to race, color, religion, sex, national origin, age, mental or physical handicap, marital status, or sexual orientation. Appointments to the Environmental Management Advisory Board will be made by the Secretary of Energy. For further information on EMAB, please visit www.energy.gov/em/emab. For further information about DOE’s Environmental Management program, please visit www.energy.gov/em. availability of guidance and open application period for the Section 242 Hydroelectric Production Incentives in the Federal Register. 88 FR 17202. It has come to GDO’s attention that there is a typo included under the SUPPLEMENTARY INFORMATION section in the first sentence on page 17203, second column, first paragraph, relating to the date referenced as part of the discussion of an existing dam or conduit included in the second column. The sentence is corrected to read as follows: Signed in Washington, DC, on April 5, 2023. LaTanya Butler, Deputy Committee Management Officer. This typo does not alter the information provided in the guidance document nor does it alter the solicitation period as announced in the original notice. Please consult the guidance for all application requirements and properly submit all application materials to the Clean Energy Infrastructure Funding Opportunity Exchange, https://infra structure-exchange.energy.gov, by no later than 5 p.m. ET, May 8, 2023. Reason for Correction: The change corrects the date referenced in the discussion of the definition of an existing dam or conduit.1 [FR Doc. 2023–07466 Filed 4–7–23; 8:45 am] BILLING CODE 6450–01–P DEPARTMENT OF ENERGY Notice of Availability of Guidance and Application for Hydroelectric Production Incentives; Correction Hydroelectric Incentives Program, Grid Deployment Office, Department of Energy. ACTION: Notice of availability of guidance and open application period; correction. AGENCY: On March 22, 2023, the Department of Energy’s Grid Deployment Office published a notice announcing the availability of guidance and open application period for the Hydroelectric Production Incentives in the Federal Register. This document makes a correction to that notice. FOR FURTHER INFORMATION CONTACT: Questions may be addressed to Madden Sciubba, U.S. Department of Energy, 1000 Independence Ave. SW, Washington, DC 20585, (240) 798–1195 or by email at hydroelectricincentives@ hq.doe.gov. Additional information can be found in the guidance posted at www.energy.gov/gdo/section-242hydroelectric-production-incentiveprogram. Electronic communications are recommended for correspondence. SUPPLEMENTARY INFORMATION: SUMMARY: Correction On March 22, 2023, the Department of Energy’s Grid Deployment Office (GDO) published a notice announcing the PO 00000 Frm 00016 Fmt 4703 Sfmt 9990 ‘‘Additionally, Congress defined an existing dam or conduit to mean any dam or conduit constructed and completed before November 15, 2021 and does not require any construction or enlargement of impoundment or diversion structures, other than repair or reconstruction, in connection with the installation of a turbine or other generating device.’’ (Emphasis added). Signing Authority This document of the Department of Energy was signed on April 4, 2023, by Maria Duaime Robinson, Director, Grid Deployment Office, pursuant to delegated authority from the Secretary of Energy. That document with the original signature and date is maintained by DOE. For administrative purposes only, and in compliance with requirements of the Office of the Federal Register, the undersigned DOE Federal Register Liaison Officer has been authorized to sign and submit the document in electronic format for publication, as an official document of the Department of Energy. This administrative process in no way alters the legal effect of this document upon publication in the Federal Register. Signed in Washington, DC, on April 5, 2023. Treena V. Garrett, Federal Register Liaison Officer, U.S. Department of Energy. [FR Doc. 2023–07455 Filed 4–7–23; 8:45 am] BILLING CODE 6450–01–P 1 See E:\FR\FM\10APN1.SGM 42 U.S.C. 15881(b)(2). 10APN1

Agencies

[Federal Register Volume 88, Number 68 (Monday, April 10, 2023)]
[Notices]
[Page 21187]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-07455]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY


Notice of Availability of Guidance and Application for 
Hydroelectric Production Incentives; Correction

AGENCY: Hydroelectric Incentives Program, Grid Deployment Office, 
Department of Energy.

ACTION: Notice of availability of guidance and open application period; 
correction.

-----------------------------------------------------------------------

SUMMARY: On March 22, 2023, the Department of Energy's Grid Deployment 
Office published a notice announcing the availability of guidance and 
open application period for the Hydroelectric Production Incentives in 
the Federal Register. This document makes a correction to that notice.

FOR FURTHER INFORMATION CONTACT: Questions may be addressed to Madden 
Sciubba, U.S. Department of Energy, 1000 Independence Ave. SW, 
Washington, DC 20585, (240) 798-1195 or by email at 
[email protected]. Additional information can be found 
in the guidance posted at www.energy.gov/gdo/section-242-hydroelectric-production-incentive-program. Electronic communications are recommended 
for correspondence.

SUPPLEMENTARY INFORMATION: 

Correction

    On March 22, 2023, the Department of Energy's Grid Deployment 
Office (GDO) published a notice announcing the availability of guidance 
and open application period for the Section 242 Hydroelectric 
Production Incentives in the Federal Register. 88 FR 17202. It has come 
to GDO's attention that there is a typo included under the 
SUPPLEMENTARY INFORMATION section in the first sentence on page 17203, 
second column, first paragraph, relating to the date referenced as part 
of the discussion of an existing dam or conduit included in the second 
column.
    The sentence is corrected to read as follows:

    ``Additionally, Congress defined an existing dam or conduit to 
mean any dam or conduit constructed and completed before November 
15, 2021 and does not require any construction or enlargement of 
impoundment or diversion structures, other than repair or 
reconstruction, in connection with the installation of a turbine or 
other generating device.'' (Emphasis added).

    This typo does not alter the information provided in the guidance 
document nor does it alter the solicitation period as announced in the 
original notice. Please consult the guidance for all application 
requirements and properly submit all application materials to the Clean 
Energy Infrastructure Funding Opportunity Exchange, https://infrastructure-exchange.energy.gov, by no later than 5 p.m. ET, May 8, 
2023.
    Reason for Correction: The change corrects the date referenced in 
the discussion of the definition of an existing dam or conduit.\1\
---------------------------------------------------------------------------

    \1\ See 42 U.S.C. 15881(b)(2).
---------------------------------------------------------------------------

Signing Authority

    This document of the Department of Energy was signed on April 4, 
2023, by Maria Duaime Robinson, Director, Grid Deployment Office, 
pursuant to delegated authority from the Secretary of Energy. That 
document with the original signature and date is maintained by DOE. For 
administrative purposes only, and in compliance with requirements of 
the Office of the Federal Register, the undersigned DOE Federal 
Register Liaison Officer has been authorized to sign and submit the 
document in electronic format for publication, as an official document 
of the Department of Energy. This administrative process in no way 
alters the legal effect of this document upon publication in the 
Federal Register.

    Signed in Washington, DC, on April 5, 2023.
Treena V. Garrett,
Federal Register Liaison Officer, U.S. Department of Energy.
[FR Doc. 2023-07455 Filed 4-7-23; 8:45 am]
BILLING CODE 6450-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.