Renewable World Energies, LLC, Grenfell, LLC; Notice of Transfer of Exemption, 21189 [2023-07450]

Download as PDF Federal Register / Vol. 88, No. 68 / Monday, April 10, 2023 / Notices Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. [FR Doc. 2023–07448 Filed 4–7–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 9379–013] Renewable World Energies, LLC, Grenfell, LLC; Notice of Transfer of Exemption ddrumheller on DSK120RN23PROD with NOTICES1 1. On March 6, 2023, Renewable World Energies, LLC exemptee for the 280-kilowatt Belding Dam Hydroelectric Project No. 9379, filed a letter notifying the Commission that the project was transferred from Renewable World Energies, LLC to Grenfell, LLC. The exemption from licensing was originally issued on March 17, 1986.1 The project is located on the Flat River, Ionia County, Michigan. The transfer of an exemption does not require Commission approval. 2. Grenfell, LLC is now the exemptee of the Belding Dam Hydroelectric Project No. 9379. All correspondence must be forwarded to Mr. Jason Kreuscher, Renewable World Energies Corporate Office, 100 S State Street, Neshkoro, WI 54960, Phone: 855–994– 9376 ext. 102, Email: jason@ rwehydro.com. Dated: April 4, 2023. Debbie-Anne A. Reese, Deputy Secretary. [FR Doc. 2023–07450 Filed 4–7–23; 8:45 am] BILLING CODE 6717–01–P 1 Grenfell Hydroelectric Associates, 34 FERC ¶ 62,524 (1986). Subsequently, on February 19, 2013, the project was transferred to Renewable World Energies, LLC. 18:13 Apr 07, 2023 [EPA–HQ–ORD–2019–0287; FRL–10829–01– ORD] Availability of the Draft IRIS Toxicological Review of Perfluorodecanoic Acid [PFDA, CASRN 335–76–2] and Related Salts Environmental Protection Agency (EPA). ACTION: Notice of public comment period. AGENCY: The Environmental Protection Agency (EPA) is announcing a 60-day public comment period associated with release of the draft IRIS Toxicological Review of Perfluorodecanoic Acid (PFDA, CASRN 335–76–2) and Related Salts. The draft document was prepared by the Center for Public Health and Environmental Assessment (CPHEA) within EPA’s Office of Research and Development (ORD). EPA is releasing this draft IRIS assessment for public comment in advance of a contract-led peer review. Public comments received will be provided to the external peer reviewers. ERG, a contractor to EPA, will convene a public meeting to discuss the draft report with the public during Step 4 of the IRIS Process. The external peer reviewers will consider public comments submitted in response to this notice and comments provided at a future public peer review meeting. EPA will consider all comments received when revising the document post-peer review. This draft assessment is not final as described in EPA’s information quality guidelines, and it does not represent, and should not be construed to represent Agency policy or views. DATES: The 60-day public comment period begins April 10, 2023 and ends June 9, 2023. Comments must be received on or before June 9, 2023. ADDRESSES: The IRIS Toxicological Review of Perfluorodecanoic Acid [PFDA, CASRN 335–76–2] and Related Salts will be available via the internet on the IRIS website at https:// www.epa.gov/iris/iris-recent-additions and in the public docket at https:// www.regulations.gov, Docket ID No. EPA–HQ–ORD–2019–0287. FOR FURTHER INFORMATION CONTACT: For information on the public comment period, contact the ORD Docket at the EPA Headquarters Docket Center; telephone: 202–566–1752; facsimile: 202–566–9744; or email: Docket_ORD@ epa.gov. For technical information on the IRIS Toxicological Review of SUMMARY: Dated: April 4, 2023. Debbie-Anne A. Reese, Deputy Secretary. VerDate Sep<11>2014 ENVIRONMENTAL PROTECTION AGENCY Jkt 259001 PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 21189 Perfluorodecanoic Acid (PFDA, CASRN 335–76–2) and Related Salts, contact Dr. Andrew Kraft, CPHEA; telephone: 202– 564–0286; or email: kraft.andrew@ epa.gov. The IRIS Program will provide updates through the IRIS website (https://www.epa.gov/iris) and via EPA’s IRIS listserv. To register for the IRIS listserv, visit the IRIS website (https:// www.epa.gov/iris) or visit https:// www.epa.gov/iris/forms/stayingconnected-integrated-risk-informationsystem#connect. For questions about the peer review, please contact: Laurie Waite, ERG, by email at peerreview@erg.com (subject line: EPA PFAS assessments peer review); or by phone: (781) 674–7362. SUPPLEMENTARY INFORMATION: How To Submit Technical Comments to the Docket at https:// www.regulations.gov Submit your comments, identified by Docket ID No. EPA–HQ–ORD–2019– 0287 for the Perfluorodecanoic Acid IRIS Assessment, by one of the following methods: • www.regulations.gov: Follow the on-line instructions for submitting comments. • Email: Docket_ORD@epa.gov. • Fax: 202–566–9744. • Mail: U.S. Environmental Protection Agency, EPA Docket Center (ORD Docket), Mail Code: 28221T, 1200 Pennsylvania Avenue NW, Washington, DC 20460. The phone number is 202– 566–1752. For information on visiting the EPA Docket Center Public Reading Room, visit https://www.epa.gov/dockets. Due to public health concerns related to COVID–19, the EPA Docket Center and Reading Room may be closed to the public with limited exceptions. The telephone number for the Public Reading Room is 202–566–1744. The public can submit comments via www.regulations.gov or email. Instructions: Direct your comments to docket number EPA–HQ–ORD–2019– 0287 for Perfluorodecanoic Acid IRIS Assessment. Please ensure that your comments are submitted within the specified comment period. Comments received after the closing date will be marked ‘‘late,’’ and may only be considered if time permits. It is EPA’s policy to include all comments it receives in the public docket without change and to make the comments available online at www.regulations.gov, including any personal information provided, unless a comment includes information claimed to be Confidential Business Information (CBI) or other information for which disclosure is restricted by statute. Do E:\FR\FM\10APN1.SGM 10APN1

Agencies

[Federal Register Volume 88, Number 68 (Monday, April 10, 2023)]
[Notices]
[Page 21189]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-07450]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 9379-013]


Renewable World Energies, LLC, Grenfell, LLC; Notice of Transfer 
of Exemption

    1. On March 6, 2023, Renewable World Energies, LLC exemptee for the 
280-kilowatt Belding Dam Hydroelectric Project No. 9379, filed a letter 
notifying the Commission that the project was transferred from 
Renewable World Energies, LLC to Grenfell, LLC. The exemption from 
licensing was originally issued on March 17, 1986.\1\ The project is 
located on the Flat River, Ionia County, Michigan. The transfer of an 
exemption does not require Commission approval.
---------------------------------------------------------------------------

    \1\ Grenfell Hydroelectric Associates, 34 FERC ] 62,524 (1986). 
Subsequently, on February 19, 2013, the project was transferred to 
Renewable World Energies, LLC.
---------------------------------------------------------------------------

    2. Grenfell, LLC is now the exemptee of the Belding Dam 
Hydroelectric Project No. 9379. All correspondence must be forwarded to 
Mr. Jason Kreuscher, Renewable World Energies Corporate Office, 100 S 
State Street, Neshkoro, WI 54960, Phone: 855-994-9376 ext. 102, Email: 
[email protected].

     Dated: April 4, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-07450 Filed 4-7-23; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.