Idaho Power Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests, 23026-23027 [2023-07935]
Download as PDF
23026
Federal Register / Vol. 88, No. 72 / Friday, April 14, 2023 / Notices
Dated: April 10, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–07937 Filed 4–13–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER23–1565–000]
ddrumheller on DSK120RN23PROD with NOTICES1
Umbriel Solar, LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding of Umbriel
Solar, LLC’s application for marketbased rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is May 1, 2023.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
may mail similar pleadings to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426. Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
VerDate Sep<11>2014
17:45 Apr 13, 2023
Jkt 259001
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Dated: April 10, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–07938 Filed 4–13–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER23–1585–000]
Riverstart Solar Park III LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of
Riverstart Solar Park III LLC’s
application for market-based rate
authority, with an accompanying rate
tariff, noting that such application
includes a request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is May 1, 2023.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
may mail similar pleadings to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426. Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Dated: April 10, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–07947 Filed 4–13–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 1971–135]
Idaho Power Company; Notice of
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Non-Capacity
Amendment of License.
b. Project No.: 1971–135.
E:\FR\FM\14APN1.SGM
14APN1
ddrumheller on DSK120RN23PROD with NOTICES1
Federal Register / Vol. 88, No. 72 / Friday, April 14, 2023 / Notices
c. Date Filed: October 6 and 7, 2022,
and supplemented October 21, 2022 and
March 17, 2023.
d. Applicant: Idaho Power Company
(licensee).
e. Name of Project: Hells Canyon
Project.
f. Location: The project is located on
the Snake River in Adams and
Washington counties, Idaho, and in
Baker, Wallowa, and Malheur counties,
Oregon. Federal lands administered by
the U.S. Forest Service and the Bureau
of Land Management (Payette and
Wallowa-Whitman National Forests and
Hells Canyon National Recreational
Area) are included within the project
boundary.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791a–825r.
h. Applicant Contact: Mr. Nathan
Gardiner, Senior Counsel, Idaho Power
Company, 1221 West Idaho Street,
Boise, ID 83702; (208) 388–2975;
ngardiner@idahopower.com.
Mr. Scott Pugrud, Corporate Counsel,
Idaho Power Company, 1221 West Idaho
Street, Boise, ID 83702; (208) 388–2975;
spugrud2@idahopower.com.
i. FERC Contact: Jeremy Jessup, (202)
502–6779, Jeremy.Jessup@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests: May
10, 2023.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, and protests using
the Commission’s eFiling system at
https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may submit a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, Maryland 20852. The first
page of any filing should include the
docket number 1971–135. Comments
emailed to Commission staff are not
considered part of the Commission
record.
The Commission’s Rules of Practice
and Procedure require all intervenors
VerDate Sep<11>2014
17:45 Apr 13, 2023
Jkt 259001
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, it must also
serve a copy of the document on that
resource agency.
k. Description of Request: The
licensee proposes to refurbish the four
turbine generating units at the Oxbow
Development of the project sequentially
over the course of approximately four
years. The licensee also proposes to
increase the size of the erection deck at
the development by extending it to the
east and provide an area for additional
parking and a job trailer to facilitate the
turbine generating maintenance. All
proposed activity for the turbine and
generator maintenance would occur in
the powerhouse. The only ground
disturbing area would be to the east of
the existing erection deck and would be
approximately 0.75 acres. None of the
work being done will involve in water
work, and the licensee would use best
management practices for construction.
A single turbine generating unit would
be offline periodically during the
refurbishment period. Therefore, the
proposal may result in an increased
flow over the spillway while the work
is being done, depending on whether
the inflow to the project exceeds the
hydraulic capacity of the three online
units. Under the proposal, the total
authorized capacity of the project would
increase from 1,222,300 to 1,252,065
kilowatts and the hydraulic capacity of
each unit at the Oxbow Development
would increase from 5,400 to 6,000
cubic feet per second.
l. Locations of the Application: This
filing may be viewed on the
Commission’s website at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. Agencies may
obtain copies of the application directly
from the applicant.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
PO 00000
Frm 00032
Fmt 4703
Sfmt 4703
23027
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: April 10, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–07935 Filed 4–13–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER23–1541–000]
Desert Peak Energy Center, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding of Desert
Peak Energy Center, LLC’s application
for market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
E:\FR\FM\14APN1.SGM
14APN1
Agencies
[Federal Register Volume 88, Number 72 (Friday, April 14, 2023)]
[Notices]
[Pages 23026-23027]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-07935]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 1971-135]
Idaho Power Company; Notice of Application Accepted for Filing
and Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Non-Capacity Amendment of License.
b. Project No.: 1971-135.
[[Page 23027]]
c. Date Filed: October 6 and 7, 2022, and supplemented October 21,
2022 and March 17, 2023.
d. Applicant: Idaho Power Company (licensee).
e. Name of Project: Hells Canyon Project.
f. Location: The project is located on the Snake River in Adams and
Washington counties, Idaho, and in Baker, Wallowa, and Malheur
counties, Oregon. Federal lands administered by the U.S. Forest Service
and the Bureau of Land Management (Payette and Wallowa-Whitman National
Forests and Hells Canyon National Recreational Area) are included
within the project boundary.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791a-825r.
h. Applicant Contact: Mr. Nathan Gardiner, Senior Counsel, Idaho
Power Company, 1221 West Idaho Street, Boise, ID 83702; (208) 388-2975;
[email protected].
Mr. Scott Pugrud, Corporate Counsel, Idaho Power Company, 1221 West
Idaho Street, Boise, ID 83702; (208) 388-2975; [email protected].
i. FERC Contact: Jeremy Jessup, (202) 502-6779,
[email protected].
j. Deadline for filing comments, motions to intervene, and
protests: May 10, 2023.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, and protests using the Commission's
eFiling system at https://www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments up to 6,000 characters, without
prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact
information at the end of your comments. For assistance, please contact
FERC Online Support at [email protected], (866) 208-3676 (toll
free), or (202) 502-8659 (TTY). In lieu of electronic filing, you may
submit a paper copy. Submissions sent via the U.S. Postal Service must
be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier must be addressed to: Kimberly
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, Maryland 20852. The first page of any filing should
include the docket number 1971-135. Comments emailed to Commission
staff are not considered part of the Commission record.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, it
must also serve a copy of the document on that resource agency.
k. Description of Request: The licensee proposes to refurbish the
four turbine generating units at the Oxbow Development of the project
sequentially over the course of approximately four years. The licensee
also proposes to increase the size of the erection deck at the
development by extending it to the east and provide an area for
additional parking and a job trailer to facilitate the turbine
generating maintenance. All proposed activity for the turbine and
generator maintenance would occur in the powerhouse. The only ground
disturbing area would be to the east of the existing erection deck and
would be approximately 0.75 acres. None of the work being done will
involve in water work, and the licensee would use best management
practices for construction. A single turbine generating unit would be
offline periodically during the refurbishment period. Therefore, the
proposal may result in an increased flow over the spillway while the
work is being done, depending on whether the inflow to the project
exceeds the hydraulic capacity of the three online units. Under the
proposal, the total authorized capacity of the project would increase
from 1,222,300 to 1,252,065 kilowatts and the hydraulic capacity of
each unit at the Oxbow Development would increase from 5,400 to 6,000
cubic feet per second.
l. Locations of the Application: This filing may be viewed on the
Commission's website at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. You may also register
online at https://www.ferc.gov/docs-filing/esubscription.asp to be
notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or email
[email protected], for TTY, call (202) 502-8659. Agencies may
obtain copies of the application directly from the applicant.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214, respectively. In determining the appropriate action to take, the
Commission will consider all protests or other comments filed, but only
those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular application.
o. Filing and Service of Documents: Any filing must (1) bear in all
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO
INTERVENE'' as applicable; (2) set forth in the heading the name of the
applicant and the project number of the application to which the filing
responds; (3) furnish the name, address, and telephone number of the
person commenting, protesting or intervening; and (4) otherwise comply
with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis. Any filing made by an intervenor must be accompanied
by proof of service on all persons listed in the service list prepared
by the Commission in this proceeding, in accordance with 18 CFR
385.2010.
Dated: April 10, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-07935 Filed 4-13-23; 8:45 am]
BILLING CODE 6717-01-P