Brookfield White Pine Hydro, LLC, Errol Hydro Co., LLC; Notice of Availability of Environmental Assessment, 20505 [2023-07198]
Download as PDF
Federal Register / Vol. 88, No. 66 / Thursday, April 6, 2023 / Notices
(202) 502–8659 (TTY). In lieu of
electronic filing, you may submit a
paper copy. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852. The first page of any filing
should include docket number P–
14861–002.
Anyone may intervene in this
proceeding based on this draft EIS (18
CFR 380.10). You must file your request
to intervene as specified above.2 You do
not need intervenor status to have your
comments considered.
In addition to or in lieu of sending
written comments, you are invited to
attend a public meeting that will be held
to receive comments on the draft EIS.
Commission staff will hold two public
meetings for the purpose of receiving
comments on the draft EIS. At the
meetings, resource agency personnel
and other interested persons will have
the opportunity to provide oral and
written comments and
recommendations regarding the draft
EIS. The meetings will be recorded by
a court reporter, and all statements
(verbal and written) will become part of
the Commission’s public record for the
project. All interested individuals and
entities will be invited to attend one or
both of the public meetings. A notice
detailing the exact date, time, and
location of the public meetings will be
forthcoming.
For further information, please
contact Michael Tust at (202) 502–6522
or at michael.tust@ferc.gov.
Dated: March 31, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–07200 Filed 4–5–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
ddrumheller on DSK120RN23PROD with NOTICES1
Federal Energy Regulatory
Commission
Notice of Staff Attendance at North
American Electric Reliability
Corporation Standard Drafting Team
Meeting
The Federal Energy Regulatory
Commission hereby gives notice that
2 Interventions may also be filed electronically via
the internet in lieu of paper. See the previous
discussion on filing comments electronically.
VerDate Sep<11>2014
21:13 Apr 05, 2023
Jkt 259001
members of the Commission and/or
Commission staff may attend the
following meeting:
North American Electric Reliability
Corporation Project 2021–07 Extreme
Cold Weather Grid Operations,
Preparedness, and Coordination
Standard Drafting Team Meeting
April 11, 2023 (1:00 p.m.–3:00 p.m.
eastern time).
Further information regarding these
meetings may be found at: https://
www.nerc.com/Pages/Calendar.aspx.
The discussions at the meetings,
which are open to the public, may
address matters at issue in the following
Commission proceeding:
Docket No. RD23–1–000: Extreme
Cold Weather Reliability Standards
EOP–011–3 and EOP–012–1.
For further information, please
contact Chanel Chasanov, 202–502–
8569, or chanel.chasanov@ferc.gov.
Dated: March 31, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–07205 Filed 4–5–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 3133–033]
Brookfield White Pine Hydro, LLC,
Errol Hydro Co., LLC; Notice of
Availability of Environmental
Assessment
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s (Commission)
regulations, 18 CFR part 380, the Office
of Energy Projects has reviewed the
application for a new license to
continue to operate and maintain the
Errol Hydroelectric Project. The project
is located on the Androscoggin River
and Umbagog Lake, near the Town of
Errol, and Township of Cambridge, in
Coos County, New Hampshire, and the
Towns of Magalloway Plantation and
Upton in Oxford County, Maine.
Commission staff has prepared an
Environmental Assessment (EA) for the
project. The project would occupy 3,285
acres of federal land in the Umbagog
National Wildlife Refuge administered
by the U.S. Fish and Wildlife Service.
The EA contains the staff’s analysis of
the potential environmental impacts of
the project and concludes that licensing
the project, with appropriate
environmental protective measures,
would not constitute a major federal
PO 00000
Frm 00040
Fmt 4703
Sfmt 9990
20505
action that would significantly affect the
quality of the human environment.
The Commission provides all
interested persons with an opportunity
to view and/or print the EA via the
internet through the Commission’s
Home Page (https://www.ferc.gov/), using
the ‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits
in the docket number field, to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov, or tollfree at (866) 208–3676, or for TTY, (202)
502–8659.
You may also register online at
https://ferconline.ferc.gov/FERCOnline.
aspx to be notified via email of new
filings and issuances related to this or
other pending projects. For assistance,
contact FERC Online Support.
Any comments should be filed within
30 days from the date of this notice.
The Commission strongly encourages
electronic filing. Please file comments
using the Commission’s eFiling system
at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support. In
lieu of electronic filing, you may submit
a paper copy. Submissions sent via the
U.S. Postal Service must be addressed
to: Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington,
DC 20426. Submissions sent via any
other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland
20852. The first page of any filing
should include docket number P–3133–
033.
For further information, contact Kelly
Wolcott at (202) 502–8576 or by email
at kelly.wolcott@ferc.gov.
Dated: March 31, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–07198 Filed 4–5–23; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\06APN1.SGM
06APN1
Agencies
[Federal Register Volume 88, Number 66 (Thursday, April 6, 2023)]
[Notices]
[Page 20505]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-07198]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 3133-033]
Brookfield White Pine Hydro, LLC, Errol Hydro Co., LLC; Notice of
Availability of Environmental Assessment
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's (Commission)
regulations, 18 CFR part 380, the Office of Energy Projects has
reviewed the application for a new license to continue to operate and
maintain the Errol Hydroelectric Project. The project is located on the
Androscoggin River and Umbagog Lake, near the Town of Errol, and
Township of Cambridge, in Coos County, New Hampshire, and the Towns of
Magalloway Plantation and Upton in Oxford County, Maine. Commission
staff has prepared an Environmental Assessment (EA) for the project.
The project would occupy 3,285 acres of federal land in the Umbagog
National Wildlife Refuge administered by the U.S. Fish and Wildlife
Service.
The EA contains the staff's analysis of the potential environmental
impacts of the project and concludes that licensing the project, with
appropriate environmental protective measures, would not constitute a
major federal action that would significantly affect the quality of the
human environment.
The Commission provides all interested persons with an opportunity
to view and/or print the EA via the internet through the Commission's
Home Page (https://www.ferc.gov/), using the ``eLibrary'' link. Enter
the docket number, excluding the last three digits in the docket number
field, to access the document. For assistance, contact FERC Online
Support at [email protected], or toll-free at (866) 208-3676,
or for TTY, (202) 502-8659.
You may also register online at https://ferconline.ferc.gov/FERCOnline.aspx to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
Any comments should be filed within 30 days from the date of this
notice.
The Commission strongly encourages electronic filing. Please file
comments using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to
6,000 characters, without prior registration, using the eComment system
at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your
name and contact information at the end of your comments. For
assistance, please contact FERC Online Support. In lieu of electronic
filing, you may submit a paper copy. Submissions sent via the U.S.
Postal Service must be addressed to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street NE, Room 1A,
Washington, DC 20426. Submissions sent via any other carrier must be
addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first
page of any filing should include docket number P-3133-033.
For further information, contact Kelly Wolcott at (202) 502-8576 or
by email at [email protected].
Dated: March 31, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-07198 Filed 4-5-23; 8:45 am]
BILLING CODE 6717-01-P