Appalachian Power Company; Notice of Intent to Prepare an Environmental Assessment, 27498 [2023-09244]
Download as PDF
27498
Federal Register / Vol. 88, No. 84 / Tuesday, May 2, 2023 / Notices
guidance document. DOE will accept
comments via the methods prescribed
above in the ADDRESSES section. The
Department will consider all comments
received during the public comment
period and modify the guidance
document as appropriate. Any necessary
follow-up consultation with EPA or
State agencies in potentially affected
States will be conducted in accordance
with MEBA, 42 U.S.C. 6939f(d)(1).
Confidential Business Information.
Pursuant to 10 CFR 1004.11, any person
submitting information that he or she
believes to be confidential and exempt
by law from public disclosure should
submit via email two well-marked
copies: one copy of the document
marked ‘‘confidential’’ including all the
information believed to be confidential,
and one copy of the document marked
‘‘non-confidential’’ with the information
believed to be confidential deleted. DOE
will make its own determination about
the confidential status of the
information and treat it according to its
determination.
Signing Authority
This document of the Department of
Energy was signed on April 27, 2023, by
Kristen G. Ellis, Acting Associate
Principal Deputy Assistant Secretary for
Regulatory and Policy Affairs, Office of
Environmental Management, pursuant
to delegated authority from the
Secretary of Energy. That document
with the original signature and date is
maintained by DOE. For administrative
purposes only, and in compliance with
requirements of the Office of the Federal
Register, the undersigned DOE Federal
Register Liaison Officer has been
authorized to sign and submit the
document in electronic format for
publication, as an official document of
the Department of Energy. This
administrative process in no way alters
the legal effect of this document upon
publication in the Federal Register.
Signed in Washington, DC, on April 27,
2023.
Treena V. Garrett,
Federal Register Liaison Officer, U.S.
Department of Energy.
ddrumheller on DSK120RN23PROD with NOTICES1
[FR Doc. 2023–09301 Filed 5–1–23; 8:45 am]
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
Combined Notice of Filings
[Project No. 2466–037]
Appalachian Power Company; Notice
of Intent to Prepare an Environmental
Assessment
On February 28, 2022, Appalachian
Power Company (Appalachian) filed an
application for a new major license for
the 2.4-megawatt Niagara Hydroelectric
Project (Niagara Project; FERC No.
2466). The Niagara Project is located on
the Roanoke River, in Roanoke County,
Virginia. The project is adjacent to and
partially within the Blue Ridge
Parkway.
In accordance with the Commission’s
regulations, on February 7, 2023,
Commission staff issued a notice that
the project was ready for environmental
analysis (REA Notice). Based on the
information in the record, including
comments filed on the REA Notice, staff
does not anticipate that licensing the
project would constitute a major federal
action significantly affecting the quality
of the human environment. Therefore,
staff intends to prepare a draft and final
Environmental Assessment (EA) on the
application to relicense the Niagara
Project.
The EA will be issued and circulated
for review by all interested parties. All
comments filed on the EA will be
analyzed by staff and considered in the
Commission’s final licensing decision.
The application will be processed
according to the following schedule.
Revisions to the schedule may be made
as appropriate.
Milestone
Target date
Commission issues draft EA ....
Comments on draft EA ............
Commission issues final EA ....
November 2023.
December 2023.
April 2024.1
Any questions regarding this notice
may be directed to Laurie Bauer at (202)
502–6519 or laurie.bauer@ferc.gov.
Dated: April 26, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–09244 Filed 5–1–23; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6450–01–P
1 The Council on Environmental Quality’s (CEQ)
regulations under 40 CFR 1501.10(b)(1) require that
EAs be completed within 1 year of the federal
action agency’s decision to prepare an EA. This
notice establishes the Commission’s intent to
prepare a draft and final EA for the Niagara Project.
Therefore, in accordance with CEQ’s regulations,
the final EA must be issued within 1 year of the
issuance date of this notice.
VerDate Sep<11>2014
18:14 May 01, 2023
Jkt 259001
PO 00000
Frm 00068
Fmt 4703
Sfmt 4703
Take notice that the Commission has
received the following Natural Gas & Oil
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP23–707–000.
Applicants: Wyoming Interstate
Company, L.L.C.
Description: § 4(d) Rate Filing: Fuel_
LU Quarterly Update Filing June 1, 2023
to be effective 6/1/2023.
Filed Date: 4/25/23.
Accession Number: 20230425–5166.
Comment Date: 5 p.m. ET 5/8/23.
Docket Numbers: RP23–708–000.
Applicants: BP Canada Energy
Marketing Corp., BP Energy Company.
Description: Joint Petition for Limited
Waiver of Capacity Release Regulations,
et al. of BP Energy Co., et al.
Filed Date: 4/25/23.
Accession Number: 20230425–5290.
Comment Date: 5 p.m. ET 5/8/23.
Docket Numbers: RP23–709–000.
Applicants: Transwestern Pipeline
Company, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rates Filing—NRA Concord
& Talen/XTO Name Change to be
effective 5/1/2023.
Filed Date: 4/26/23.
Accession Number: 20230426–5085.
Comment Date: 5 p.m. ET 5/8/23.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
Filings in Existing Proceedings
Docket Numbers: RP19–423–004.
Applicants: Tallgrass Interstate Gas
Transmission, LLC.
Description: Petition to Amend
Settlement of Tallgrass Interstate Gas
Transmission, LLC.
Filed Date: 4/25/23.
Accession Number: 20230425–5325.
Comment Date: 5 p.m. ET 5/8/23.
Any person desiring to protest in any
the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system (https://
E:\FR\FM\02MYN1.SGM
02MYN1
Agencies
[Federal Register Volume 88, Number 84 (Tuesday, May 2, 2023)]
[Notices]
[Page 27498]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-09244]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2466-037]
Appalachian Power Company; Notice of Intent to Prepare an
Environmental Assessment
On February 28, 2022, Appalachian Power Company (Appalachian) filed
an application for a new major license for the 2.4-megawatt Niagara
Hydroelectric Project (Niagara Project; FERC No. 2466). The Niagara
Project is located on the Roanoke River, in Roanoke County, Virginia.
The project is adjacent to and partially within the Blue Ridge Parkway.
In accordance with the Commission's regulations, on February 7,
2023, Commission staff issued a notice that the project was ready for
environmental analysis (REA Notice). Based on the information in the
record, including comments filed on the REA Notice, staff does not
anticipate that licensing the project would constitute a major federal
action significantly affecting the quality of the human environment.
Therefore, staff intends to prepare a draft and final Environmental
Assessment (EA) on the application to relicense the Niagara Project.
The EA will be issued and circulated for review by all interested
parties. All comments filed on the EA will be analyzed by staff and
considered in the Commission's final licensing decision.
The application will be processed according to the following
schedule. Revisions to the schedule may be made as appropriate.
---------------------------------------------------------------------------
\1\ The Council on Environmental Quality's (CEQ) regulations
under 40 CFR 1501.10(b)(1) require that EAs be completed within 1
year of the federal action agency's decision to prepare an EA. This
notice establishes the Commission's intent to prepare a draft and
final EA for the Niagara Project. Therefore, in accordance with
CEQ's regulations, the final EA must be issued within 1 year of the
issuance date of this notice.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Commission issues draft EA................ November 2023.
Comments on draft EA...................... December 2023.
Commission issues final EA................ April 2024.\1\
------------------------------------------------------------------------
Any questions regarding this notice may be directed to Laurie Bauer
at (202) 502-6519 or [email protected].
Dated: April 26, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-09244 Filed 5-1-23; 8:45 am]
BILLING CODE 6717-01-P