Alabama Power Company; Notice of Intent To Prepare an Environmental Impact Statement, 20511 [2023-07207]
Download as PDF
20511
Federal Register / Vol. 88, No. 66 / Thursday, April 6, 2023 / Notices
Reimbursement and Power Cost Tracker
to be effective 5/1/2023.
Filed Date: 3/31/23.
Accession Number: 20230331–5249.
Comment Date: 5 p.m. ET 4/12/23.
DEPARTMENT OF ENERGY
Milestone
Target date
Federal Energy Regulatory
Commission
September 2023.
October 2023.
November 2023.
Docket Numbers: RP23–656–000.
Applicants: ANR Pipeline Company.
Description: § 4(d) Rate Filing: ANR—
Vitol 138868 Negotiated Rate Agreement
to be effective 4/1/2023.
Filed Date: 3/31/23.
Accession Number: 20230331–5259.
Comment Date: 5 p.m. ET 4/12/23.
Alabama Power Company; Notice of
Intent To Prepare an Environmental
Impact Statement
Issue draft EIS ..................
Draft EIS Public Meeting ..
Comments on draft EIS
due.
Commission issues final
EIS.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
Filings in Existing Proceedings
ddrumheller on DSK120RN23PROD with NOTICES1
Docket Numbers: RP23–584–001.
Applicants: Trailblazer Pipeline
Company LLC.
Description: Compliance filing: TPC
Annual Incidental Purchases and Sales
Report Amendment to be effective N/A.
Filed Date: 3/30/23.
Accession Number: 20230330–5156.
Comment Date: 5 p.m. ET 4/11/23.
Any person desiring to protest in any
the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 31, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[Project No. 2628–066]
On November 23, 2021, Alabama
Power Company filed an application for
a new major license to operate its 137.5megawatt (MW) 1 R.L. Harris
Hydroelectric Project (Harris Project;
FERC No. 2628). The project is located
on the Tallapoosa River near the City of
Lineville in Randolph, Clay, and
Cleburne Counties, Alabama. The Harris
Project also includes land within the
James D. Martin-Skyline Wildlife
Management Area located
approximately 110 miles north of Harris
Lake in Jackson County, Alabama. The
project occupies 4.90 acres of federal
land administered by the Bureau of
Land Management.
On July 31, 2018, Commission staff
issued Scoping Document 1, initiating
the scoping process for the project in
accordance with the National
Environmental Policy Act (NEPA) and
Commission regulations. On November
16, 2018, Commission staff issued a
revised scoping document (Scoping
Document 2). In accordance with the
Commission’s regulations, on January
17, 2023, Commission staff issued a
notice that the project was ready for
environmental analysis (REA Notice).
Based on the information in the record,
including comments filed during
scoping and in response to the REA
Notice, staff has determined that
relicensing the project may constitute a
major federal action significantly
affecting the quality of the human
environment. Therefore, staff intends to
prepare an Environmental Impact
Statement (EIS) for the Harris Project.
A draft EIS will be issued and
circulated for review by all interested
parties. All comments filed in response
to the REA notice, and on the draft EIS
will be analyzed by staff in a final EIS.
The staff’s conclusions and
recommendations will be available for
the Commission’s consideration in
reaching its final licensing decision.
The application will be processed
according to the following schedule.
Revisions to the schedule may be made
as appropriate.
[FR Doc. 2023–07220 Filed 4–5–23; 8:45 am]
1 This capacity includes a proposed 2.5–MW
increase in generation that would be provided
through a new minimum flow unit.
BILLING CODE 6717–01–P
VerDate Sep<11>2014
21:13 Apr 05, 2023
Jkt 259001
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
April 2024.2
Any questions regarding this notice
may be directed to Sarah Salazar at
(202) 502–6863 or sarah.salazar@
ferc.gov.
Dated: March 31, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–07207 Filed 4–5–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG23–112–000.
Applicants: AES ES Westwing, LLC.
Description: AES ES Westwing, LLC
submits Notice of Self–Certification of
Exempt Wholesale Generator Status.
Filed Date: 3/31/23.
Accession Number: 20230331–5448.
Comment Date: 5 p.m. ET 4/21/23.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER10–1776–007.
Applicants: Leaning Juniper Wind
Power II LLC.
Description: Compliance filing:
Compliance Filing to Reflect
Participation in the CAISO’s Western
EIM to be effective 3/24/2023.
Filed Date: 3/31/23.
Accession Number: 20230331–5198.
Comment Date: 5 p.m. ET 4/21/23.
Docket Numbers: ER10–2824–007.
Applicants: Big Horn Wind Project
LLC.
Description: Compliance filing:
Compliance Filing to Reflect
Participation in the CAISO’s Western
EIM to be effective 3/24/2023.
Filed Date: 3/31/23.
Accession Number: 20230331–5128.
2 The Council on Environmental Quality’s (CEQ)
regulations under 40 CFR 1501.10(b)(2) require that
a Record of Decision be completed within 2 years
of the federal action agency’s decision to prepare an
EIS. This notice establishes the Commission’s intent
to prepare a draft and final EIS for the Harris
Project. Therefore, in accordance with CEQ’s
regulations, the Commission must reach a licensing
decision within 2 years of the issuance date of this
notice.
E:\FR\FM\06APN1.SGM
06APN1
Agencies
[Federal Register Volume 88, Number 66 (Thursday, April 6, 2023)]
[Notices]
[Page 20511]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-07207]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2628-066]
Alabama Power Company; Notice of Intent To Prepare an
Environmental Impact Statement
On November 23, 2021, Alabama Power Company filed an application
for a new major license to operate its 137.5-megawatt (MW) \1\ R.L.
Harris Hydroelectric Project (Harris Project; FERC No. 2628). The
project is located on the Tallapoosa River near the City of Lineville
in Randolph, Clay, and Cleburne Counties, Alabama. The Harris Project
also includes land within the James D. Martin-Skyline Wildlife
Management Area located approximately 110 miles north of Harris Lake in
Jackson County, Alabama. The project occupies 4.90 acres of federal
land administered by the Bureau of Land Management.
---------------------------------------------------------------------------
\1\ This capacity includes a proposed 2.5-MW increase in
generation that would be provided through a new minimum flow unit.
---------------------------------------------------------------------------
On July 31, 2018, Commission staff issued Scoping Document 1,
initiating the scoping process for the project in accordance with the
National Environmental Policy Act (NEPA) and Commission regulations. On
November 16, 2018, Commission staff issued a revised scoping document
(Scoping Document 2). In accordance with the Commission's regulations,
on January 17, 2023, Commission staff issued a notice that the project
was ready for environmental analysis (REA Notice). Based on the
information in the record, including comments filed during scoping and
in response to the REA Notice, staff has determined that relicensing
the project may constitute a major federal action significantly
affecting the quality of the human environment. Therefore, staff
intends to prepare an Environmental Impact Statement (EIS) for the
Harris Project.
A draft EIS will be issued and circulated for review by all
interested parties. All comments filed in response to the REA notice,
and on the draft EIS will be analyzed by staff in a final EIS. The
staff's conclusions and recommendations will be available for the
Commission's consideration in reaching its final licensing decision.
The application will be processed according to the following
schedule. Revisions to the schedule may be made as appropriate.
------------------------------------------------------------------------
Milestone Target date
------------------------------------------------------------------------
Issue draft EIS........................ September 2023.
Draft EIS Public Meeting............... October 2023.
Comments on draft EIS due.............. November 2023.
Commission issues final EIS............ April 2024.\2\
------------------------------------------------------------------------
Any questions regarding this notice may be directed to Sarah
Salazar at (202) 502-6863 or [email protected].
---------------------------------------------------------------------------
\2\ The Council on Environmental Quality's (CEQ) regulations
under 40 CFR 1501.10(b)(2) require that a Record of Decision be
completed within 2 years of the federal action agency's decision to
prepare an EIS. This notice establishes the Commission's intent to
prepare a draft and final EIS for the Harris Project. Therefore, in
accordance with CEQ's regulations, the Commission must reach a
licensing decision within 2 years of the issuance date of this
notice.
Dated: March 31, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-07207 Filed 4-5-23; 8:45 am]
BILLING CODE 6717-01-P