Results 351 - 400 of 6,918
Sorted by Date | Sort by Relevance
Copper Valley Electric Association, Inc.; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process
Electric Association, Inc. (CVEA).
e. Name of Project: Solomon Gulch Hydroelectric Project.
f. Location: On Solomon Lake and Solomon Gulch Creek, in the
Chugach Census Area, in Valdez, Alaska. The project occupies Federal
lands under
Cushaw Hydro, LLC; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Non-capacity Amendment of License.
b. Project No: 906-040.
c. Date Filed: April 27, 2023.
d. Applicant
One-Time Informational Reports on Extreme Weather Vulnerability Assessments Climate Change, Extreme Weather, and Electric System Reliability
Report554429.pdf (Independent Market Monitor
reports average energy prices rose 226% in February because of the
Artic Event in February).
\29\ U.S. Energy Information Administration, Drought Effects on
Hydroelectricity Generation in Western U
Firstlight MA Hydro LLC; Northfield Mountain LLC; Notice of Settlement Agreement and Soliciting Comments
Light MA Hydro LLC and Northfield Mountain LLC
(collectively FirstLight).
e. Name of Projects: Turners Falls Hydroelectric Project and
Northfield Mountain Pumped Storage Project (collectively, projects).
f. Location: The existing projects
Green Mountain Power Corporation; Notice Soliciting Scoping Comments
Doc No: 2023-13603]
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2489-049]
Green Mountain Power Corporation; Notice Soliciting Scoping
Comments
Take notice that the following hydroelectric application has been
BOST2 Hydroelectric LLC; Notice of Surrender of Preliminary Permit
No: 2023-13604]
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 15058-001]
BOST2 Hydroelectric LLC; Notice of Surrender of Preliminary
Permit
Take notice that BOST2 Hydroelectric LLC, permittee for the
proposed Shawno
Brookfield White Pine Hydro, LLC; Errol Hydro Co., LLC; Notice of Availability of Final Environmental Assessment
the Errol Hydroelectric Project. The project is located on the
Androscoggin River and Umbagog Lake, near the Town of Errol, and
Township of Cambridge, in Coos County, New Hampshire, and the Towns of
Magalloway Plantation and Upton in Oxford County, Maine
Pacific Gas and Electric Company Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Request for a temporary variance of minimum
flow requirements.
b. Project No.: 619
Pacific Gas and Electric Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Application for Temporary Variance of Flow and
Flow-Related Environmental Monitoring
NorthWestern Corporation; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Non-capacity Amendment of License.
b. Project No: 2188-284.
c. Date Filed: June 2, 2023
Rochester Gas and Electric Corporation; Notice of Effectiveness of Withdrawal of Application for Amendment of License
Gas and Electric Corporation (licensee)
filed an application for non-capacity amendment of the license for the
14.8-megawatt Station No. 2 Hydroelectric Project No. 2582. On May 26,
2023, the licensee filed a notice of withdrawal of the amendment
City of Sturgis, Michigan; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Request for temporary variance of Article 401.
b. Project No.: 2964-045.
c. Date Filed: April
Endangered and Threatened Wildlife and Plants; Endangered Species Status for Southern Elktoe and Designation of Critical Habitat
to hydroelectric power generation, navigation releases,
lower flood peaks, and higher sustained minimum flows through dry
periods as the upstream reservoirs augment low flows. The alterations
in flow regimes that result from regulated rivers can have a direct
Reconsideration and Rescission of Termination of the Designation of Nicaragua for Temporary Protected Status; Extension of the Temporary Protected Status Designation for Nicaragua
category 2 stormdamaged 817 and
destroyed 120 homes and necessitated the evacuation of over 11,600
people.\26\ Also, consecutive years of drought (from November 2013 to
April 2016) \27\ negatively impacted agriculture, fishing, and
hydroelectric energy
Pyrites Hydro, LLC; Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions
, and Prescriptions
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 6115-016.
c. Date filed: August 31
Southern California Edison Company; Notice of Application for Surrender of License, Soliciting Comments, Motions To Intervene, and Protests
notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Proceeding: Application for surrender of license and
decommissioning of project facilities.
b. Project
Lake Lynn Generation, LLC; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests
that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 2459-279.
c. Date filed: November 30, 2022.
d. Applicant: Lake Lynn
Lock Hydro 10 Partners; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications
to
perform any land-disturbing activities or otherwise enter upon lands or
waters owned by others without the owners' express permission.
The proposed Boonesborough Hydroelectric Project would consist of
the following: (1) an existing 250-foot-long, 35
Emrgy Inc.; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene
for
such generation only the hydroelectric potential of
a non-federally owned conduit.
FPA 30(a)(3)(C)(ii)...................... The facility has an installed capacity that does not Y
Hydro Technology, Inc; Notice of Intent To Prepare an Environmental Assessment
an application
for a subsequent license to continue operating the existing 1,200-
kilowatt Meyers Falls Hydroelectric Project No. 2544 (Meyers Falls
Project or project). The project is located on the Colville River in
Stevens County, Washington. The project
Sunshine Act Meetings
Crest Energy Company.
H-3..................... P-12715-014..................... Fairlawn Hydroelectric Company, LLC.
H-4..................... P-2318-053; P-12252-035;........ Hudson River-Black River Regulating District
P
Grand River Dam Authority; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments
for
Licensing and Deadline for Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project
Marquette Board of Light and Power; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Request for a Temporary Variance of Flow
and Reservoir Elevation Requirements.
b
Moulton Niguel Water District; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene
Facility Hydroelectric Energy Recovery Project would have an installed
capacity of 224 kilowatts (kW), and would be located along the
applicant's existing water supply system in Laguna Hills, Orange
County, California.
Applicant Contact: Gregg Semler
Missisquoi, LLC; Notice of Scoping Meetings and Environmental Site Review and Soliciting Scoping Comments
hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 7186-054.
c. Date Filed: September 30, 2022.
d. Applicant: Missisquoi, LLC
White Rapids, LLC; Notice of Effectiveness of Withdrawal of Preliminary Permit Application
a
preliminary permit application pursuant to section 4(f) of the Federal
Power Act, proposing to study the feasibility of the Slater
Hydroelectric Project No. 15282 (Slater Project). On May 16, 2023,
White Rapids filed a notice of withdrawal of its
Town of Bedford, Virginia; Notice of Application Accepted for Filing, Soliciting Motions To Intervene and Protests, Ready for Environmental Analysis, and Soliciting Comments, Recommendations, Terms and Conditions, and Fishway Prescriptions
, and Soliciting Comments, Recommendations, Terms
and Conditions, and Fishway Prescriptions
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
[[Page 37059]]
a. Type
Green Lake Water Power Company; Notice of Intent To Prepare an Environmental Assessment
a relicense
application for the 500-kilowatt Green Lake Hydroelectric Project No.
7189 (project). The project is located on Green Lake and Reeds Brook in
Hancock County, Maine.
In accordance with the Commission's regulations, on March 23, 2023
Alabama Power Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Non-Capacity Amendment of License.
b. Project No: P-2146-273.
c. Date Filed: May 12, 2023.
d. Applicant
ALLETE, Inc.; Notice of Intent To File License Applications, Filing of Pre-Application Document (PAD), Commencement of ILP Pre-Filing Process, and Scoping; Request for Comments on the Pad and Scoping Document, and Identification of Issues and Associated Study Requests
and Commencing Pre-filing Process.
b. Project Nos.: P-2532-094, P-2454-085, and P-2663-064.
c. Dated Filed: March 30, 2023.
d. Submitted By: ALLETE, Inc. (ALLETE).
e. Name of Projects: Little Falls Hydroelectric Project (Little
Falls Project
Great Lakes Hydro America, LLC; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Request for a temporary amendment of
required reservoir elevation and flow releases.
b
Appalachian Power Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions to Intervene, and Protests
that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Revised Shoreline Management Plan (SMP).
b. Project No: 739-034.
c. Date Filed: November 15, 2022.
d
Commission Information Collection Activities (FERC-521); Comment Request; Extension
: The purpose of FERC-521 is to implement information
collections pursuant to section 10(f) of the Federal Power Act
(FPA).\1\ Under Section 10(f) licensees of unlicensed non-Federal
hydroelectric power projects that are directly benefited by a headwater
Little Falls Hydroelectric Associates, LP; Notice of Availability of Environmental Assessment
No: 2023-11295]
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 3509-042]
Little Falls Hydroelectric Associates, LP; Notice of Availability
of Environmental Assessment
In accordance with the National Environmental Policy
Boott Hydropower, LLC; Notice of Authorization for Continued Project Operation
-11242]
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2790-000]
Boott Hydropower, LLC; Notice of Authorization for Continued
Project Operation
The license for the Lowell Hydroelectric Project No. 2790 was
issued for a period ending
Town of Bedford, Virginia; Notice of Authorization for Continued Project Operation
-11238]
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 5596-000]
Town of Bedford, Virginia; Notice of Authorization for Continued
Project Operation
The license for the Bedford Hydroelectric Project No. 5596 was
issued for a period
Credit Assistance and Related Fees for Water Resources Infrastructure Projects
appropriated $553,600,000 until expended for EPAct 2005 Section 247:
Maintaining and Enhancing Hydroelectricity Incentives to the US
Department of Energy (DOE) for making incentive payments to owners and
authorized operators of qualified hydroelectric
Solar and Battery Programmatic Environmental Impact Statement
of this
mission is the generation, transmission, and sale of reliable and
affordable electric energy. As part of its diversified energy strategy,
TVA produces or obtains electricity from a diverse portfolio of energy
sources, including solar, hydroelectric
Pumped Storage Hydro Programmatic Environmental Impact Statement
review can then be relied upon when
agencies make decisions based on the programmatic EIS, as well as
decisions based on a subsequent (also known as tiered) NEPA review.
Background
PSH is a type of hydroelectric energy storage that consists of two
Integrated Resource Plan and Environmental Impact Statement
of the power it
distributes with three nuclear plants, five coal-fired plants, nine
simple-cycle combustion turbine plants, eight combined-cycle combustion
turbine plants, 29 hydroelectric dams, a pumped-storage facility, a
diesel-fired facility, and 13
Pipeline Safety: Gas Pipeline Leak Detection and Repair
of the Interior`s Bureau of Reclamation proposed
significant cuts to water allocations from the Colorado River to
Arizona, Nevada, and Mexico in order to ensure continued operation of
hydroelectric generation facilities.\33\ In late June and early July of
2021
Kaukauna Utilities; Notice Soliciting Scoping Comments
Doc No: 2023-10514]
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2715-026]
Kaukauna Utilities; Notice Soliciting Scoping Comments
Take notice that the following hydroelectric application has been
filed
Village of Enosburg Falls, Vermont; Notice of Authorization for Continued Project Operation
Hydroelectric Project No. 2905
was issued for a period ending April 30, 2023.
Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1), requires the
Commission, at the expiration of a license term, to issue from year-to-
year an annual license to the then licensee
Kaukauna Utilities; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests
hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: P-2715-026.
c. Date filed: July 22, 2022.
d. Applicant: Kaukauna Utilities (Kaukauna
Seattle City Light; Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments
for Submission of Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 553-244.
c. Date
Notice of Funding Opportunity for the Empowering Rural America (New ERA) Program
), geothermal, hydroelectric, or energy sources
that are naturally replenished and do not run out; or (2) hydrogen
derived from renewable biomass or water using an energy source
described in subparagraph (1).
Renewable Energy Systems. For purposes
Tivis Branch Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications
Applications
On January 3, 2023, Tivis Branch Hydro, LLC, filed an application
for a preliminary permit, pursuant to section 4(f) of the Federal Power
Act (FPA), proposing to study the feasibility of the Flannagan
Hydroelectric Project to be located
Endangered and Threatened Species: Designation of Nonessential Experimental Populations of Chinook Salmon Upstream of Shasta Dam, Authorization for Release, and Adoption of Limited Protective Regulations Under the Endangered Species Act Sections 10(j) and 4(s)
Regulatory Commission (FERC), pursuant to the
Federal Power Act (FPA) and the U.S. Department of Energy Organization
Act, is authorized to issue licenses for up to 50 years for the
construction and operation of non-Federal hydroelectric developments
Green Mountain Power Corporation; Notice Soliciting Scoping Comments
No: 2023-10065]
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2490-031]
Green Mountain Power Corporation; Notice Soliciting Scoping
Comments
Take notice that the following hydroelectric application has been
filed
Erie Boulevard Hydropower, L.P.; Notice Soliciting Scoping Comments
No: 2023-10064]
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 15000-003]
Erie Boulevard Hydropower, L.P.; Notice Soliciting Scoping
Comments
Take notice that the following hydroelectric application has been
filed
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.