Download as PDF lotter on DSK11XQN23PROD with NOTICES1 Federal Register / Vol. 88, No. 106 / Friday, June 2, 2023 / Notices Comment Date: 5 p.m. ET 6/16/23. Docket Numbers: ER23–1161–000. Applicants: Pacific Gas and Electric Company. Description: Refund Report: CCSF Refund Report for missed Unmetered Points (WDT SA 275) to be effective N/A. Filed Date: 5/26/23. Accession Number: 20230526–5000. Comment Date: 5 p.m. ET 6/16/23. Docket Numbers: ER23–1972–000. Applicants: Energy Harbor LLC. Description: Request for Waiver and Expedited Consideration of Energy Harbor LLC. Filed Date: 5/25/23. Accession Number: 20230525–5197. Comment Date: 5 p.m. ET 6/15/23. Docket Numbers: ER23–1973–000. Applicants: BE-Pine 1 LLC. Description: Baseline eTariff Filing: Baseline new to be effective 5/27/2023. Filed Date: 5/26/23. Accession Number: 20230526–5111. Comment Date: 5 p.m. ET 6/16/23. Docket Numbers: ER23–1975–000. Applicants: Tri-State Generation and Transmission Association, Inc. Description: § 205(d) Rate Filing: Initial Filing of Service Agreement No. 911 to be effective 4/27/2023. Filed Date: 5/26/23. Accession Number: 20230526–5120. Comment Date: 5 p.m. ET 6/16/23. Docket Numbers: ER23–1976–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) Rate Filing: Amendment to ISA, Service Agreement No. 6163; Queue No. AD1–155 to be effective 7/26/2023. Filed Date: 5/26/23. Accession Number: 20230526–5137. Comment Date: 5 p.m. ET 6/16/23. Docket Numbers: ER23–1977–000. Applicants: California Independent System Operator Corporation. Description: § 205(d) Rate Filing: 2023–05–26 Recollation-Assigning New Collation Values (no tariff changes) 1 of 2 to be effective 6/28/2010. Filed Date: 5/26/23. Accession Number: 20230526–5166. Comment Date: 5 p.m. ET 6/16/23. The filings are accessible in the Commission’s eLibrary system (https:// elibrary.ferc.gov/idmws/search/ fercgensearch.asp) by querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. VerDate Sep<11>2014 17:34 Jun 01, 2023 Jkt 259001 Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: May 26, 2023. Kimberly D. Bose, Secretary. [FR Doc. 2023–11764 Filed 6–1–23; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2146–273] Alabama Power Company; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Non-Capacity Amendment of License. b. Project No: P–2146–273. c. Date Filed: May 12, 2023. d. Applicant: Alabama Power Company (Alabama Power). e. Name of Project: Coosa River Project. f. Location: The project is located on the Coosa River, in Coosa, Chilton, Talladega and Shelby counties, Alabama. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Alan L. Peeples, Alabama Power Company, 600 North 18th Street, P.O. Box 2641, Birmingham, AL 35291–8180, (205) 257–1401. i. FERC Contact: Zeena Aljibury, (202) 502–6065, zeena.aljibury@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests is 30 days from the issuance date of this notice by the Commission. The Commission strongly encourages electronic filing. Please file motions to intervene, protests, comments, or recommendations using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 36303 name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include the docket number P–2146–273. Comments emailed to Commission staff are not considered part of the Commission record. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Description of Request: Alabama Power requests approval to modify Unit 3 at the Lay Development to address significant maintenance needs and to improve power and efficiency. The proposed scope of work for Unit 3 includes complete turbine replacement, wicket gate replacement, wicket gate stem bushings installation, turbine, and generator bearing upgrades, and related component replacement. Alabama Power states the turbine replacement is not expected to result in an increase to the total rated capacity or the maximum discharge of the unit at rated conditions. Alabama Power notes that project operations will not change, and refurbishment will not include any structural changes to the project facilities. l. Locations of the Application: This filing may be viewed on the Commission’s website at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for E:\FR\FM\02JNN1.SGM 02JNN1 lotter on DSK11XQN23PROD with NOTICES1 36304 Federal Register / Vol. 88, No. 106 / Friday, June 2, 2023 / Notices TTY, call (202) 502–8659. Agencies may obtain copies of the application directly from the applicant. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214, respectively. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person commenting, protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. Any filing made by an intervenor must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010. p. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. Dated: May 26, 2023. Kimberly D. Bose, Secretary. [FR Doc. 2023–11762 Filed 6–1–23; 8:45 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 17:34 Jun 01, 2023 Jkt 259001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2532–094, Project No. 2454– 085, Project No. 2663–064] ALLETE, Inc.; Notice of Intent To File License Applications, Filing of PreApplication Document (PAD), Commencement of ILP Pre-Filing Process, and Scoping; Request for Comments on the Pad and Scoping Document, and Identification of Issues and Associated Study Requests a. Type of Filing: Notice of Intent to File License Applications for New Licenses and Commencing Pre-filing Process. b. Project Nos.: P–2532–094, P–2454– 085, and P–2663–064. c. Dated Filed: March 30, 2023. d. Submitted By: ALLETE, Inc. (ALLETE). e. Name of Projects: Little Falls Hydroelectric Project (Little Falls Project), Sylvan Hydroelectric Project (Sylvan Project), and Pillager Hydroelectric Project (Pillager Project). f. Location: The Little Falls Project is on the Mississippi River near the City of Little Falls in Morrison County, Minnesota. The Sylvan Project is located on the Crow Wing River near the City of Baxter in Cass, Crow Wing, and Morrison Counties, Minnesota. The Pillager Project is located on the Crow Wing River near the City of Pillager in Cass and Morrison Counties, Minnesota. g. Filed Pursuant to: 18 CFR part 5 of the Commission’s Regulations. h. Applicant Contact: Mr. Greg Prom, Senior Environmental Compliance Specialist, Minnesota Power/ALLETE, Inc., 30 West Superior Street, Duluth, MN 55802–2093; Phone at (218) 355– 3191 or email at gprom@allete.com. i. FERC Contact: Jay Summers at (202) 502–8764; or email at jay.summers@ ferc.gov. j. Cooperating agencies: Federal, State, local, and Tribal agencies with jurisdiction and/or special expertise with respect to environmental issues that wish to cooperate in the preparation of the environmental document should follow the instructions for filing such requests described in item o below. Cooperating agencies should note the Commission’s policy that agencies that cooperate in the preparation of the environmental document cannot also intervene. See 94 FERC ¶ 61,076 (2001). k. With this notice, we are initiating informal consultation with: (a) the U.S. Fish and Wildlife Service under section 7 of the Endangered Species Act and the PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 joint agency regulations thereunder at 50 CFR part 402 and (b) the State Historic Preservation Officer, as required by section 106, National Historic Preservation Act, and the implementing regulations of the Advisory Council on Historic Preservation at 36 CFR 800.2. l. With this notice, we are designating ALLETE as the Commission’s nonFederal representative for carrying out informal consultation, pursuant to section 7 of the Endangered Species Act and section 106 of the National Historic Preservation Act. m. ALLETE filed with the Commission a Pre-Application Document (PAD; including a proposed process plan and schedule), pursuant to 18 CFR 5.6 of the Commission’s regulations. n. A copy of the PAD may be viewed on the Commission’s website (https:// www.ferc.gov) using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field, to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208–3676 or TYY, (202) 502–8659. You may register online at https:// ferconline.ferc.gov/FERCOnline.aspx to be notified via email of new filings and issuances related to these or other pending projects. For assistance, contact FERC Online Support. o. With this notice, we are soliciting comments on the PAD and Commission staff’s Scoping Document 1 (SD1), as well as study requests. All comments on the PAD and SD1, and study requests should be sent to the addresses above in paragraph h. In addition, all comments on the PAD and SD1, study requests, requests for cooperating agency status, and all communications to and from Commission staff related to the merits of the potential application must be filed with the Commission. The Commission strongly encourages electronic filing. Please file all documents using the Commission’s eFiling system at https://ferconline. ferc.gov/FERCOnline.aspx. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// ferconline.ferc.gov/QuickComment. aspx. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support. In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, E:\FR\FM\02JNN1.SGM 02JNN1

Agencies

[Federal Register Volume 88, Number 106 (Friday, June 2, 2023)]
[Notices]
[Pages 36303-36304]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-11762]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2146-273]


Alabama Power Company; Notice of Application Accepted for Filing 
and Soliciting Comments, Motions To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Application Type: Non-Capacity Amendment of License.
    b. Project No: P-2146-273.
    c. Date Filed: May 12, 2023.
    d. Applicant: Alabama Power Company (Alabama Power).
    e. Name of Project: Coosa River Project.
    f. Location: The project is located on the Coosa River, in Coosa, 
Chilton, Talladega and Shelby counties, Alabama.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: Alan L. Peeples, Alabama Power Company, 600 
North 18th Street, P.O. Box 2641, Birmingham, AL 35291-8180, (205) 257-
1401.
    i. FERC Contact: Zeena Aljibury, (202) 502-6065, 
[email protected].
    j. Deadline for filing comments, motions to intervene, and protests 
is 30 days from the issuance date of this notice by the Commission.
    The Commission strongly encourages electronic filing. Please file 
motions to intervene, protests, comments, or recommendations using the 
Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 
characters, without prior registration, using the eComment system at 
https://www.ferc.gov/docs-filing/ecomment.asp. You must include your 
name and contact information at the end of your comments. For 
assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, you may submit a paper copy. 
Submissions sent via the U.S. Postal Service must be addressed to: 
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 
First Street NE, Room 1A, Washington, DC 20426. Submissions sent via 
any other carrier must be addressed to: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, 
Maryland 20852. The first page of any filing should include the docket 
number P-2146-273. Comments emailed to Commission staff are not 
considered part of the Commission record.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person whose name appears on the official service 
list for the project. Further, if an intervenor files comments or 
documents with the Commission relating to the merits of an issue that 
may affect the responsibilities of a particular resource agency, they 
must also serve a copy of the document on that resource agency.
    k. Description of Request: Alabama Power requests approval to 
modify Unit 3 at the Lay Development to address significant maintenance 
needs and to improve power and efficiency. The proposed scope of work 
for Unit 3 includes complete turbine replacement, wicket gate 
replacement, wicket gate stem bushings installation, turbine, and 
generator bearing upgrades, and related component replacement. Alabama 
Power states the turbine replacement is not expected to result in an 
increase to the total rated capacity or the maximum discharge of the 
unit at rated conditions. Alabama Power notes that project operations 
will not change, and refurbishment will not include any structural 
changes to the project facilities.
    l. Locations of the Application: This filing may be viewed on the 
Commission's website at https://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. You may also register 
online at https://www.ferc.gov/docs-filing/esubscription.asp to be 
notified via email of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208-3676 or email 
[email protected], for

[[Page 36304]]

TTY, call (202) 502-8659. Agencies may obtain copies of the application 
directly from the applicant.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214, respectively. In determining the appropriate action to take, the 
Commission will consider all protests or other comments filed, but only 
those who file a motion to intervene in accordance with the 
Commission's Rules may become a party to the proceeding. Any comments, 
protests, or motions to intervene must be received on or before the 
specified comment date for the particular application.
    o. Filing and Service of Documents: Any filing must (1) bear in all 
capital letters the title ``COMMENTS'', ``PROTEST'', or ``MOTION TO 
INTERVENE'' as applicable; (2) set forth in the heading the name of the 
applicant and the project number of the application to which the filing 
responds; (3) furnish the name, address, and telephone number of the 
person commenting, protesting or intervening; and (4) otherwise comply 
with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis. Any filing made by an intervenor must be accompanied 
by proof of service on all persons listed in the service list prepared 
by the Commission in this proceeding, in accordance with 18 CFR 
385.2010.
    p. The Commission's Office of Public Participation (OPP) supports 
meaningful public engagement and participation in Commission 
proceedings. OPP can help members of the public, including landowners, 
environmental justice communities, Tribal members and others, access 
publicly available information and navigate Commission processes. For 
public inquiries and assistance with making filings such as 
interventions, comments, or requests for rehearing, the public is 
encouraged to contact OPP at (202) 502-6595 or [email protected].

    Dated: May 26, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-11762 Filed 6-1-23; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.