BOST2 Hydroelectric LLC; Notice of Surrender of Preliminary Permit, 41612 [2023-13604]
Download as PDF
ddrumheller on DSK120RN23PROD with NOTICES1
41612
Federal Register / Vol. 88, No. 122 / Tuesday, June 27, 2023 / Notices
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is July 11,
2023.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
may mail similar pleadings to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426. Hand delivered submissions in
docketed proceedings should be
delivered to Health and Human
Services, 12225 Wilkins Avenue,
Rockville, Maryland 20852.
In addition to publishing the full text
of this document in the Federal
Register, the Commission provides all
interested persons an opportunity to
view and/or print the contents of this
document via the internet through the
Commission’s Home Page (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. At this
time, the Commission has suspended
access to the Commission’s Public
Reference Room, due to the
proclamation declaring a National
Emergency concerning the Novel
Coronavirus Disease (COVID–19), issued
by the President on March 13, 2020. For
assistance, contact the Federal Energy
Regulatory Commission at
FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
VerDate Sep<11>2014
18:54 Jun 26, 2023
Jkt 259001
Dated: June 21, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
Federal Energy Regulatory
Commission
Comment Date: 5 p.m. ET 7/3/23.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
[Project No. 15058–001]
Filings in Existing Proceedings
BOST2 Hydroelectric LLC; Notice of
Surrender of Preliminary Permit
Docket Numbers: PR23–44–001.
Applicants: Moss Bluff Hub, LLC.
Description: § 284.123 Rate Filing:
Moss Bluff—TPGS Market Power Study
Notification to be effective N/A.
Filed Date: 6/20/23.
Accession Number: 20230620–5227.
Comment Date: 5 p.m. ET 7/11/23.
Docket Numbers: RP23–683–001.
Applicants: Egan Hub Storage, LLC.
Description: Compliance filing:
Egan—TPGS Market Power Study
Notification to be effective N/A.
Filed Date: 6/20/23.
Accession Number: 20230620–5223.
Comment Date: 5 p.m. ET 7/3/23.
Docket Numbers: RP23–685–001.
Applicants: Bobcat Gas Storage.
Description: Compliance filing:
Bobcat—TPGS Market Power Study
Notification to be effective N/A.
Filed Date: 6/20/23.
Accession Number: 20230620–5222.
Comment Date: 5 p.m. ET 7/3/23.
Any person desiring to protest in any
the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
[FR Doc. 2023–13612 Filed 6–26–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Take notice that BOST2 Hydroelectric
LLC, permittee for the proposed Shawno
County Pumped Storage Project No.
15058, has requested that its
preliminary permit be terminated. The
permit was issued on May 5, 2021, and
would have expired on April 30, 2025.1
The project would have been located
near the Embarrass River and the Village
of Tigerton, Shawano County,
Wisconsin.
The preliminary permit for Project
No. 15058 will remain in effect until the
close of business, thirty days from the
date of this notice. But, if the
Commission is closed on this day, then
the permit remains in effect until the
close of business on the next day in
which the Commission is open.2 New
applications for this site may not be
submitted until after the permit
surrender is effective.
Dated: June 21, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–13604 Filed 6–26–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas & Oil
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP23–843–000.
Applicants: Stagecoach Pipeline &
Storage Company LLC.
Description: § 4(d) Rate Filing:
Stagecoach Pipeline & Storage Company
LLC—Equinor Natural SP386894 to be
effective 7/1/2023.
Filed Date: 6/21/23.
Accession Number: 20230621–5025.
1 175
2 18
PO 00000
FERC ¶ 62,051 (2021).
CFR 385.2007(a)(2) (2022).
Frm 00027
Fmt 4703
Sfmt 4703
E:\FR\FM\27JNN1.SGM
27JNN1
Agencies
[Federal Register Volume 88, Number 122 (Tuesday, June 27, 2023)]
[Notices]
[Page 41612]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-13604]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 15058-001]
BOST2 Hydroelectric LLC; Notice of Surrender of Preliminary
Permit
Take notice that BOST2 Hydroelectric LLC, permittee for the
proposed Shawno County Pumped Storage Project No. 15058, has requested
that its preliminary permit be terminated. The permit was issued on May
5, 2021, and would have expired on April 30, 2025.\1\ The project would
have been located near the Embarrass River and the Village of Tigerton,
Shawano County, Wisconsin.
---------------------------------------------------------------------------
\1\ 175 FERC ] 62,051 (2021).
---------------------------------------------------------------------------
The preliminary permit for Project No. 15058 will remain in effect
until the close of business, thirty days from the date of this notice.
But, if the Commission is closed on this day, then the permit remains
in effect until the close of business on the next day in which the
Commission is open.\2\ New applications for this site may not be
submitted until after the permit surrender is effective.
---------------------------------------------------------------------------
\2\ 18 CFR 385.2007(a)(2) (2022).
Dated: June 21, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-13604 Filed 6-26-23; 8:45 am]
BILLING CODE 6717-01-P