Sunshine Act Meetings, 38505-38506 [2023-12738]
Download as PDF
ddrumheller on DSK120RN23PROD with NOTICES1
Federal Register / Vol. 88, No. 113 / Tuesday, June 13, 2023 / Notices
Docket Numbers: ER23–2087–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
Ameren Services Company.
Description: § 205(d) Rate Filing:
Midcontinent Independent System
Operator, Inc. submits tariff filing per
35.13(a)(2)(iii: 2023–06–07_SA 2880 Att
A Proj Spec No. 11–WVPA-Mineral
Switching Station to be effective 8/7/
2023.
Filed Date: 6/7/23.
Accession Number: 20230607–5034.
Comment Date: 5 p.m. ET 6/28/23.
Docket Numbers: ER23–2088–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) Rate Filing:
2023–06–07_SA 4071 Duke EnergyLowland Solar Park GIA (J1390) to be
effective 8/7/2023.
Filed Date: 6/7/23.
Accession Number: 20230607–5037.
Comment Date: 5 p.m. ET 6/28/23.
Docket Numbers: ER23–2090–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
Attachment AF Tariff Records
Modification to be effective 8/7/2023.
Filed Date: 6/7/23.
Accession Number: 20230607–5062.
Comment Date: 5 p.m. ET 6/28/23.
Docket Numbers: ER23–2091–000.
Applicants: Goleta Energy Storage,
LLC.
Description: Baseline eTariff Filing:
Market-Based Rate Application to be
effective 6/8/2023.
Filed Date: 6/7/23.
Accession Number: 20230607–5106.
Comment Date: 5 p.m. ET 6/28/23.
Docket Numbers: ER23–2092–000.
Applicants: RE Gaskell West 2 LLC.
Description: Initial rate filing: RE
Gaskell West 2 Amended LGIA CoTenancy Agreement to be effective 6/8/
2023.
Filed Date: 6/7/23.
Accession Number: 20230607–5148.
Comment Date: 5 p.m. ET 6/28/23.
Docket Numbers: ER23–2093–000.
Applicants: RE Gaskell West LLC.
Description: Tariff Amendment: RE
Gaskell West LLC Cancellation of CTA
to be effective 6/8/2023.
Filed Date: 6/7/23.
Accession Number: 20230607–5158.
Comment Date: 5 p.m. ET 6/28/23.
Take notice that the Commission
received the following qualifying
facility filings:
Docket Numbers: QF23–284–000.
VerDate Sep<11>2014
18:45 Jun 12, 2023
Jkt 259001
Applicants: WED Coventry Five, LLC.
Description: Revised Refund Report of
WED Coventry Five, LLC.
Filed Date: 6/7/23.
Accession Number: 20230607–5118.
Comment Date: 5 p.m. ET 6/28/23.
The filings are accessible in the
Commission’s eLibrary system (https://
elibrary.ferc.gov/idmws/search/
fercgensearch.asp) by querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202)502–6595 or OPP@
ferc.gov.
Dated: June 7, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–12628 Filed 6–12–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER23–1660–000]
Cleco Power LLC; Notice Shortening
Comment Period
1. On June 6, 2023, Cleco Power LLC
(Cleco) filed an Unopposed Second
Motion for Extension of Comment
Period and Limited Abeyance (Motion).
PO 00000
Frm 00028
Fmt 4703
Sfmt 4703
38505
Cleco’s Motion requests an extension of
time from June 8, 2023 to June 29, 2023,
to comment on its Request for Limited
Waiver and Expedited Consideration,
requesting waiver of the Midcontinent
Independent System Operator, Inc.’s
(MISO) Open Access Transmission,
Energy and Operating Reserve Markets
Tariff to allow it to extend its expected
Commercial Operation Date under the
MISO Generator Replacement Process,
filed on April 18, 2023, in the abovecaptioned proceeding. Cleco requests
that the Commission shorten the period
for responses to this motion to one
business day.
2. Upon consideration, notice is
hereby given that the deadline for filing
answers to Cleco’s June 6, 2023 Motion
is shortened to 12:00 p.m., EST, on
Thursday June 8, 2023.
Dated: June 7, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023–12629 Filed 6–12–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Sunshine Act Meetings
The following notice of meeting is
published pursuant to section 3(a) of the
government in the Sunshine Act (Pub.
L. 94–409), 5 U.S.C. 552b:
AGENCY HOLDING MEETING: Federal
Energy Regulatory Commission.
TIME AND DATE: June 15, 2023, 10:00 a.m.
PLACE: Room 2C, 888 First Street NE,
Washington, DC 20426.
STATUS: Open to the public.
MATTERS TO BE CONSIDERED: Agenda. *
Note—Items listed on the agenda may
be deleted without further notice.
CONTACT PERSON FOR MORE INFORMATION:
Kimberly D. Bose, Secretary. Telephone
(202) 502–8400.
For a recorded message listing items
stricken from or added to the meeting,
call (202) 502–8627.
This is a list of matters to be
considered by the Commission. It does
not include a listing of all documents
relevant to the items on the agenda. All
public documents, however, may be
viewed online at the Commission’s
website at https://elibrary.ferc.gov/
eLibrary/search using the eLibrary link.
E:\FR\FM\13JNN1.SGM
13JNN1
38506
Federal Register / Vol. 88, No. 113 / Tuesday, June 13, 2023 / Notices
1102ND—MEETING
[Open Meeting; June 15, 2023, 10:00 a.m.]
Item No.
Docket No.
Company
Administrative
A–1 ........
A–2 ........
A–3 ........
AD23–1–000 ................................................
AD23–2–000 ................................................
AD23–8–000 ................................................
Agency Administrative Matters.
Customer Matters, Reliability, Security and Market Operations.
FERC–NERC-Regional Entity Joint Inquiry into Winter Storm Elliot.
Electric
E–1 ........
E–2 ........
RM22–10–000 .............................................
RM22–16–000; AD21–13–000 ....................
E–3
E–4
E–5
E–6
E–7
E–8
........
........
........
........
........
........
RM22–13–000 .............................................
ER22–2467–000; ER22–2468–000 ............
ER22–2357–000 ..........................................
ER22–2363–000 ..........................................
ER22–2161–001 ..........................................
ER22–2341–000 ..........................................
E–9 ........
E–10 ......
E–11 ......
E–12 ......
E–13 ......
ER22–2361–000 ..........................................
ER22–2292–000 ..........................................
ER22–2335–000 ..........................................
EL23–23–001 ..............................................
EL21–3–001 ................................................
EL21–6–001 ................................................
EL21–94–000 (not consolidated) ................
Transmission System Planning Performance Requirements for Extreme Weather.
One-Time Informational Reports on Extreme Weather Vulnerability Assessments Climate Change, Extreme Weather, and Electric System Reliability.
Credit-Related Information Sharing in Organized Wholesale Electric Markets.
ISO New England Inc.
ISO New England Inc.
Midcontinent Independent System Operator, Inc.
Golden Spread Electric Cooperative, Inc.
Alabama Power Company, Georgia Power Company, and Mississippi Power Company.
Puget Sound Energy, Inc.
Idaho Power Company.
Public Service Company of New Mexico.
Coalition of Eastside Neighborhoods for Sensible Energy v. Puget Sound Energy, Inc.
NextEra Energy Seabrook, LLC.
NECEC Transmission LLC and Avagrid, Inc. v. NextEra Energy Resources, LLC and
NextEra Seabrook, LLC.
ISO New England Inc.
Gas
G–1 ........
CP23–5–000 ................................................
Northern Indiana Public Service Company LLC.
Hydro
H–1
H–2
H–3
H–4
........
........
........
........
P–2701–065 ................................................
P–13123–032 ..............................................
P–12715–014 ..............................................
P–2318–053; P–12252–035; .......................
P–2318–054; P–12252–036 ........................
Erie Boulevard Hydropower, L.P.
Eagle Crest Energy Company.
Fairlawn Hydroelectric Company, LLC.
Hudson River-Black River Regulating District
Erie Boulevard Hydropower, L.P.
Certificates
C–1 ........
C–2 ........
ddrumheller on DSK120RN23PROD with NOTICES1
C–3 ........
CP22–44–000 ..............................................
CP20–528–000; CP20–528–001; CP20–
529–000.
CP16–22–007 ..............................................
A free webcast of this event is
available through the Commission’s
website. Anyone with internet access
who desires to view this event can do
so by navigating to www.ferc.gov’s
Calendar of Events and locating this
event in the Calendar. The Federal
Energy Regulatory Commission provides
technical support for the free webcasts.
Please call (202) 502–8680 or email
customer@ferc.gov if you have any
questions.
Immediately following the conclusion
of the Commission Meeting, a press
briefing will be held in the Commission
Meeting Room. Members of the public
may view this briefing in the designated
overflow room. This statement is
intended to notify the public that the
press briefings that follow Commission
meetings may now be viewed remotely
VerDate Sep<11>2014
18:45 Jun 12, 2023
Jkt 259001
Equitrans, L.P.
Stingray Pipeline Company, L.L.C.
NEXUS Gas Transmission, LLC.
at Commission headquarters but will
not be telecast.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Issued: June 8, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[Docket No. RP23–809–000]
[FR Doc. 2023–12738 Filed 6–9–23; 4:15 pm]
LSP University Park, LLC; University
Park Energy, LLC; Notice of Petition
for Declaratory Order
BILLING CODE 6717–01–P
PO 00000
Take notice that on May 23, 2023,
pursuant to Rule 207(a)(2) of the Federal
Energy Regulatory Commission’s
(Commission) Rules of Practice and
Procedure, LSP University Park, LLC
and University Park Energy, LLC hereby
petition the Commission for a
declaratory order related to ANR
Pipeline Company’s recent actions
during Winter Storm Elliott.
Frm 00029
Fmt 4703
Sfmt 4703
E:\FR\FM\13JNN1.SGM
13JNN1
Agencies
[Federal Register Volume 88, Number 113 (Tuesday, June 13, 2023)]
[Notices]
[Pages 38505-38506]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-12738]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Sunshine Act Meetings
The following notice of meeting is published pursuant to section
3(a) of the government in the Sunshine Act (Pub. L. 94-409), 5 U.S.C.
552b:
Agency Holding Meeting: Federal Energy Regulatory Commission.
TIME AND DATE: June 15, 2023, 10:00 a.m.
PLACE: Room 2C, 888 First Street NE, Washington, DC 20426.
STATUS: Open to the public.
MATTERS TO BE CONSIDERED: Agenda. * Note--Items listed on the agenda
may be deleted without further notice.
CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary.
Telephone (202) 502-8400.
For a recorded message listing items stricken from or added to the
meeting, call (202) 502-8627.
This is a list of matters to be considered by the Commission. It
does not include a listing of all documents relevant to the items on
the agenda. All public documents, however, may be viewed online at the
Commission's website at https://elibrary.ferc.gov/eLibrary/search using
the eLibrary link.
[[Page 38506]]
1102nd--MEETING
[Open Meeting; June 15, 2023, 10:00 a.m.]
----------------------------------------------------------------------------------------------------------------
Item No. Docket No. Company
----------------------------------------------------------------------------------------------------------------
Administrative
----------------------------------------------------------------------------------------------------------------
A-1..................... AD23-1-000...................... Agency Administrative Matters.
A-2..................... AD23-2-000...................... Customer Matters, Reliability, Security and Market
Operations.
A-3..................... AD23-8-000...................... FERC-NERC-Regional Entity Joint Inquiry into Winter
Storm Elliot.
----------------------------------------------------------------------------------------------------------------
Electric
----------------------------------------------------------------------------------------------------------------
E-1..................... RM22-10-000..................... Transmission System Planning Performance
Requirements for Extreme Weather.
E-2..................... RM22-16-000; AD21-13-000........ One-Time Informational Reports on Extreme Weather
Vulnerability Assessments Climate Change, Extreme
Weather, and Electric System Reliability.
E-3..................... RM22-13-000..................... Credit-Related Information Sharing in Organized
Wholesale Electric Markets.
E-4..................... ER22-2467-000; ER22-2468-000.... ISO New England Inc.
E-5..................... ER22-2357-000................... ISO New England Inc.
E-6..................... ER22-2363-000................... Midcontinent Independent System Operator, Inc.
E-7..................... ER22-2161-001................... Golden Spread Electric Cooperative, Inc.
E-8..................... ER22-2341-000................... Alabama Power Company, Georgia Power Company, and
Mississippi Power Company.
E-9..................... ER22-2361-000................... Puget Sound Energy, Inc.
E-10.................... ER22-2292-000................... Idaho Power Company.
E-11.................... ER22-2335-000................... Public Service Company of New Mexico.
E-12.................... EL23-23-001..................... Coalition of Eastside Neighborhoods for Sensible
Energy v. Puget Sound Energy, Inc.
E-13.................... EL21-3-001...................... NextEra Energy Seabrook, LLC.
EL21-6-001...................... NECEC Transmission LLC and Avagrid, Inc. v. NextEra
Energy Resources, LLC and NextEra Seabrook, LLC.
EL21-94-000 (not consolidated).. ISO New England Inc.
----------------------------------------------------------------------------------------------------------------
Gas
----------------------------------------------------------------------------------------------------------------
G-1..................... CP23-5-000...................... Northern Indiana Public Service Company LLC.
----------------------------------------------------------------------------------------------------------------
Hydro
----------------------------------------------------------------------------------------------------------------
H-1..................... P-2701-065...................... Erie Boulevard Hydropower, L.P.
H-2..................... P-13123-032..................... Eagle Crest Energy Company.
H-3..................... P-12715-014..................... Fairlawn Hydroelectric Company, LLC.
H-4..................... P-2318-053; P-12252-035;........ Hudson River-Black River Regulating District
P-2318-054; P-12252-036......... Erie Boulevard Hydropower, L.P.
----------------------------------------------------------------------------------------------------------------
Certificates
----------------------------------------------------------------------------------------------------------------
C-1..................... CP22-44-000..................... Equitrans, L.P.
C-2..................... CP20-528-000; CP20-528-001; CP20- Stingray Pipeline Company, L.L.C.
529-000.
C-3..................... CP16-22-007..................... NEXUS Gas Transmission, LLC.
----------------------------------------------------------------------------------------------------------------
A free webcast of this event is available through the Commission's
website. Anyone with internet access who desires to view this event can
do so by navigating to www.ferc.gov's Calendar of Events and locating
this event in the Calendar. The Federal Energy Regulatory Commission
provides technical support for the free webcasts. Please call (202)
502-8680 or email [email protected] if you have any questions.
Immediately following the conclusion of the Commission Meeting, a
press briefing will be held in the Commission Meeting Room. Members of
the public may view this briefing in the designated overflow room. This
statement is intended to notify the public that the press briefings
that follow Commission meetings may now be viewed remotely at
Commission headquarters but will not be telecast.
Issued: June 8, 2023.
Debbie-Anne A. Reese,
Deputy Secretary.
[FR Doc. 2023-12738 Filed 6-9-23; 4:15 pm]
BILLING CODE 6717-01-P