Lock Hydro 10 Partners; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 39248 [2023-12812]

Download as PDF lotter on DSK11XQN23PROD with NOTICES1 39248 Federal Register / Vol. 88, No. 115 / Thursday, June 15, 2023 / Notices such as your name, SSN, and any other identifying information requested by the Department while processing the request to distinguish between individuals with the same name. Alternatively, you may make a Privacy Act request through the U.S. Department of Education, FOIA Service Center at https://www2.ed.gov/policy/ gen/leg/foia/request_privacy.html by completing the applicable request forms. If you wish to submit a request for notification to determine whether a record exists about you in the COD System as a title IV, HEA program applicant or recipient of a Federal grant or loan, please refer to the NOTIFICATION PROCEDURES section in the system of records notice entitled ‘‘Common Origination and Disbursement (COD) System’’ (18–11– 02). Borrowers are able to access their financial aid history from NSLDS in this system. If you wish to submit a request for notification to determine whether a record exists about you in the NSLDS system of records, please refer to the NOTIFICATION PROCEDURES section in the system of records notice entitled ‘‘National Student Loan Data System (NSLDS)’’ (18–11–06). If you wish to submit a request for notification to determine whether a record exists about you in a Federal Loan Servicer IT system, please refer to the NOTIFICATION PROCEDURES section in the system of records notice entitled ‘‘Common Services for Borrowers (CSB)’’ (18–11–16). If you wish to submit a request for notification to determine whether a record exists about you in EDMAPS system, please refer to the NOTIFICATION PROCEDURES section in the system of records notice entitled ‘‘Enterprise Data Management and Analytics Platform Services (EDMAPS) System’’ (18–11–22). If you wish to submit a request for notification to determine whether a record exists about you in the PAS system, please refer to the NOTIFICATION PROCEDURES section in the system of records notice entitled ‘‘Person Authentication Service (PAS)’’ (18–11–12). Requests for notification about whether the system of records contains information about an individual must meet the requirements of the Department’s Privacy Act regulations at 34 CFR 5b.5, including proof of identity. EXEMPTIONS PROMULGATED FOR THE SYSTEM: None. VerDate Sep<11>2014 17:54 Jun 14, 2023 Jkt 259001 HISTORY: The system of records entitled ‘‘Aid Awareness and Application Processing’’ (18–11–21) was originally published in full in the Federal Register on September 13, 2022 (87 FR 56026– 56037). [FR Doc. 2023–12831 Filed 6–14–23; 8:45 am] BILLING CODE 4000–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 15308–000] Lock Hydro 10 Partners; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On April 28, 2023, Lock Hydro 10 Partners filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of a hydropower project located on the Kentucky River, in Clark and Madison Counties, Kentucky. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed Boonesborough Hydroelectric Project would consist of the following: (1) an existing 250-footlong, 35-foot-high concrete lock and dam; (2) an existing 26.4-mile-long, 596acre reservoir having a total capacity of 5,960-acre-feet; (3) a proposed 28-footwide, 52-foot-long, 49-foot-high powerhouse built into the abandoned lock containing six Voith StreamDiver submersible turbine/generating units for a total installed capacity of 3.012 megawatts; (4) a proposed 20-foot-wide, 42-foot-long control building on the adjacent shore; and (5) a proposed 800foot-long, 14.0 kilovolt transmission line. The project is estimated to generate an average of 14,000 megawatt-hours annually. The existing lock and dam are owned by the Kentucky River Authority. Applicant Contact: David Brown Kinloch, Appalachian Hydro Associate, 414 S Wenzel Street, Louisville, KY 40204; Phone: (502) 589–0975, or by email at kyhydropower@gmail.com. FERC Contact: Michael Spencer; phone: (202) 502–6093, or by email at michael.spencer@ferc.gov. PO 00000 Frm 00030 Fmt 4703 Sfmt 9990 Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. The Commission’s Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, environmental justice communities, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202) 502–6595 or OPP@ ferc.gov. The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission’s eFiling system at https:// ferconline.ferc.gov/eFiling.aspx. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://ferconline.ferc.gov/ QuickComment.aspx. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include docket number P– 15308–000. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of the Commission’s website at https://elibrary.ferc.gov/eLibrary/search. Enter the docket number (P–15308) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: June 9, 2023. Kimberly D. Bose, Secretary. [FR Doc. 2023–12812 Filed 6–14–23; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\15JNN1.SGM 15JNN1

Agencies

[Federal Register Volume 88, Number 115 (Thursday, June 15, 2023)]
[Notices]
[Page 39248]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-12812]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 15308-000]


Lock Hydro 10 Partners; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions To Intervene, and 
Competing Applications

    On April 28, 2023, Lock Hydro 10 Partners filed an application for 
a preliminary permit, pursuant to section 4(f) of the Federal Power Act 
(FPA), proposing to study the feasibility of a hydropower project 
located on the Kentucky River, in Clark and Madison Counties, Kentucky. 
The sole purpose of a preliminary permit, if issued, is to grant the 
permit holder priority to file a license application during the permit 
term. A preliminary permit does not authorize the permit holder to 
perform any land-disturbing activities or otherwise enter upon lands or 
waters owned by others without the owners' express permission.
    The proposed Boonesborough Hydroelectric Project would consist of 
the following: (1) an existing 250-foot-long, 35-foot-high concrete 
lock and dam; (2) an existing 26.4-mile-long, 596-acre reservoir having 
a total capacity of 5,960-acre-feet; (3) a proposed 28-foot-wide, 52-
foot-long, 49-foot-high powerhouse built into the abandoned lock 
containing six Voith StreamDiver submersible turbine/generating units 
for a total installed capacity of 3.012 megawatts; (4) a proposed 20-
foot-wide, 42-foot-long control building on the adjacent shore; and (5) 
a proposed 800-foot-long, 14.0 kilovolt transmission line. The project 
is estimated to generate an average of 14,000 megawatt-hours annually. 
The existing lock and dam are owned by the Kentucky River Authority.
    Applicant Contact: David Brown Kinloch, Appalachian Hydro 
Associate, 414 S Wenzel Street, Louisville, KY 40204; Phone: (502) 589-
0975, or by email at [email protected].
    FERC Contact: Michael Spencer; phone: (202) 502-6093, or by email 
at [email protected].
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36.
    The Commission's Office of Public Participation (OPP) supports 
meaningful public engagement and participation in Commission 
proceedings. OPP can help members of the public, including landowners, 
environmental justice communities, Tribal members and others, access 
publicly available information and navigate Commission processes. For 
public inquiries and assistance with making filings such as 
interventions, comments, or requests for rehearing, the public is 
encouraged to contact OPP at (202) 502-6595 or [email protected].
    The Commission strongly encourages electronic filing. Please file 
comments, motions to intervene, notices of intent, and competing 
applications using the Commission's eFiling system at https://ferconline.ferc.gov/eFiling.aspx. Commenters can submit brief comments 
up to 6,000 characters, without prior registration, using the eComment 
system at https://ferconline.ferc.gov/QuickComment.aspx. You must 
include your name and contact information at the end of your comments. 
For assistance, please contact FERC Online Support at 
[email protected], (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, you may submit a paper copy. 
Submissions sent via the U.S. Postal Service must be addressed to: 
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 
First Street NE, Room 1A, Washington, DC 20426. Submissions sent via 
any other carrier must be addressed to: Kimberly D. Bose, Secretary, 
Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, 
Maryland 20852. The first page of any filing should include docket 
number P-15308-000.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of the 
Commission's website at https://elibrary.ferc.gov/eLibrary/search. 
Enter the docket number (P-15308) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

    Dated: June 9, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-12812 Filed 6-14-23; 8:45 am]
BILLING CODE 6717-01-P


This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.