Moulton Niguel Water District; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene, 37063-37064 [2023-11932]
Download as PDF
Federal Register / Vol. 88, No. 108 / Tuesday, June 6, 2023 / Notices
primary issues raised by the
commenters concerned impacts of the
Project on agricultural property and
agricultural operations. All substantive
environmental comments will be
addressed in the EA.
Additional Information
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
In order to receive notification of the
issuance of the EA and to keep track of
formal issuances and submittals in
specific dockets, the Commission offers
a free service called eSubscription. This
service provides automatic notification
of filings made to subscribed dockets,
document summaries, and direct links
to the documents. Go to https://
www.ferc.gov/ferc-online/overview to
register for eSubscription.
Additional information about the
Project is available from the
Commission’s Office of External Affairs
at (866) 208–FERC or on the FERC
website (www.ferc.gov). Using the
‘‘eLibrary’’ link, select ‘‘General Search’’
from the eLibrary menu, enter the
selected date range and ‘‘Docket
Number’’ excluding the last three digits
(i.e., CP23–82), and follow the
instructions. For assistance with access
to eLibrary, the helpline can be reached
at (866) 208–3676, TTY (202) 502–8659,
or at FERCOnlineSupport@ferc.gov. The
eLibrary link on the FERC website also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and rule
makings.
ddrumheller on DSK120RN23PROD with NOTICES1
Dated: May 30, 2023.
Kimberly D. Bose,
Secretary.
Dated: May 31, 2023.
Kimberly D. Bose,
Secretary.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[FR Doc. 2023–12076 Filed 6–5–23; 8:45 am]
[Project No. 7189–015]
BILLING CODE 6717–01–P
Green Lake Water Power Company;
Notice of Intent To Prepare an
Environmental Assessment
DEPARTMENT OF ENERGY
On March 31, 2022, Green Lake Water
Power Company filed a relicense
application for the 500-kilowatt Green
Lake Hydroelectric Project No. 7189
(project). The project is located on
Green Lake and Reeds Brook in Hancock
County, Maine.
In accordance with the Commission’s
regulations, on March 23, 2023,
Commission staff issued a notice that
the project was ready for environmental
analysis (REA Notice). Based on the
information in the record, including
comments filed on the REA Notice, staff
does not anticipate that licensing the
project would constitute a major federal
action significantly affecting the quality
of the human environment. Therefore,
staff intends to prepare an
Environmental Assessment (EA) on the
application to relicense the project.
The EA will be issued and circulated
for review by all interested parties. All
comments filed on the EA will be
analyzed by staff and considered in the
Commission’s final licensing decision.
The Commission’s Office of Public
Participation (OPP) supports meaningful
public engagement and participation in
Commission proceedings. OPP can help
members of the public, including
landowners, environmental justice
communities, Tribal members and
others, access publicly available
information and navigate Commission
processes. For public inquiries and
assistance with making filings such as
interventions, comments, or requests for
rehearing, the public is encouraged to
contact OPP at (202) 502–6595 or OPP@
ferc.gov.
The application will be processed
according to the following schedule.
Revisions to the schedule may be made
as appropriate.
Milestone
Commission issues
EA.
Comments on EA ......
Target date
November 2023.1
December 2023.
[FR Doc. 2023–11933 Filed 6–5–23; 8:45 am]
Any questions regarding this notice
may be directed to Amanda Gill at (202)
502–6773 or amanda.gill@ferc.gov.
BILLING CODE 6717–01–P
1 The Council on Environmental Quality’s (CEQ)
regulations under 40 CFR 1501.10(b)(1) require that
EAs be completed within 1 year of the federal
action agency’s decision to prepare an EA. This
VerDate Sep<11>2014
19:24 Jun 05, 2023
Jkt 259001
PO 00000
Frm 00059
Fmt 4703
Sfmt 4703
37063
Federal Energy Regulatory
Commission
[Project No. 7189–015]
Green Lake Water Power Company;
Notice of Waiver Period for Water
Quality Certification Application
On May 19, 2023, Green Lake Water
Power Company submitted to the
Federal Energy Regulatory Commission
(Commission) a copy of its application
for a Clean Water Act section 401(a)(1)
water quality certification filed with the
Maine Department of Environmental
Protection (Maine DEP), in conjunction
with the above captioned project.
Pursuant to 40 CFR 121.6 and section
5.23(b) of the Commission’s
regulations,1 we hereby notify the
Maine DEP of the following:
Date of Receipt of the Certification
Request: May 19, 2023.
Reasonable Period of Time to Act on
the Certification Request: One year, May
19, 2024.
If Maine DEP fails or refuses to act on
the water quality certification request on
or before the above date, then the
agency certifying authority is deemed
waived pursuant to section 401(a)(1) of
the Clean Water Act, 33 U.S.C.
1341(a)(1).
Dated: May 31, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–12075 Filed 6–5–23; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CD23–8–000]
Moulton Niguel Water District; Notice
of Preliminary Determination of a
Qualifying Conduit Hydropower
Facility and Soliciting Comments and
Motions To Intervene
On May 23, 2023, Moulton Niguel
Water District filed a notice of intent to
notice establishes the Commission’s intent to
prepare an EA for the Green Lake Hydroelectric
Project. Therefore, in accordance with CEQ’s
regulations, the EA must be issued within 1 year of
the issuance date of this notice.
1 18 CFR 5.23(b).
E:\FR\FM\06JNN1.SGM
06JNN1
37064
Federal Register / Vol. 88, No. 108 / Tuesday, June 6, 2023 / Notices
construct a qualifying conduit
hydropower facility, pursuant to section
30 of the Federal Power Act (FPA). The
proposed Bridlewood Flow Control
Facility Hydroelectric Energy Recovery
Project would have an installed capacity
of 224 kilowatts (kW), and would be
located along the applicant’s existing
water supply system in Laguna Hills,
Orange County, California.
Applicant Contact: Gregg Semler,
InPipe Energy, 920 SW 6th Ave., 12th
Floor, Portland, OR 97204, 503–341–
0004, gregg@inpipeenergy.com.
FERC Contact: Christopher Chaney,
202–502–6778, christopher.chaney@
ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The project would
consist of: (1) two 112-kW Centrifugal
pump as turbine generating units and
(2) appurtenant facilities. The proposed
project would have an estimated annual
generation of approximately 820
megawatt-hours.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all the criteria shown in
the table below.
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Statutory provision
Description
Satisfies
(Y/N)
FPA 30(a)(3)(A) ........................................
The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or
similar manmade water conveyance that is operated for the distribution of water
for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity.
The facility is constructed, operated, or maintained for the generation of electric
power and uses for such generation only the hydroelectric potential of a non-federally owned conduit.
The facility has an installed capacity that does not exceed 40 megawatts ................
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA.
Y
FPA 30(a)(3)(C)(i) .....................................
ddrumheller on DSK120RN23PROD with NOTICES1
FPA 30(a)(3)(C)(ii) ....................................
FPA 30(a)(3)(C)(iii) ...................................
Preliminary Determination: The
proposed Bridlewood Flow Control
Facility Hydroelectric Energy Recovery
Project will not alter the primary
purpose of the conduit, which is for
municipal water supply. Therefore,
based upon the above criteria,
Commission staff preliminarily
determines that the operation of the
project described above satisfies the
requirements for a qualifying conduit
hydropower facility, which is not
required to be licensed or exempted
from licensing.
Comments and Motions to Intervene:
Deadline for filing comments contesting
whether the facility meets the qualifying
criteria is 30 days from the issuance
date of this notice. Deadline for filing
motions to intervene is 30 days from the
issuance date of this notice.
Anyone may submit comments or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210 and
385.214. Any motions to intervene must
be received on or before the specified
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the ‘‘COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY’’
or ‘‘MOTION TO INTERVENE,’’ as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
VerDate Sep<11>2014
19:24 Jun 05, 2023
Jkt 259001
385.2001 through 385.2005 of the
Commission’s regulations.1 All
comments contesting Commission staff’s
preliminary determination that the
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, you
may send a paper copy. Submissions
sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room
1A, Washington, DC 20426.
Submissions sent via any other carrier
must be addressed to: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 12225 Wilkins Avenue,
Rockville, MD 20852. A copy of all
other filings in reference to this
application must be accompanied by
proof of service on all persons listed in
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 385.2010.
1 18
PO 00000
CFR 385.2001–2005 (2022).
Frm 00060
Fmt 4703
Sfmt 4703
Y
Y
Y
Locations of Notice of Intent: The
Commission provides all interested
persons an opportunity to view and/or
print the contents of this document via
the internet through the Commission’s
website at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (i.e., CD23–8) in the docket
number field to access the document.
You may also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
Copies of the notice of intent can be
obtained directly from the applicant.
For assistance, call toll-free 1–866–208–
3676 or email FERCOnlineSupport@
ferc.gov. For TTY, call (202) 502–8659.
Dated: May 30, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023–11932 Filed 6–5–23; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–10995–01–OA]
Public Meeting of the Science Advisory
Board Environmental Justice Screen
(EJScreen) Review Panel
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
The Environmental Protection
Agency (EPA) Science Advisory Board
(SAB) Staff Office is announcing a
SUMMARY:
E:\FR\FM\06JNN1.SGM
06JNN1
Agencies
[Federal Register Volume 88, Number 108 (Tuesday, June 6, 2023)]
[Notices]
[Pages 37063-37064]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2023-11932]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CD23-8-000]
Moulton Niguel Water District; Notice of Preliminary
Determination of a Qualifying Conduit Hydropower Facility and
Soliciting Comments and Motions To Intervene
On May 23, 2023, Moulton Niguel Water District filed a notice of
intent to
[[Page 37064]]
construct a qualifying conduit hydropower facility, pursuant to section
30 of the Federal Power Act (FPA). The proposed Bridlewood Flow Control
Facility Hydroelectric Energy Recovery Project would have an installed
capacity of 224 kilowatts (kW), and would be located along the
applicant's existing water supply system in Laguna Hills, Orange
County, California.
Applicant Contact: Gregg Semler, InPipe Energy, 920 SW 6th Ave.,
12th Floor, Portland, OR 97204, 503-341-0004, [email protected].
FERC Contact: Christopher Chaney, 202-502-6778,
[email protected].
Qualifying Conduit Hydropower Facility Description: The project
would consist of: (1) two 112-kW Centrifugal pump as turbine generating
units and (2) appurtenant facilities. The proposed project would have
an estimated annual generation of approximately 820 megawatt-hours.
A qualifying conduit hydropower facility is one that is determined
or deemed to meet all the criteria shown in the table below.
Table 1--Criteria for Qualifying Conduit Hydropower Facility
------------------------------------------------------------------------
Statutory provision Description Satisfies (Y/N)
------------------------------------------------------------------------
FPA 30(a)(3)(A)................ The conduit the Y
facility uses is a
tunnel, canal,
pipeline, aqueduct,
flume, ditch, or
similar manmade water
conveyance that is
operated for the
distribution of water
for agricultural,
municipal, or
industrial
consumption and not
primarily for the
generation of
electricity.
FPA 30(a)(3)(C)(i)............. The facility is Y
constructed,
operated, or
maintained for the
generation of
electric power and
uses for such
generation only the
hydroelectric
potential of a non-
federally owned
conduit.
FPA 30(a)(3)(C)(ii)............ The facility has an Y
installed capacity
that does not exceed
40 megawatts.
FPA 30(a)(3)(C)(iii)........... On or before August 9, Y
2013, the facility is
not licensed, or
exempted from the
licensing
requirements of Part
I of the FPA.
------------------------------------------------------------------------
Preliminary Determination: The proposed Bridlewood Flow Control
Facility Hydroelectric Energy Recovery Project will not alter the
primary purpose of the conduit, which is for municipal water supply.
Therefore, based upon the above criteria, Commission staff
preliminarily determines that the operation of the project described
above satisfies the requirements for a qualifying conduit hydropower
facility, which is not required to be licensed or exempted from
licensing.
Comments and Motions to Intervene: Deadline for filing comments
contesting whether the facility meets the qualifying criteria is 30
days from the issuance date of this notice. Deadline for filing motions
to intervene is 30 days from the issuance date of this notice.
Anyone may submit comments or a motion to intervene in accordance
with the requirements of Rules of Practice and Procedure, 18 CFR
385.210 and 385.214. Any motions to intervene must be received on or
before the specified deadline date for the particular proceeding.
Filing and Service of Responsive Documents: All filings must (1)
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as
applicable; (2) state in the heading the name of the applicant and the
project number of the application to which the filing responds; (3)
state the name, address, and telephone number of the person filing; and
(4) otherwise comply with the requirements of sections 385.2001 through
385.2005 of the Commission's regulations.\1\ All comments contesting
Commission staff's preliminary determination that the facility meets
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------
\1\ 18 CFR 385.2001-2005 (2022).
---------------------------------------------------------------------------
The Commission strongly encourages electronic filing. Please file
motions to intervene and comments using the Commission's eFiling system
at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at [email protected], (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, you may send a
paper copy. Submissions sent via the U.S. Postal Service must be
addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory
Commission, 888 First Street NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier must be addressed to: Kimberly
D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins
Avenue, Rockville, MD 20852. A copy of all other filings in reference
to this application must be accompanied by proof of service on all
persons listed in the service list prepared by the Commission in this
proceeding, in accordance with 18 CFR 385.2010.
Locations of Notice of Intent: The Commission provides all
interested persons an opportunity to view and/or print the contents of
this document via the internet through the Commission's website at
https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number
(i.e., CD23-8) in the docket number field to access the document. You
may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. Copies of the notice of
intent can be obtained directly from the applicant. For assistance,
call toll-free 1-866-208-3676 or email [email protected]. For
TTY, call (202) 502-8659.
Dated: May 30, 2023.
Kimberly D. Bose,
Secretary.
[FR Doc. 2023-11932 Filed 6-5-23; 8:45 am]