Federal Highway Administration – Federal Register Recent Federal Regulation Documents
Results 1,301 - 1,350 of 2,634
Buy America Waiver Notification
This notice provides information regarding the FHWA's finding that a Buy America waiver is appropriate for the use of 0.5 in. x 0.008 in. steel fibers with ultimate tensile strength of 290 ksi. in Ultra High Performance Concrete (UHPC) at the joints and closure pours between deck pours of a Federal-aid project; US-6 over D&RGW Railroad in Utah.
Agency Information Collection Activities: Request for Comments for a New Information Collection
The FHWA invites public comments about our intention to request approval from the Office of Management and Budget (OMB) for a new information collection, which is summarized below under SUPPLEMENTARY INFORMATION. We are required to publish this notice in the Federal Register by the Paperwork Reduction Act of 1995.
Proposed Policy Guidance on Metropolitan Planning Organization Representation
The FTA and FHWA are jointly issuing this proposed guidance on implementation of provisions of the Moving Ahead for Progress in the 21st Century Act (MAP-21), Public Law 112-141, that require representation by providers of public transportation in each metropolitan planning organization (MPO) that serves a transportation management area (TMA) no later than October 1, 2014. The purpose of this guidance is to assist MPOs and providers of public transportation in complying with this new requirement.
Environmental Impact Statement: Erie and Genesee Counties, New York
The FHWA is issuing this revised notice to advise the public that FHWA and NYSDOT will not be preparing an Environmental Impact Statement (EIS) for the proposed project to improve or relocate the Williamsville Toll Barrier in the counties of Erie and Genesee, New York (NYSDOT Project Identification Number: 5528.28). A Notice of Intent to prepare an EIS was published in the Federal Register on February 16, 2000.
Environmental Impact Statement; King County, Washington
The Federal Highway Administration is issuing this notice to advise the public that an Environmental Impact Statement (EIS) will be prepared for a proposed project to (1) manage congestion and traffic flow on I-90 between I-5 and I-405, which is in the Cross-Lake Washington Corridor, and (2) contribute revenue to the sustainable, long-term funding for timely completion of the SR 520 Bridge Replacement and HOV Program and maintenance and future transportation improvements on I-90. The total length of the corridor is approximately seven (7) miles. The scoping period for this EIS is October 7, 2013 through November 6, 2013.
Notice of Final Federal Agency Action on Proposed Highway in California
The FHWA, on behalf of the California Department of Transportation (Caltrans) is issuing this notice to advise the public that Federal actions taken by the California Department of Transportation (Department) pursuant to its assigned responsibilities under 23 U.S.C. 327, as well as actions by other Federal agencies, are final within the meaning of 23 U.S.C. 139 (l)(1). The actions relate to a proposed Interstate 5 Bus/Carpool Lanes Project (Post Miles 9.7 to 22.5), south of Elk Grove Blvd. to United States (US) Highway 50 in Sacramento County, State of California. This action grants approval for the project.
Agency Information Collection Activities: Request for Comments for a New Information Collection
FHWA invites public comments about our intention to request the Office of Management and Budget's (OMB) approval for a new information collection, which is summarized below under Supplementary Information. We published a Federal Register Notice with a 60-day public comment period on this information collection on March 5, 2013. We are required to publish this notice in the Federal Register by the Paperwork Reduction Act of 1995.
Notice of Final Federal Agency Actions on Proposed Highway in Illinois
This notice announces actions taken by the FHWA and other Federal agencies that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed highway project, U.S. Route 45 from IL Route 132 to IL Route 173 in Lake County, Illinois. Those actions grant licenses, permits, and approvals for the project.
Notice of Final Federal Agency Actions on State Highway 288 in Texas
This notice announces actions taken by the FHWA and other Federal agencies that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed highway project, State Highway 288, from (US) 59 south of downtown Houston, Harris County to County Road (CR) 60 in Brazoria County, Texas. Those actions grant licenses, permits, and approvals for the project.
Notice of Final Federal Agency Actions on the Proposed U.S. 50 Study Crossing Over Sinepauxent Bay in the Town of Ocean City, Worcester County, Maryland
This notice announces actions taken by the FHWA and other Federal agencies that are final within the meaning of 23 U.S.C. 139(l)(1). The action relates to the U.S. 50 Crossing over Sinepauxent Bay Study from MD 611 to MD 378 and 5th Street to Somerset Street located in the Town of Ocean City, Worcester County, Maryland. This action grants approval for the project.
Environmental Impact and Related Procedures-Programmatic Agreements and Additional Categorical Exclusions
This notice of proposed rulemaking (NPRM) provides interested parties with the opportunity to comment on proposed changes to the Federal Highway Administration (FHWA) and Federal Transit Administration (FTA) joint procedures that implement the National Environmental Policy Act (NEPA). The revisions are prompted by enactment of the Moving Ahead for Progress in the 21st Century Act (MAP-21). This NPRM proposes to: add new categorical exclusions (CE) for FHWA and FTA, allow a State department of transportation (State DOT) to process certain CEs without FHWA's detailed project-by-project review and approval (as long as the action meets specified constraints), and allow Programmatic Agreements between FHWA and States that would permit States to apply FHWA CEs on FHWA's behalf. The FHWA and FTA seek comments on the proposals contained in this notice.
Buy America Waiver Notification
This notice provides information regarding the FHWA's finding that a Buy America waiver is appropriate for the use of five non- domestic 14'' class 150 cast steel gate valves for rehabilitation of the Oxbow Bridge project in the State of Ohio.
Buy America Waiver Notification
This notice provides information regarding the FHWA's finding that a Buy America waiver is appropriate for re-use of historical bridge components for construction of Monon Trail Bridge over SR 25 in Indiana.
Major Project Financial Plan Guidance
This notice requests comments on draft Major Project Financial Plan Guidance outlining the procedures the FHWA will follow when reviewing and approving Financial Plans. The proposed Major Project Financial Plan Guidance incorporates changes required by the Moving Ahead for Progress in the 21st Century Act (MAP-21) and adopts a recommendation from a 2009 Government Accountability Office (GAO) report titled ``Federal-Aid Highways: FHWA Has Improved Its Risk Management Approach, but Needs to Improve Its Oversight of Project Costs.''
Notice of Final Federal Agency Actions on Proposed US 1 Improvements-Rockingham, Richmond County, NC
This notice announces actions taken by FHWA, and other Federal agencies that are final within the meaning of 23 U.S.C. 139 (l)(1). The actions relate to a proposed highway project, US 1 Improvements Rockingham, Richmond County, NC from Sandhill Road (SR 1971) to Marston Road (SR 1001). Those actions grant licenses, permits, and approvals for the project.
Surface Transportation Project Delivery Program Application Requirements
This NPRM provides interested parties with the opportunity to comment on proposed regulations that would govern the application requirements for the Surface Transportation Project Delivery Program (Program). The proposed regulations are prompted by enactment of the Moving Ahead for Progress in the 21st Century Act (MAP-21), which converted the Surface Transportation Project Delivery Pilot Program into a permanent program, allows any State to apply for the Program, expanded the scope of the Secretary's responsibilities that may be assigned and assumed under the Program, and created a renewal process for Program participation. The FHWA, FTA, and FRA, hereinafter referred to as the ``Agencies,'' seek comments on the proposals contained in this NPRM.
Value Engineering
The FHWA proposes to update the existing value engineering (VE) regulations to make the regulations consistent with the statutory changes in the Moving Ahead for Progress in the 21st Century Act (MAP- 21) and to make other non-substantive changes for clarity.
Revised Notice of Intent To Prepare an Environmental Impact Statement: Milwaukee County, Wisconsin
The FHWA is issuing this revised Notice of Intent to advise the public that the project limits for the I-94 East-West Corridor Environmental Impact Statement (EIS) will be extended; the project is located in Milwaukee County, Wisconsin.
Notice of Final Federal Agency Actions on Proposed Highway in Indiana
This notice announces actions taken by the FHWA and the USFWS that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to proposed highway projects for a 21 mile segment of I-69 in the Counties of Monroe and Morgan, State of Indiana, and grant licenses, permits, and approvals for the project.
Environmental Impact Statement: Interstate 81 Viaduct Project (Onondaga County, New York)
FHWA, as lead agency, is issuing this notice to advise the public that an Environmental Impact Statement (EIS) will be prepared for the proposed infrastructure improvements of Interstate 81 (I-81) in the greater Syracuse area, Onondaga County, New York.
Notice To Rescind a Notice of Intent and Draft Environmental Impact Statement: I-17 Corridor Improvement Study; Maricopa County, Arizona
The FHWA is issuing this notice to advise the public that we are rescinding the Notice of Intent (NOI) and Draft Environmental Impact Statement (EIS) for proposed freeway improvements along Interstate 17 (I-17) from the I-10/Maricopa Traffic Interchange to State Route (SR) 101L (Loop 101) within Maricopa County, Arizona. A NOI to prepare an EIS for the I-17 Corridor Improvement Study was published in the Federal Register on January 6, 2010.
2013 Temporary Closure of I-65 (I-70/I-65 South Split Interchange) in the City of Indianapolis
The FHWA has approved a request from the Indiana Department of Transportation (INDOT) to temporarily close a 2-mile portion of I-65 in Indiana (from I-70/I-65 south split interchange to I-70/I-65 north split interchange) for a period of 93 days, from Wednesday, August 21, to Thursday, November 21, 2013. The closure is requested to accommodate the reconstruction of the Virginia Avenue Bridge, which consists of replacing the northbound and southbound bridge girders and lowering the pavement section from south of Morris Street to north of Fletcher Avenue. The approval is granted in accordance with the provisions of 23 CFR 658.11 which authorizes the deletion of segments of the federally designated routes that make up the National Network designated in Appendix A of 23 CFR Part 658. The FHWA published a Notice and Request for Comment on July 1, 2013, seeking comments from the general public on this request submitted by the INDOT for a deletion in accordance with 23 CFR 658.11(d). No comments were received.
2013 Temporary Closure of I-395 Just South of Conway Street in the City of Baltimore to Vehicular Traffic To Accommodate the Construction and Operation of the Baltimore Grand Prix
The FHWA has approved a request from the Maryland Transportation Authority (MDTA) to temporarily close a portion of I-395 (just south of Conway Street in Baltimore City) from approximately 7 p.m. on Wednesday, August 28, 2013, until approximately 6 a.m. on Tuesday, September 3, 2013. The closure is requested to accommodate the construction and operation of the Baltimore Grand Prix (BGP), which will use the streets of downtown Baltimore as a race course. The approval is granted in accordance with the provisions of 23 CFR 658.11 which authorizes the deletion of segments of the federally designated routes that make up the National Network designated in Appendix A of 23 CFR Part 658. The FHWA published a Notice and Request for Comment on May 13, 2013, seeking comments from the general public on this request submitted by the MDTA for a deletion in accordance with 23 CFR 658.11(d). No comments were received.
Buy America Policy
The FHWA is extending the deadline for comments regarding the continued need, in whole or in part, for the general waivers from Buy America for manufactured products; for ferry boat equipment; and for pig iron and processed, pelletized, and reduced iron ores, which was published on July 10, 2013. The original deadline for submitting comments was August 9, 2013. This notice extends the deadline by 30 calendar days to September 8, 2013.
Notice of Funding Availability for the Tribal Transportation Program Safety Funds
This notice announces the availability of funding and requests grant applications for FHWA's Tribal Transportation Program Safety Funds (TTPSF). In addition, this notice addresses comments received on the interim notice of funding availability (Docket No. FHWA-2013-0012), announces selection criteria, application requirements, and technical assistance during the grant solicitation period for the TTPSF. The TTPSF is authorized within the Tribal Transportation Program (TTP) under the Moving Ahead for Progress in the 21st Century Act (MAP- 21). The FHWA will distribute these funds as described in this final notice on a competitive basis in a manner consistent with the selection criteria. On April 30, 2013, FHWA published an interim notice that announced funding availability. Because this is a new program, the interim notice also requested comments on the proposed selection and evaluation criteria. The FHWA considered the comments that were submitted in accordance with the interim notice. The FHWA's response to the comments and revisions made in this final notice are described below in the SUPPLEMENTARY INFORMATION section. In the event that this solicitation does not result in the award and obligation of all available funds, FHWA may decide to publish an additional solicitation.
Environmental Impact Statement; Calcasieu Parish, LA
The Federal Highway Administration is issuing this notice to advise the public that an Environmental Impact Statement (EIS) will be prepared for a proposed transportation project in Calcasieu Parish, Louisiana.
Environmental Impact Statement; Los Angeles and San Bernardino Counties, California; Notice of Intent
The FHWA, on behalf of the California Department of Transportation (Caltrans), is issuing this Revised Notice of Intent to inform the public of changes to the proposed High Desert Corridor project in Los Angeles and San Bernardino Counties, California. The Federal Railroad Administration has also been added as a Cooperating Agency.
Design-Build Contracting
This NPRM provides interested parties with the opportunity to comment on proposed changes to the FHWA requirements related to the use of alternative technical concepts (ATC) in design-build project delivery of highway construction. The revisions are intended to eliminate the requirement to submit a base proposal when a contracting agency allows design-build proposers to submit ATCs in their technical and price proposals. The FHWA seeks comments on the proposals contained in this notice.
Agency Information Collection Activities: Request for Comments for a New Information Collection
The FHWA invites public comments about our intention to request the Office of Management and Budget's (OMB) approval for a new information collection, which is summarized below under Supplementary Information. We are required to publish this notice in the Federal Register by the Paperwork Reduction Act of 1995.
Agency Information Collection Activities: Request for Comments for a New Information Collection
The FHWA invites public comments about our intention to request the Office of Management and Budget's (OMB) approval for a new information collection, which is summarized below under SUPPLEMENTARY INFORMATION. We are required to publish this notice in the Federal Register by the Paperwork Reduction Act of 1995.
Agency Information Collection Activities: Request for Comments for a New Information Collection
The FHWA invites public comments about our intention to request the Office of Management and Budget's (OMB) approval for a new information collection, which is summarized below under SUPPLEMENTARY INFORMATION. We are required to publish this notice in the Federal Register by the Paperwork Reduction Act of 1995.
Notice of Final Federal Agency Actions on Transportation Project in Washington State
This notice announces actions taken by the FHWA and other Federal agencies that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to the State Route 167 Puyallup to SR 509, Puyallup River Bridge Replacement Project, located in the City of Puyallup (Milepost [MP] 6.40) in Pierce County, Washington. The action by FHWA is the Record of Decision (ROD), which selects a new bridge and roadway alignment for southbound traffic, which will accommodate the future SR 167 Extension interchange and removes the existing steel truss as a last order of work. Actions by other Federal agencies include issuing permits.
National Tunnel Inspection Standards
The FHWA is proposing the National Tunnel Inspection Standards (NTIS) for highway tunnels. The FHWA previously proposed the NTIS in a notice of proposed rulemaking (NPRM) published in the Federal Register on July 22, 2010. On July 6, 2012, the President signed the Moving Ahead for Progress in the 21st Century Act (MAP-21), which requires the Secretary to establish national standards for tunnel inspections. The MAP-21 requires that NTIS contain a number of provisions that were not included in the proposal set forth in the earlier NPRM. As a result, FHWA is issuing this SNPRM to request comment on a revised NTIS proposal that incorporates the provisions required by MAP-21. This SNPRM proposes requirements for tunnel owners, including the establishment of a program for the inspection of highway tunnels, maintenance of a tunnel inventory, reporting of the inspection findings to FHWA, and correction of any critical findings identified during these inspections.
Proposed Memorandum of Understanding (MOU) Assigning Environmental Responsibilities to the State of Texas for Categorical Exclusions
This notice announces that the FHWA and the Texas Department of Transportation (State) have developed a proposed MOU, pursuant to 23 U.S.C. 326, under which the FHWA would assign to the State the FHWA's responsibility for determining whether a project is categorically excluded from preparation of an environmental assessment or an environmental impact statement under the National Environmental Policy Act of 1969, 42 U.S.C. 4321 et seq. (NEPA), and for carrying out certain other responsibilities for conducting environmental reviews, consultations, and related activities for Federal-aid highway projects. The public is invited to comment on any aspect of the proposed MOU, including the proposed designations of categorical exclusions and scope of environmental review, consultation and other activities to be assigned.
Notice of Final Federal Agency Actions on the Goethals Bridge Replacement Project in New York and New Jersey
This notice announces actions taken by the FHWA and other Federal agencies that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to the Goethals Bridge Replacement Project located in Staten Island, New York, and Elizabeth, New Jersey. Those actions grant approvals for the project.
Buy America Policy
The FHWA is seeking comments regarding the continued need, in whole or in part, for the general waivers from Buy America for manufactured products; for ferry boat equipment; and for pig iron and processed, pelletized, and reduced iron ores. These waivers have been in effect since 1983, 1994, and 1995, respectively. The FHWA is also seeking comment on the continuing need for the FHWA's minimal use threshold (currently established at $2,500 or 1/10 of 1 percent of the total contract value, whichever is greater).
Notice of Final Federal Agency Action on Proposed Highway in Georgia the Interstate 75 (I-75) Express, Clayton and Henry Counties, Georgia (Atlanta Metropolitan Area)
This notice announces actions taken by FHWA and other Federal agencies that are final within the meaning of 23 U.S.C. 139(l)(1). The I-75 Express Lanes Project will design a managed lane system along I-75 from the SR 155 (Zack Hinton Parkway, South) interchange in Henry County north to the SR 138 (Stockbridge Highway) interchange in Clayton counties, a distance of approximately 17.94 miles. Those actions grant licenses, permits and approvals for the project.
Notice of Final Federal Agency Action on Proposed Bridge Replacement in Massachusetts
This notice announces action taken by the FHWA and the United States Army Corps of Engineers (USACE) that is final within the meaning of 23 U.S.C. Sec. 139(l)(1). The actions relate to the proposed Mitchell River Bridge (Bridge Street over the Mitchell River) Replacement Project in Chatham-Barnstable County, Massachusetts. The action grants an approval for the project.
Temporary Closure of I-65 (I-70/I-65 South Split Interchange to I-70/I-65 North Split Interchange) in the City of Indianapolis
The Indiana Department of Transportation (INDOT) has requested FHWA approval of INDOT's proposed plan to close a 2-mile portion of I- 65 in Indiana (from I-70/I-65 south split interchange to I-70/I-65 north split interchange) for a period of 93 days, from Wednesday, August 21, 2013, to Thursday, November 21, 2013. The closure is requested to accommodate the reconstruction on the Virginia Avenue Bridge, which consists of replacing the northbound and southbound bridge girders and lowering the pavement section from south of Morris Street to north of Fletcher Avenue. The request is based on the provisions in 23 CFR 658.11 which authorizes the deletion of segments of the federally designated routes that make up the National Network designated in Appendix A of 23 CFR Part 658 upon approval by the FHWA. The FHWA seeks comments from the general public on this request submitted by INDOT for a deletion in accordance with 23 CFR 658.11(d) for the considerations discussed in this notice.
Agency Information Collection Activities: Request for Comments for a New Information Collection
The FHWA invites public comments about our intention to request approval from the Office of Management and Budget (OMB) for a new information collection, which is summarized below under SUPPLEMENTARY INFORMATION. We are required to publish this notice in the Federal Register by the Paperwork Reduction Act of 1995.
Agency Information Collection Activities: Request for Comments for a New Information Collection
FHWA invites public comments about our intention to request the Office of Management and Budget's (OMB) approval for a new information collection, which is summarized below under SUPPLEMENTARY INFORMATION. We published a Federal Register Notice with a 60-day public comment period on this information collection on February 15, 2013. We are required to publish this notice in the Federal Register by the Paperwork Reduction Act of 1995.
Agency Information Collection Activities: Request for Comments for a New Information Collection
The FHWA invites public comments about our intention to request the Office of Management and Budget's (OMB) approval for a new information collection, which is summarized below under SUPPLEMENTARY INFORMATION. We are required to publish this notice in the Federal Register by the Paperwork Reduction Act of 1995.
Agency Information Collection Activities: Request for Comments for a New Information Collection
The FHWA invites public comments about our intention to request the Office of Management and Budget's (OMB) approval for a new information collection, which is summarized below under SUPPLEMENTARY INFORMATION. We are required to publish this notice in the Federal Register by the Paperwork Reduction Act of 1995.
Agency Information Collection Activities: Request for Comments for a New Information Collection
FHWA invites public comments about our intention to request the Office of Management and Budget's (OMB) approval for a new information collection, which is summarized below under SUPPLEMENTARY INFORMATION. We published a Federal Register Notice with a 60-day public comment period on this information collection on March 22, 2013. We are required to publish this notice in the Federal Register by the Paperwork Reduction Act of 1995.
Environmental Impact Statements; National Summary of Rescinded Notices of Intent
The FHWA is issuing this notice to advise the public that five States have rescinded Notices of Intent (NOIs) to prepare nine Environmental Impact Statements (EIS) for proposed highway projects. The FHWA Division Offices, in consultation with the State departments of transportation (State DOT), determined that three projects were no longer viable and have formally cancelled the projects. No further Federal resources will be expended on these projects; the environmental review process has been terminated. Four projects are being reassessed and may be reconsidered in whole or in part, by the State DOT at a later time. One project is being rescoped and may not require an EIS. Finally, one project was rescinded without a specific reason for its rescission.
Environmental Impact Statement: Kenosha, Racine, Milwaukee, Waukesha, Washington, Dodge, Fond Du Lac, Winnebago, Outagamie and Brown Counties, Wisconsin
The FHWA is issuing this revised notice to advise the public that FHWA and Wisconsin Department of Transportation (WisDOT) will not prepare a Tier 1 Environmental Impact Statement (EIS) for the proposed Interstate conversion of U.S. Highway 41 in Milwaukee, Waukesha, Washington, Dodge, Fond du Lac, Winnebago, Outagamie, and Brown Counties, Wisconsin. A Notice of Intent to prepare an EIS was published in the Federal Register on July 26, 2011.
National Standards for Traffic Control Devices; Manual on Uniform Traffic Control Devices for Streets and Highways
The Manual on Uniform Traffic Control Devices (MUTCD) is incorporated in our regulations, approved by the Federal Highway Administration, and recognized as the national standard for traffic control devices used on all streets, highways, bikeways, and private roads open to public travel. Consistent with Executive Order 13563, and in particular its emphasis on burden-reduction and on retrospective analysis of existing rules, a Request for Comments was published on January 11, 2013, to solicit input on potential formats for restructuring the MUTCD into two documents, one that would be subject to rulemaking and one that would contain supplemental information that is not subject to rulemaking. One hundred and sixty-nine unique letters were received and this document provides a summary of the input from these letters. Given the lack of support from the MUTCD user community, the FHWA will not proceed with restructuring the MUTCD into two documents at this time.
Agency Information Collection Activities: Request for Comments for a New Information Collection
FHWA invites public comments about our intention to request the Office of Management and Budget's (OMB) approval for a new information collection, which is summarized below under SUPPLEMENTARY INFORMATION. We published a Federal Register Notice with a 60-day public comment period on this information collection on March 22, 2013. We are required to publish this notice in the Federal Register by the Paperwork Reduction Act of 1995.
Buy America Waiver Notification
This notice provides information regarding the FHWA's finding that a conditional Buy America waiver is appropriate for the obligation of Federal-aid funds for 74 vehicle projects involving the purchase of approximately 3,500 vehicles (including sedans, vans, pickups, SUVs, trucks, buses, and equipment, such as backhoes, street sweepers, and tractors), including projects to retrofit vehicles with individual vehicle components, so long as they are assembled in the United States. The FHWA's Buy America requirements provide that 100 percent of all steel and iron that is permanently incorporated into a project must be domestically manufactured. With respect to vehicles, manufacturers typically assemble these products with many different components and subcomponents containing steel and iron. As a result, vehicles are typically referred to as being made where the final product rolls off the assembly line for delivery into the marketplace. The FHWA is unaware of any vehicle that is comprised of 100 percent domestically produced steel and iron, resulting in a need for a conditional Buy America waiver for these projects to proceed.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.