Notice of Final Federal Agency Actions on Proposed Highway in Illinois, 58380-58381 [2013-22555]

Download as PDF 58380 Federal Register / Vol. 78, No. 184 / Monday, September 23, 2013 / Notices Any comment containing confidential information must be submitted by fax. A non-confidential summary of the confidential information must be submitted to www.regulations.gov. The non-confidential summary will be placed in the docket and will be open to public inspection. Pursuant to section 127(e) of the Uruguay Round Agreements Act (19 U.S.C. 3537(e)), USTR will maintain a docket on this dispute settlement proceeding, docket number USTR– 2013–0031, accessible to the public at www.regulations.gov. The public file will include non-confidential comments received by USTR from the public regarding the dispute. If a dispute settlement panel is convened, or in the event of an appeal from such a panel, the following documents will be made available to the public at www.ustr.gov: The United States’ submissions, any non-confidential submissions received from other participants in the dispute, and any non-confidential summaries of submissions received from other participants in the dispute. In the event that a dispute settlement panel is convened, or in the event of an appeal from such a panel, the report of the panel, and, if applicable, the report of the Appellate Body, will also be available on the Web site of the World Trade Organization, at www.wto.org. Comments open to public inspection may be viewed at www.regulations.gov. Juan Millan, Assistant United States Trade Representative for Monitoring and Enforcement. [FR Doc. 2013–23030 Filed 9–20–13; 8:45 am] BILLING CODE 3290–F3–P DEPARTMENT OF TRANSPORTATION Federal Aviation Administration Notice of Intent To Rule on Request To Release Airport Property at the Dallas/ Fort Worth International Airport, DFW Airport, Texas Federal Aviation Administration (FAA), DOT. AGENCY: Notice of request to release for permanent easement of airport property emcdonald on DSK67QTVN1PROD with NOTICES ACTION: The FAA proposes to rule and invite public comment on the release of land at the Dallas/Fort Worth International Airport under the provisions of Section 125 of the Wendell H. Ford Aviation Investment Reform Act for the 21st Century (AIR 21). SUMMARY: VerDate Mar<15>2010 20:16 Sep 20, 2013 Jkt 229001 Comments must be received on or before [Insert date 30 days of the posting of this Federal Register Notice]. DATES: Comments on this application may be mailed or delivered to the FAA at the following address: Mr. Mike Nicely, Manager, Federal Aviation Administration, Southwest Region, Airports Division, Texas Airports Development Office, ASW–650, Fort Worth, Texas 76193–0650. In addition, one copy of any comments submitted to the FAA must be mailed or delivered to Mr. Jeff Fegan, Chief Executive Office, at the following address: Dallas/Fort Worth International Airport, Executive Office, P.O. Box 619428, DFW Airport, Texas 75261. ADDRESSES: Mr. Rodney Clark, Program Manager, Federal Aviation Administration, Texas Airports Development Office, ASW– 651, 2601 Meacham Boulevard, Fort Worth, Texas 76193–0650, Telephone: (817) 222–5659, email: Rodney.Clark@ faa.gov, fax: (817) 222–5989. The request to release property may be reviewed in person at this same location. FOR FURTHER INFORMATION CONTACT: The FAA invites public comment on the request to release property at the Dallas/Fort Worth International Airport under the provisions of the AIR 21. On August 12, 2013, the FAA determined that the request for permanent easement at Dallas/Fort Worth International Airport, submitted by the Airport, met the procedural requirements of the Federal Aviation Regulations, Part 155. The FAA may approve the request, in whole or in part, no later than January 31, 2014. The following is a brief overview of the request: The Dallas/Fort Worth International Airport requests the release for permanent easement of 67.6175 acres of non-aeronautical airport property. The land was acquired by the Cities of Dallas and Fort Worth for use as an airport. The funds generated by the release will be used to develop, operate and maintain the Airport. Any person may inspect the request in person at the FAA office listed above under FOR FURTHER INFORMATION CONTACT. In addition, any person may, upon request, inspect the application, notice and other documents relevant to the application in person at the Dallas/Fort Worth International Airport, telephone number (972) 973–5200. SUPPLEMENTARY INFORMATION: PO 00000 Frm 00114 Fmt 4703 Sfmt 4703 Issued in Fort Worth, Texas on September 12, 2013. Kelvin L. Solco, Manager, Airports Division. [FR Doc. 2013–23071 Filed 9–20–13; 8:45 am] BILLING CODE 4910–13–P DEPARTMENT OF TRANSPORTATION Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway in Illinois Federal Highway Administration (FHWA), DOT. ACTION: Notice of limitation on claims for judicial review of actions by FHWA and other Federal agencies. AGENCY: This notice announces actions taken by the FHWA and other Federal agencies that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed highway project, U.S. Route 45 from IL Route 132 to IL Route 173 in Lake County, Illinois. Those actions grant licenses, permits, and approvals for the project. DATES: By this notice, the FHWA is advising the public of final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed on or before February 20, 2014. If the Federal law that authorizes judicial review of a claim provides a time period of less than 150 days for filing such claim, then that shorter time period still applies. FOR FURTHER INFORMATION CONTACT: Ms. Catherine A. Batey, Division Administrator, Federal Highway Administration, 3250 Executive Park Drive, Springfield, Illinois 62703, Phone: (217) 492–4640, Email address: Catherine.Batey@dot.gov. The FHWA Illinois Division Office’s normal business hours are 7:30 a.m. to 4:15 p.m. You may also contact Mr. John A. Fortmann, P.E., Illinois Department of Transportation, Deputy Director of Highways, Region One Engineer, 201 West Center Court, Schaumburg, Illinois 60196, Phone: (847) 705–4000. The Illinois Department of Transportation Region One’s normal business hours are 8:00 a.m. to 4:15 p.m. SUPPLEMENTARY INFORMATION: Notice is hereby given that the FHWA and other Federal agencies have taken final agency actions by issuing licenses, permits, and approvals for the following highway project in the State of Illinois: reconstruct and widen U.S. Route 45 (FAP 0344) from IL Route 132 to IL Route 173, a distance of approximately SUMMARY: E:\FR\FM\23SEN1.SGM 23SEN1 Federal Register / Vol. 78, No. 184 / Monday, September 23, 2013 / Notices emcdonald on DSK67QTVN1PROD with NOTICES 5.5 miles including a western bypass of U.S. Route 45 around the Millburn Historic District. The actions by the Federal agencies, and the laws under which such actions were taken, are described in the Environmental Assessment (EA) for the project approved on February 28, 2013 the Finding of No Significant Impact (FONSI) issued on September 9, 2013; and in other documents in the FHWA administrative record. The EA, FONSI, and other documents in the FHWA administrative record file are available by contacting the FHWA or the Illinois Department of Transportation at the addresses provided above. The EA and FONSI and all other supporting documentation can be viewed and downloaded from the project Web site at www.route45project.com. This notice applies to all Federal agency decisions as of the issuance date of this notice and all laws under which such actions were taken, including but not limited to: 1. General: National Environmental Policy Act (NEPA) [42 U.S.C. 4321– 4351] Federal-Aid Highway Act [23 U.S.C. 109 and 23 U.S.C. 128]. 2. Air: Clean Air Act [42 U.S.C. 7401– 7671(q)]. 3. Land: Section 4(f) of the Department of Transportation Act of 1966 [49 U.S.C. 303 and 23 U.S.C. 138]. 4. Social and Economic: Civil Rights Act of 1964 [42 U.S.C. 2000(d)– 2000(d)(1)]. 5. Historic and Cultural Resources: Section 106 of the National Historic Preservation Act of 1966, as amended [16 U.S.C. 470(f) et seq.]; Archaeological and Historic Preservation Act (AHPA) [16 U.S.C. 469–469(c)]. 6. Wildlife: Endangered Species Act [16 U.S.C. 1531–1544 and Section 1536]; Migratory Bird Treaty Act [16 U.S.C. 703–712]. 7. Wetlands and Water Resources: Clean Water Act (Section 401 and 404) [33 U.S.C. 1251–1377]; Wild and Scenic Rivers Act [16 U.S.C. 1271–1287]. 8. Executive Orders: E.O. 11990 Protection of Wetlands; E.O. 11988 Floodplain Management; E.O. 12898 Federal Actions to Address Environmental Justice in Minority Populations and Low Income Populations. (Catalog of Federal Domestic Assistance Program Number 20.205, Highway Planning and Construction. The regulations implementing Executive Order 12372 regarding intergovernmental consultation on Federal programs and activities apply to this program.) Authority: 23 U.S.C. 139(l)(1). VerDate Mar<15>2010 20:16 Sep 20, 2013 Jkt 229001 Issued on: September 9, 2013. Catherine A. Batey, Division Administrator, Springfield, Illinois. 58381 Highway (SH) 288 from (US) 59 south of downtown Houston, Harris County to County Road (CR) 60 in Brazoria County. The project will be a 41.8 km [FR Doc. 2013–22555 Filed 9–20–13; 8:45 am] (26 mi) long. It will begin at US 59 in BILLING CODE 4910–RY–P Harris County and then proceed south through Brazoria County and end at CR DEPARTMENT OF TRANSPORTATION 60. The proposed improvements will be constructed in phases. The interim Federal Highway Administration phase (Phase 1) of the project will involve the construction of two toll Notice of Final Federal Agency Actions lanes from US 59 to State Highway (SH) on State Highway 288 in Texas 6 and direct connector (DC) improvements at Beltway (BW) 8, new AGENCY: Federal Highway overpasses at selected, existing at-grade Administration (FHWA), DOT. intersections (part of the toll facility) ACTION: Notice of limitation on claims and some ramp and frontage road for judicial review of actions by FHWA improvements. The ultimate project and other Federal agencies. (Phase 2) will add two additional toll SUMMARY: This notice announces actions lanes from US 59 to SH 6, providing a taken by the FHWA and other Federal total of four toll lanes (two in each agencies that are final within the direction); add one additional generalmeaning of 23 U.S.C. 139(l)(1). The purpose lane in each direction from actions relate to a proposed highway Interstate Highway (IH) 610 to BW 8, project, State Highway 288, from (US) resulting in a total of four general59 south of downtown Houston, Harris purpose lanes in each direction; and County to County Road (CR) 60 in will extend four toll lanes from SH 6 Brazoria County, Texas. Those actions southward to CR 60. Direct-connector grant licenses, permits, and approvals improvements at IH 610 and BW 8, and for the project. new overpasses at selected, existing atDATES: By this notice, the FHWA is grade intersections (part of the toll advising the public of final agency facility) will be constructed during the actions subject to 23 U.S.C. 139(l)(1). A ultimate phase of the project. If funding claim seeking judicial review of the becomes available, the ultimate (Phase Federal agency actions on the highway 2) configuration will be constructed project will be barred unless the claim along with the interim (Phase 1). The is filed on or before February 20, 2014. purpose of the project is to is to alleviate If the Federal law that authorizes congestion along the SH 288 corridor judicial review of a claim provides a from US 59 to CR 60 and to improve time period of less than 150 days for access to the Texas Medical Center. filing such claim, then that shorter time The actions by the Federal agencies, period still applies. and the laws under which such actions FOR FURTHER INFORMATION CONTACT: Mr. were taken, are described in the Gregory Punske, P.E., District Engineer, Environmental Assessment (EA) for the District B (South), Federal Highway project, approved for further processing Administration, 300 East 8th Street, on January 23, 2013, in the FHWA Room 826, Austin, Texas 78701; Finding of No Significant (FONSI) telephone: (512) 536–5960; email: issued on May 23, 2013, and in other gregory.punske@fhwa.dot.gov. The documents in the FHWA project files. FHWA Texas Division Office’s normal The EA, FONSI, and other documents in business hours are 7:45 a.m. to 4:15 p.m. the FHWA project file are available by (central time) Monday through Friday. contacting the FHWA or the Texas You may also contact Mr. Carlos Department of Transportation at the Swonke, Environmental Affairs addresses provided above. The FHWA Division, Texas Department of EA and FONSI can be viewed and Transportation, 118 E. Riverside Drive, downloaded from the following Web Austin, Texas 78704; telephone: (512) site: https://www.txdot.gov/inside-txdot/ 416–2734; email: projects/studies/houston/sh288.html. Carlos.Swonke@txdot.gov. The Texas This notice applies to all Federal Department of Transportation normal agency decisions as of the issuance date business hours are 8 a.m. to 5 p.m. of this notice and all laws under which (central time) Monday through Friday. such actions were taken, including but SUPPLEMENTARY INFORMATION: Notice is not limited to: hereby given that the FHWA and other 1. General: National Environmental Federal agencies have taken final agency actions by issuing licenses, permits, and Policy Act (NEPA) [42 U.S.C. 4321– 4335]; Federal-Aid Highway Act [23 approvals for the following highway U.S.C. 109]. project in the State of Texas: State PO 00000 Frm 00115 Fmt 4703 Sfmt 4703 E:\FR\FM\23SEN1.SGM 23SEN1

Agencies

[Federal Register Volume 78, Number 184 (Monday, September 23, 2013)]
[Notices]
[Pages 58380-58381]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2013-22555]


-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Federal Highway Administration


Notice of Final Federal Agency Actions on Proposed Highway in 
Illinois

AGENCY: Federal Highway Administration (FHWA), DOT.

ACTION: Notice of limitation on claims for judicial review of actions 
by FHWA and other Federal agencies.

-----------------------------------------------------------------------

SUMMARY: This notice announces actions taken by the FHWA and other 
Federal agencies that are final within the meaning of 23 U.S.C. 
139(l)(1). The actions relate to a proposed highway project, U.S. Route 
45 from IL Route 132 to IL Route 173 in Lake County, Illinois. Those 
actions grant licenses, permits, and approvals for the project.

DATES: By this notice, the FHWA is advising the public of final agency 
actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review 
of the Federal agency actions on the highway project will be barred 
unless the claim is filed on or before February 20, 2014. If the 
Federal law that authorizes judicial review of a claim provides a time 
period of less than 150 days for filing such claim, then that shorter 
time period still applies.

FOR FURTHER INFORMATION CONTACT: Ms. Catherine A. Batey, Division 
Administrator, Federal Highway Administration, 3250 Executive Park 
Drive, Springfield, Illinois 62703, Phone: (217) 492-4640, Email 
address: Catherine.Batey@dot.gov. The FHWA Illinois Division Office's 
normal business hours are 7:30 a.m. to 4:15 p.m. You may also contact 
Mr. John A. Fortmann, P.E., Illinois Department of Transportation, 
Deputy Director of Highways, Region One Engineer, 201 West Center 
Court, Schaumburg, Illinois 60196, Phone: (847) 705-4000. The Illinois 
Department of Transportation Region One's normal business hours are 
8:00 a.m. to 4:15 p.m.

SUPPLEMENTARY INFORMATION: Notice is hereby given that the FHWA and 
other Federal agencies have taken final agency actions by issuing 
licenses, permits, and approvals for the following highway project in 
the State of Illinois: reconstruct and widen U.S. Route 45 (FAP 0344) 
from IL Route 132 to IL Route 173, a distance of approximately

[[Page 58381]]

5.5 miles including a western bypass of U.S. Route 45 around the 
Millburn Historic District. The actions by the Federal agencies, and 
the laws under which such actions were taken, are described in the 
Environmental Assessment (EA) for the project approved on February 28, 
2013 the Finding of No Significant Impact (FONSI) issued on September 
9, 2013; and in other documents in the FHWA administrative record. The 
EA, FONSI, and other documents in the FHWA administrative record file 
are available by contacting the FHWA or the Illinois Department of 
Transportation at the addresses provided above. The EA and FONSI and 
all other supporting documentation can be viewed and downloaded from 
the project Web site at www.route45project.com.
    This notice applies to all Federal agency decisions as of the 
issuance date of this notice and all laws under which such actions were 
taken, including but not limited to:
    1. General: National Environmental Policy Act (NEPA) [42 U.S.C. 
4321-4351] Federal-Aid Highway Act [23 U.S.C. 109 and 23 U.S.C. 128].
    2. Air: Clean Air Act [42 U.S.C. 7401-7671(q)].
    3. Land: Section 4(f) of the Department of Transportation Act of 
1966 [49 U.S.C. 303 and 23 U.S.C. 138].
    4. Social and Economic: Civil Rights Act of 1964 [42 U.S.C. 
2000(d)-2000(d)(1)].
    5. Historic and Cultural Resources: Section 106 of the National 
Historic Preservation Act of 1966, as amended [16 U.S.C. 470(f) et 
seq.]; Archaeological and Historic Preservation Act (AHPA) [16 U.S.C. 
469-469(c)].
    6. Wildlife: Endangered Species Act [16 U.S.C. 1531-1544 and 
Section 1536]; Migratory Bird Treaty Act [16 U.S.C. 703-712].
    7. Wetlands and Water Resources: Clean Water Act (Section 401 and 
404) [33 U.S.C. 1251-1377]; Wild and Scenic Rivers Act [16 U.S.C. 1271-
1287].
    8. Executive Orders: E.O. 11990 Protection of Wetlands; E.O. 11988 
Floodplain Management; E.O. 12898 Federal Actions to Address 
Environmental Justice in Minority Populations and Low Income 
Populations.

(Catalog of Federal Domestic Assistance Program Number 20.205, 
Highway Planning and Construction. The regulations implementing 
Executive Order 12372 regarding intergovernmental consultation on 
Federal programs and activities apply to this program.)


    Authority:  23 U.S.C. 139(l)(1).

    Issued on: September 9, 2013.
Catherine A. Batey,
Division Administrator, Springfield, Illinois.
[FR Doc. 2013-22555 Filed 9-20-13; 8:45 am]
BILLING CODE 4910-RY-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.