Notice of Intent To Prepare a Supplement to the Draft Northern Pass Transmission Line Project Environmental Impact Statement and Announcing the Extension of the Public Comment Period and Postponement of Public Hearings To Receive Comments on the Draft Environmental Impact Statement
In August 2015, the U.S. Department of Energy (DOE) received an amendment to the July 2013 Northern Pass Transmission Line Project Presidential permit amended application. The August 2015 application amendment changed the proposed transmission line route by adding three miles of buried transmission line adjacent to a road not previously analyzed, added two new transition stations and increased the total amount of proposed buried transmission line from approximately 8 miles to approximately 60 miles. In addition, the amendment proposed a minor shift in the international border crossing location and identified some other project changes. The proposed transmission line route and associated changes in the amended application is a new ``Applicant's Preferred Alternative.'' The Supplement to the Draft EIS will present an analysis of the new Applicant's Preferred Alternative. This analysis will compare the new proposed transmission line route and configuration (above ground/ underground) against the alternatives currently presented in the Draft EIS. To accommodate public review and comment on both the Draft EIS and the Supplement to the Draft EIS, DOE is extending the public comment period until December 31, 2015. DOE has canceled the public hearings on the Draft EIS that were to be held in October 2015 and will reschedule those hearings after the Supplement to the Draft EIS is issued.
Settlement Intervals and Shortage Pricing in Markets Operated by Regional Transmission Organizations and Independent System Operators
The Federal Energy Regulatory Commission (Commission) is proposing to revise its regulations to require that each regional transmission organization (RTO) and independent system operator (ISO) settle energy transactions in its real-time markets at the same time interval it dispatches energy and settle operating reserves transactions in its real-time markets at the same time interval it prices operating reserves. The Commission also proposes to revise its regulations to require that each RTO/ISO trigger shortage pricing for any dispatch interval during which a shortage of energy or operating reserves occurs. Adopting these reforms would align prices with resource dispatch instructions and operating needs, providing appropriate incentives for resource performance.
Availability of Certain North American Electric Reliability Corporation Databases to the Commission
The Federal Energy Regulatory Commission (Commission) proposes to amend its regulations to require the North American Electric Reliability Corporation (NERC) to provide the Commission, and Commission staff, with access, on a non-public and ongoing basis, to certain databases compiled and maintained by NERC. The Commission's proposal applies to the following NERC databases: The Transmission Availability Data System, the Generating Availability Data System, and the protection system misoperations database. Access to these databases, which will be limited to data regarding U.S. facilities, will provide the Commission with information necessary to determine the need for new or modified Reliability Standards and to better understand NERC's periodic reliability and adequacy assessments.
Collection of Connected Entity Data From Regional Transmission Organizations and Independent System Operators
The Federal Energy Regulatory Commission (Commission) proposes to amend its regulations to require each regional transmission organization (RTO) and independent system operator (ISO) to electronically deliver to the Commission, on an ongoing basis, data required from its market participants that would; first identify the market participants by means of a common alpha-numeric identifier; and secondly list their ``Connected Entities,'' which includes entities that have certain ownership, employment, debt, or contractual relationships to the market participants, as specified in this NOPR; and finally describe in brief the nature of the relationship of each Connected Entity. Such information will assist screening and investigative efforts to detect market manipulation, an enforcement priority of the Commission. The initiative would also assist market monitors for the RTOs and ISOs in their individual and joint investigations of potential cross-market manipulation. Unless the RTOs and ISOs request continuation of existing affiliate disclosure requirements based on a particularized need, the Commission expects that this new disclosure obligation will supplant all existing affiliate disclosures requirements contained in the RTOs and ISOs tariffs. The proposed definitional uniformity of the term ``Connected Entity'' across all of the RTOs and ISOs may help ease compliance burdens on market participants that are active in more than one RTO or ISO, and that are now required to submit affiliate information that may be unique to each of the organized markets in which they participate.
Proposed Agency Information Collection
EIA published a notice in the Federal Register of September 15, 2015, inviting public comment on the proposed three-year extension of its Oil and Gas Reserves System Surveys. This document replaces that notice and corrects an error in the Web site address for the collection instruments and instructions. EIA invites public comment on the proposed three-year extension of the following Oil and Gas Reserves System Survey Forms that EIA is developing for submission to the Office of Management and Budget (OMB) pursuant to the Paperwork Reduction Act of 1995: Revision of Form EIA- 23L, Annual Survey of Domestic Oil and Gas Reserves, Field Level Report; extension without changes of Form EIA-64A, Annual Report of the Origin of Natural Gas Liquids Production; and continued suspension of Form EIA-23S, Annual Survey of Domestic Oil and Gas Reserves, Summary Level Report. Comments are invited on: (a) Whether the proposed collection of information is necessary for the proper performance of the functions of the agency, including whether the information shall have practical utility; (b) the accuracy of the agency's estimate of the burden of the proposed collection of information, including the validity of the methodology and assumptions used; (c) ways to enhance the quality, utility, and clarity of the information to be collected; and (d) ways to minimize the burden of the collection of information on respondents, including through the use of automated collection techniques or other forms of information technology.
Agency Information Collection Extension
The EIA has submitted an information collection request to the OMB for extension under the provisions of the Paperwork Reduction Act of 1995. The information collection requests a three-year extension, without change, of its Form EIA-886, Annual Survey of Alternative Fuel Vehicles, OMB Control Number 1905-0191. The proposed collection will gather information on the number and type of alternative fueled vehicles (AFVs) and other advanced technology vehicles that vehicle suppliers made available in the previous calendar year and plan to make available in the following calendar year; the number, type and geographic distribution of AFVs in use in the previous calendar year; and the amount and distribution of each type of alternative transportation fuel (ATF) consumed in the previous calendar year.
RC Cape May Holdings, LLC; Notice of Institution of Section 206 Proceeding and Refund Effective Date
Disturbance Monitoring and Reporting Requirements Reliability Standard
The Federal Energy Regulatory Commission approves Reliability Standard PRC-002-2 (Disturbance Monitoring and Reporting Requirements) submitted by the North American Electric Reliability Corporation. The purpose of Reliability Standard PRC-002-2 is to have adequate data available to facilitate analysis of bulk electric system disturbances.
Commission to Review the Effectiveness of the National Energy Laboratories
This notice announces a teleconference call of the Commission to Review the Effectiveness of the National Energy Laboratories (Commission). The Commission was created pursuant to section 319 of the Consolidated Appropriations Act, 2014, Public Law 113-76, and in accordance with the provisions of the Federal Advisory Committee Act (FACA), as amended, 5 U.S.C., App. 2. This notice is provided in accordance with the Act.
DOE/NSF Nuclear Science Advisory Committee; Notice of Open Meeting
This notice announces a meeting of the DOE/NSF Nuclear Science Advisory Committee (NSAC). Federal Advisory Committee Act (Pub. L. 92- 463, 86 Stat. 770) requires that public notice of these meetings be announced in the Federal Register.
Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance Reliability Standard
Pursuant to the Federal Power Act, the Commission approves a revised Reliability Standard, PRC-005-4 (Protection System, Automatic Reclosing and Sudden Pressure Relaying Maintenance), developed and submitted by the North American Electric Reliability Corporation (NERC). In addition, the Commission approves one new definition and four revised definitions referenced in the proposed Reliability Standard, as well as the assigned violation risk factors and violation severity levels, and the associated implementation plan. Consistent with Order No. 758, the proposed Reliability Standard requires applicable entities to test and maintain certain sudden pressure relays as part of a protection system maintenance program.
Relay Performance During Stable Power Swings Reliability Standard
The Federal Energy Regulatory Commission proposes to approve Reliability Standard PRC-026-1 (Relay Performance During Stable Power Swings), submitted by the North American Electric Reliability Corporation. The proposed Reliability Standard is designed to ensure that applicable entities use protective relay systems that can differentiate between faults and stable power swings. In addition, the Commission requests comment regarding the potential burden of modifying the applicability of proposed Reliability Standard PRC-026-1 to include relays with a time delay of 15 cycles or greater in instances where either (1) an element has been identified by a Planning Coordinator as potentially susceptible to power swings or (2) an entity becomes aware of a bulk electric system element that tripped in response to a stable or unstable power swing due to the operation of its protective relay(s), even if the element was not previously identified by the planning coordinator.
Environmental Management Site-Specific Advisory Board, Northern New Mexico
This notice announces a combined meeting of the Environmental Monitoring and Remediation Committee and Waste Management Committee of the Environmental Management Site-Specific Advisory Board (EM SSAB), Northern New Mexico (known locally as the Northern New Mexico Citizens' Advisory Board [NNMCAB]). The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this meeting be announced in the Federal Register.
Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards
This rule finalizes the Department of Energy (DOE)'s part of the Federal Awarding Agency Regulatory Implementation of Office of Management and Budget's Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards joint interim rule which was issued December 19, 2014 and makes several technical corrections to DOE's portion of the interim final rule. DOE is not making new policy with either the interim final rule or this final rule. All regulatory language included here is consistent with either the policies in the Uniform Guidance or DOE's existing policies and practices.