Pacific Gas and Electric Company; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests, 57601-57602 [2015-24243]

Download as PDF Federal Register / Vol. 80, No. 185 / Thursday, September 24, 2015 / Notices 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene, or protests should relate to the non-project use application. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Dated: September 18, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2015–24242 Filed 9–23–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 1333–064] tkelley on DSK3SPTVN1PROD with NOTICES Pacific Gas and Electric Company; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Application for Amendment of License. b. Project No.: 1333–064. c. Date Filed: September 14, 2015. d. Applicant: Pacific Gas and Electric Company (licensee). e. Name of Project: Tule River Hydroelectric Project. f. Location: On the North Fork of the Middle Fork Tule River, Hossack Creek, and Doyle Springs, in Tulare County, California. The project occupies U.S. Forest Service lands within the Sequoia National Forest. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Ms. Elisabeth Rossi, License Coordinator, Pacific Gas and Electric Company, Mail Code: VerDate Sep<11>2014 16:45 Sep 23, 2015 Jkt 235001 N11C, P.O. Box 770000, San Francisco, CA 94177. Phone (415) 973–3082. i. FERC Contact: Mr. Mark Pawlowski, (202) 502–6052, or mark.pawlowski@ ferc.gov. j. Deadline for filing comments, motions to intervene, protests, and recommendations is 30 days from the issuance date of this notice by the Commission. The Commission strongly encourages electronic filing. Please file motions to intervene, protests, comments, or recommendations using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Please include the project number (P– 1333–064) on any comments, motions to intervene, protests, or recommendations filed. k. Description of Request: The licensee requests that the minimum flow requirements of article 105 of the license for the Tule Project be revised to reflect the requirements of the conditions submitted by the U.S. Forest Service (FS) pursuant to its mandatory conditioning authority under section 4(e) of the Federal Power Act. Article 105 requires the licensee to release from Tule Diversion Dam a minimum ‘‘target’’ flow of 4 cubic feet per second (cfs) in dry water years and a minimum ‘‘target’’ flow of 2 cfs from Doyle Springs Diversion Dam where the ‘‘target’’ flow is defined as the daily average flow at each dam and an instantaneous flow of not less than 10 percent of the daily average flow. However, the FS’s condition 5 filed with the Commission on October 31, 1989 and November 26, 1991, requires the licensee to release from Tule Diversion Dam a minimum ‘‘target’’ flow of 4 cfs in dry water years and a minimum ‘‘target’’ flow of 2 cfs from Doyle Springs Diversion Dam, or the natural instream flow, whichever is less. The licensee requests that article 105 be revised to make it clear that the minimum flow requirements are dependent on and subject to the natural instream flow of the Tule River at Tule Diversion Dam and Doyle Springs Diversion Dam. PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 57601 l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene, or protests should relate to project works which are the subject of the license surrender. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served E:\FR\FM\24SEN1.SGM 24SEN1 57602 Federal Register / Vol. 80, No. 185 / Thursday, September 24, 2015 / Notices upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Dated: September 18, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2015–24243 Filed 9–23–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission tkelley on DSK3SPTVN1PROD with NOTICES Combined Notice of Filings #1 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER12–569–008; ER13–712–008; ER10–1849–007; ER11–2037–007; ER12–2227– 007;ER10–1852–011; ER10–1887–007; ER10–1920– 009;ER10–1928–009; ER10–1952–007; ER12–1228– 009;ER10–1961–007; ER14–2707–004; ER10–2720– 009;ER11–4428–009; ER12–1880–008; ER12–895– 007;ER10–1971–021; ER14–2710–004; ER15–58–002;ER15– 30–002; ER14–2708–005; ER14–2709– 004;ER13–2474–003 Applicants: Blackwell Wind, LLC, Cimarron Wind Energy, LLC, Elk City Wind, LLC, Elk City II Wind, LLC, Ensign Wind, LLC Florida Power & Light Company, FPL Energy Cowboy Wind, LLC, FPL Energy Oklahoma Wind, LLC, FPL Energy Sooner Wind, LLC, Gray County Wind Energy, LLC, High Majestic Wind II, LLC, High Majestic Wind Energy Center, LLC, Mammoth Plains Wind Project, LLC, Minco Wind, LLC, Minco Wind II, LLC, Minco Wind III, LLC, Minco Wind Interconnection Services, LLC, NextEra Energy Power Marketing, LLC, Palo Duro Wind Energy, LLC, Palo Duro Wind Interconnection Services, LLC, Seiling Wind Interconnection Services, LLC, Seiling Wind, LLC, Seiling Wind II, LLC, Steel Flats Wind Project, LLC VerDate Sep<11>2014 16:45 Sep 23, 2015 Jkt 235001 Description: Notification of Change in Status of NextEra Resources Entities. Filed Date: 9/17/15. Accession Number: 20150917–5156. Comments Due: 5 p.m. ET 10/8/15. Docket Numbers: ER13–2073–002. Applicants: Source Power & Gas LLC. Description: Notification of Change in Status by Source Power & Gas LLC. Filed Date: 9/17/15. Accession Number: 20150917–5148. Comments Due: 5 p.m. ET 10/8/15. Docket Numbers: ER14–649–004. Applicants: Midcontinent Independent System Operator, Inc., Entergy Services, Inc. Description: Compliance filing: 2015– 09–17_Entergy Attachment O Compliance Filing ER13–948 to be effective 11/1/2015. Filed Date: 9/17/15. Accession Number: 20150917–5114. Comments Due: 5 p.m. ET 10/8/15. Docket Numbers: ER15–883–003. Applicants: Southern California Edison Company. Description: Tariff Amendment: Executed GIA and Executed Distrib Serv Agmt with San Gorgonio Westwinds II, LLC to be effective 1/20/2015. Filed Date: 9/18/15. Accession Number: 20150918–5003. Comments Due: 5 p.m. ET 10/9/15. Docket Numbers: ER15–2662–000. Applicants: PacifiCorp. Description: Section 205(d) Rate Filing: Dugway Non-Conforming SGIA to be effective 9/9/2015. Filed Date: 9/17/15. Accession Number: 20150917–5116. Comments Due: 5 p.m. ET 10/8/15. Docket Numbers: ER15–2663–000. Applicants: Entergy Gulf States Louisiana, L.L.C. Description: Compliance filing: EGSL Compliance (ER14–73) 9–17–2015 to be effective 12/19/2013. Filed Date: 9/17/15. Accession Number: 20150917–5119. Comments Due: 5 p.m. ET 10/8/15. Docket Numbers: ER15–2664–000. Applicants: Entergy Louisiana, LLC. Description: Compliance filing: ELL Compliance (ER14–73) 9–17–2015 to be effective 12/19/2013. Filed Date: 9/17/15. Accession Number: 20150917–5122. Comments Due: 5 p.m. ET 10/8/15. Docket Numbers: ER15–2665–000. Applicants: Entergy Mississippi, Inc. Description: Compliance filing: EMI Compliance (ER14–73) 9–17–2015 to be effective 12/19/2013. Filed Date: 9/17/15. Accession Number: 20150917–5123. Comments Due: 5 p.m. ET 10/8/15. Docket Numbers: ER15–2666–000. PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 Applicants: Entergy New Orleans, Inc. Description: Compliance filing: ENOI Compliance (ER14–73) 9–17–2015 to be effective 12/19/2013. Filed Date: 9/17/15. Accession Number: 20150917–5124. Comments Due: 5 p.m. ET 10/8/15. Docket Numbers: ER15–2667–000. Applicants: Entergy Texas, Inc. Description: Compliance filing: ETI Compliance (ER14–73) 9–17–2015 to be effective 12/19/2013. Filed Date: 9/17/15. Accession Number: 20150917–5125. Comments Due: 5 p.m. ET 10/8/15. Docket Numbers: ER15–2668–000. Applicants: Land of the Sky MT, LLC. Description: Baseline eTariff Filing: Application for Market-Based Rate Tariff, Blanket Approval and Waivers to be effective 10/1/2015. Filed Date: 9/17/15. Accession Number: 20150917–5144. Comments Due: 5 p.m. ET 10/8/15. Docket Numbers: ER15–2669–000. Applicants: Southwest Power Pool, Inc. Description: Notice of Cancellation of Firm Point-To-Point Transmission Service Agreement No. 1487 of Southwest Power Pool, Inc. Filed Date: 9/18/15. Accession Number: 20150918–5054. Comments Due: 5 p.m. ET 10/9/15. Docket Numbers: ER15–2670–000. Applicants: Midcontinent Independent System Operator, Inc. Description: Section 205(d) Rate Filing: 2015–09–18_SA 2698 OTPNorthern States Power Company 1st Rev GIA (J262/J263) to be effective 9/19/ 2015. Filed Date: 9/18/15. Accession Number: 20150918–5089. Comments Due: 5 p.m. ET 10/9/15. Take notice that the Commission received the following electric securities filings: Docket Numbers: ES15–70–000. Applicants: Georgia Power Company. Description: Application of Georgia Power Company for authorization to issue securities. Filed Date: 9/17/15. Accession Number: 20150917–5147. Comments Due: 5 p.m. ET 10/8/15. Take notice that the Commission received the following electric reliability filings: Docket Numbers: RD15–7–000. Applicants: North American Electric Reliability Corporation. Description: Petition of the North American Electric Reliability Corporation for Approval of Proposed Interconnection Reliability Operations and Coordination Reliability Standards. E:\FR\FM\24SEN1.SGM 24SEN1

Agencies

[Federal Register Volume 80, Number 185 (Thursday, September 24, 2015)]
[Notices]
[Pages 57601-57602]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2015-24243]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 1333-064]


Pacific Gas and Electric Company; Notice of Application Accepted 
for Filing, Soliciting Comments, Motions To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Application for Amendment of License.
    b. Project No.: 1333-064.
    c. Date Filed: September 14, 2015.
    d. Applicant: Pacific Gas and Electric Company (licensee).
    e. Name of Project: Tule River Hydroelectric Project.
    f. Location: On the North Fork of the Middle Fork Tule River, 
Hossack Creek, and Doyle Springs, in Tulare County, California. The 
project occupies U.S. Forest Service lands within the Sequoia National 
Forest.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: Ms. Elisabeth Rossi, License Coordinator, 
Pacific Gas and Electric Company, Mail Code: N11C, P.O. Box 770000, San 
Francisco, CA 94177. Phone (415) 973-3082.
    i. FERC Contact: Mr. Mark Pawlowski, (202) 502-6052, or 
mark.pawlowski@ferc.gov.
    j. Deadline for filing comments, motions to intervene, protests, 
and recommendations is 30 days from the issuance date of this notice by 
the Commission. The Commission strongly encourages electronic filing. 
Please file motions to intervene, protests, comments, or 
recommendations using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. Please include the project number (P-1333-064) on 
any comments, motions to intervene, protests, or recommendations filed.
    k. Description of Request: The licensee requests that the minimum 
flow requirements of article 105 of the license for the Tule Project be 
revised to reflect the requirements of the conditions submitted by the 
U.S. Forest Service (FS) pursuant to its mandatory conditioning 
authority under section 4(e) of the Federal Power Act. Article 105 
requires the licensee to release from Tule Diversion Dam a minimum 
``target'' flow of 4 cubic feet per second (cfs) in dry water years and 
a minimum ``target'' flow of 2 cfs from Doyle Springs Diversion Dam 
where the ``target'' flow is defined as the daily average flow at each 
dam and an instantaneous flow of not less than 10 percent of the daily 
average flow. However, the FS's condition 5 filed with the Commission 
on October 31, 1989 and November 26, 1991, requires the licensee to 
release from Tule Diversion Dam a minimum ``target'' flow of 4 cfs in 
dry water years and a minimum ``target'' flow of 2 cfs from Doyle 
Springs Diversion Dam, or the natural instream flow, whichever is less. 
The licensee requests that article 105 be revised to make it clear that 
the minimum flow requirements are dependent on and subject to the 
natural instream flow of the Tule River at Tule Diversion Dam and Doyle 
Springs Diversion Dam.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street NE., Room 2A, Washington, 
DC 20426, or by calling (202) 502-8371. This filing may also be viewed 
on the Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits 
in the docket number field to access the document. You may also 
register online at https://www.ferc.gov/docs-filing/esubscription.asp to 
be notified via email of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208-3676 or email 
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item 
(h) above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents: Any filing must (1) 
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or 
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis and otherwise comply with the requirements of 18 CFR 
4.34(b). All comments, motions to intervene, or protests should relate 
to project works which are the subject of the license surrender. 
Agencies may obtain copies of the application directly from the 
applicant. A copy of any protest or motion to intervene must be served

[[Page 57602]]

upon each representative of the applicant specified in the particular 
application. If an intervener files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency. A copy of all other 
filings in reference to this application must be accompanied by proof 
of service on all persons listed in the service list prepared by the 
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 
385.2010.

    Dated: September 18, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-24243 Filed 9-23-15; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.